Technical Proposal Director
-
Jun 2018 - Present
-
-
Senior Project Controls Manager
-
Sep 2015 - May 2018
Technical Proposal Director, June 2018 – presentIn the capacity of Technical Proposal Director, provide strategic solutions for the delivery of multiple projects, establish and lead the technical and engineering processes, and manage and guide the preparation of the technical deliverables during the tender stage including but not limited to: Method of Construction, Execution Programmes, Quality, and HSE Plans, Logistics and Deployments Plans, Project Resources and Cash Flow, review and ensure that all Engineering Requirements have been incorporated and applied in full compliance with the Tender Documents, Provide technical and operational solutions for the delivery of the projects to ensure projects’ delivery on time and with the most optimum cost, and providing monitoring and Tracking systems to measure and report the progress of work during the construction stage.Senior Project Controls Manager, September 2015 – June 2018Responsible for managing a group of projects including a VIP Royal Palace, Residential and Commercial Towers, and governmental Projects, managing the implementation of Project Controls policies, process and procedures, and activities, managing the planning of the business unit of WSD (WorkShop Department) in terms of labors’ hiring, rotating and dismissing as per the projects’ requirements, Developing templates for projects tracking using KPIs and performance measurements to ensure smooth achievable of projects’ targets, managing the preparation of company Cash Flow for revenue and cost forecast and managing the preparation of E.O.T claims
-
-
United States
-
Construction
-
700 & Above Employee
-
Project Controls Manager
-
Sep 2014 - Jul 2015
Project Description: Dubai Parks is one of the most contemporary iconic them park projects in the world, it consists of 5 phases. Phase 1 is under construction and includes 3 main parks; those are Motion Gate, Bollywood and Legoland. Phase 2 (Six Flags) is in the planning phase and expected to start construction by October, 2015. Project phases are planned to be completed by 2023.Role & Responsibilities: Prepare Strategic Master Schedule for the different project phases. Prepare the Master Schedule for rides and show coordinated with the overall Master Programme Manage all rides and show vendors. Manage interfacing between rides and show as well as with civil works. implement project control process through the tender stage with rides and show vendors. Prepare monthly reports for client and Hill’s management.
-
-
Programme Planning Manager
-
Jul 2012 - Sep 2014
Programme Description: The Midfield New Terminal complex is planned to handle up to 35 million passengers per year. Programme comprises many packages:-o Midfield Terminal Building (MTB) includes Structural Systems, Roof and facade, Fit out, BHS and Airport Systems.o Airside and Airside Package (MTA) includes infrastructure systems, taxi, in addition to Airside and Apron systems as AGL, VGDS, PCA, and Jet Fuel.o (MTL) package includes Primary and Secondary Roads, Bridges, Landside Infrastructure, MTB Car Park, External Landscape, Long Term Car Park and other Service Buildings. Programme is planned to be completed within 48 months. Programme Budget is about 18,000 M.AED.Tasks and responsibilities: Develop and direct the Preparation, updating, monitoring and reporting the Master Programme includes all packages and phases as planning, tendering, construction and closing out. Review delivery strategies for all packages. Incorporate variation orders into baseline programmes. Supervise the process to review, comment and approve all main contractors planning and control submittals as baseline programme, Monthly progress programmes, recovery programmes, extension of time programmes (whenever required), weekly and monthly reports. Interfacing management between the different packages. Assure the compliance of general contractor submittals to the project control requirements. Arrange and lead the weekly planning and control meetings with main contractors. Review, comment and respond accordingly to the main contractor’s extension of time claims. Evaluate and figure out Projects progress based on Earned Value Management System (EVMS) and KPIs for major activities. Supervise the preparation Client Monthly Report, Variance Trend Reports, Total Float Management Reports, Monthly Cash Flow, Engineering and Procurement Trackers, Flash Report and Chairman Briefing report.
-
-
Associated Project Director - Dubai Area
-
May 2010 - Jun 2012
-
Dubai
Arabian Construction Company ACC – May-2010 – May-2012- Working in Dubai as Regional Planning Manager – Dubai Area in the following Major Projects.- Mild Field New Terminal Abu-Dhabi Airport – Tender Stageo The project is planned to handle up to 40 to 50 million passengers per year.o The built up area is around 630,000 m2.o Project Duration 46 months.o Project client - Supervision Committee for Expansion of the Abu Dhabi International Airport (SCADIA). Role is the Planning Team Leader for the JV (Samsung, ACC & SIXCO) planning team to prepare the detailed Tender Programme with 2 options (Half and Full X)- Al-Ain Hospital – Tender Stageo Al-Ain Hospital is a new general hospital of 600 beds. o The built up area is around 500,000 m2. o Project duration 63 month.- Elite Residence – 84 Stories at Dubai Marina Dubai – AED 750M - Princess Tower – 100 Stories at Dubai Marina Dubai - AED 840M- Plot 50-51 – 2 buildings of 25 Stories at Business Bay – AED 300M
-
Oger Dubai L.L.C
-
Dubai & Saudi Arabia
-
Project Controls Manager
-
Jul 2006 - May 2010
-
Dubai & Saudi Arabia
Worked in Dubai as Project Control Manager – Dubai, in the following Major Projects.Major Projects Worked On: Churchill Towers at the Business Bay, Dubai AED 1,800M The Buildings by Daman at DIFC, Dubai AED 1,600M. Cleveland Clinic – Tender StageAl-Khafji, Saudi Arabia: As a Planning Manager Programme budget 1,136 M.SR Working in construction Programme includes 3 Projects –o MTD & Integrated Workshop project.o Office Park Project and Community Project, as a Planning Manager. Programme budget 1,136 M.S.R.Responsible for the Following Tasks: Develop and direct implementation of goals, procedures of the Planning and Control functions. Participate and assist the project director in preparing the Project Methodology for execution to achieve project goals for both time and budget. Prioritizing and allocating available resources and manage change control procedures. Reporting on time variances, trends, extension of time entitlements using different delay analysis techniques as “Impacted as Planned”, “Time Impact Analysis”, “Window Slides”, “As Planned Versus as Built”, etc.., and to recommend corrective measures. Developing systems and maintaining records that provide for the proper evaluation, controlling and documentation of assigned activities; preparing and directing the preparation of a variety of written correspondence, reports, procedures, directives and other materials.
-
GETCO Algeris
-
Alger, Algeria
-
Project Manager
-
Jul 2005 - May 2006
-
Alger, Algeria
World Trade Center Project, Project Budget 50 M.$
-
-
Planning Manager
-
Jun 2004 - Jun 2005
-
Doha, Qatar
Doha High Rise Office Tower Project. Design and Build Project of High-Rise Building, as a Planning Manager, Project Budget 426 M.Q.RResponsible for the Following Tasks: Participate and assist the project manager in preparing the Project Methodology for execution to achieve project goals for both time and budget. Prepare weekly and monthly reports. Reporting on time variances, trends, extension of time entitlements using different delay analysis techniques as “Impacted as Planned”, “Time Impact Analysis”, “Window Slides”, “As Planned Versus as Built”, etc.., and to recommend corrective measures. Developing systems and maintaining records that provide for the proper evaluation, controlling and documentation of assigned activities; preparing and directing the preparation of a variety of written correspondence, reports, procedures, directives and other materials.
-
Murray & Roberts Group
-
Alexandria, Egypt
-
Senior Planning Engineer
-
Sep 2000 - Jun 2004
-
Alexandria, Egypt
San Stefano Grand Plaza (Mixed-Use Project) – Alexandra. High Rise 36 floors Building as a Senior Planning Engineer. Project budget 125 M.$.Responsible for the Following Tasks: Responsible for preparing and coordinate all time schedules for client & sub-contractors. Monitor & update baseline programme including and prepare monthly reports. Prepare short term and recovery programme whenever required. Prepare extension of time programmes.
-
Saudi Binladin Group (SBG)
-
Cairo, Egypt
-
Planning and Cost Control Engineer
-
Jul 1997 - Aug 2000
-
Cairo, Egypt
Mega Market Project, Dreamland 6th October, Cairo, Egypt, Project Budget LE 120 M.
-
CONSULTANT GROUP OFFICE
-
Cairo, Egypt
-
Site Engineer
-
Jul 1993 - Jul 1997
-
Cairo, Egypt
Responsible for the supervision of a group of projects.
-
Education
-
2020 - 2020AGC of America - LCI Qatar
Certificate of Management - Lean Construction (CM-Lean), Project Management -
2014 - 2016Heriot-Watt University
Master Degree, Strategic Project Management -
1987 - 1993Ain Shams University
Bachelor of Architecture (B.Arch.), Architectural Engineering -
1983 - 1986Tawfikia Secondry School
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Construction”