Bio
Experience
-
blu-3 (UK) Limited
-
AMS13/14, Westlanderweg 11, Middenmeer, Netherlands
-
Setting out Engineer
-
Sep 2022 - Present
-
AMS13/14, Westlanderweg 11, Middenmeer, Netherlands
-
-
-
Balfour Beatty plc
-
Hinkley Point C
-
Tunnel Engineer
-
Sep 2021 - Sep 2022
-
Hinkley Point C
-
-
-
BYLOR Joint Venture
-
Hinkley Point C
-
Setting out Engineer
-
Mar 2021 - Jun 2021
-
Hinkley Point C
-
-
-
-
Senior Engineer
-
Feb 2020 - Mar 2021
Damhead Creek Power Station, Rochester, ME3 9TX - 02/2020 - 06/2020Encora Energy, Hobland’s Farm, Great Yarmouth, NR31 - 01/2021 - 03/2021
-
-
-
-
Senior Engineer
-
Aug 2020 - Dec 2020
Align JV – South Portal, HS2 Section C1, Maple Cross, WD3 9XN
-
-
-
-
Senior Engieer
-
Apr 2018 - Dec 2019
-
Kent
Construction of 104 dwellings over Peters Village site and 210 dwellings over Coxheath site.
-
-
-
STERLING CONSTRUCTION WORKS LTD
-
Chatham
-
Project Manager / Senior Engineer
-
Sep 2017 - Apr 2018
-
Chatham
Construction of 2 separate commercial units (Sales and Valet building) with a car park showroom housing up to 2000 vehicles.
-
-
-
Weiser Construction LTD
-
Gillingham
-
Senior Engineer
-
Nov 2016 - Aug 2017
-
Gillingham
The work consisted of the demolition of 3 no retail units to make way for a new Aldi/Harveys & one other unit to be let, totalling approx 55,000 sq.ft of retail (demolition of existing unit, cut and fill, deep drainage - participating in the design of it, new foundations, services, tree protection zone, QA, etc)
-
-
-
Coinford Ltd
-
Kidbrooke Village Phase 3, London SE3
-
Senior Engineer
-
Sep 2016 - Nov 2016
-
Kidbrooke Village Phase 3, London SE3
-
-
-
Costain Skanska JV
-
Paddington
-
Shift Engineer
-
May 2016 - Sep 2016
-
Paddington
-
-
-
Byrne Bros (Formwork)
-
Limmo Peninsula Shaft, Canning Town, London, E16
-
Senior Engineer (tunnels)
-
Dec 2015 - May 2016
-
Limmo Peninsula Shaft, Canning Town, London, E16
I was contracted as a Senior Engineer managing project and it’s quality during construction process on the night shift. I was monitoring progress of work, supervising contractors and site engineers. The package contained: casting in-situ secondary lining in the backshunt tunnels and Auxiliary shaft, building of RC walls in the Main Shaft (slipform methodology) and casting RC slabs at varies levels.
-
-
-
Kilnbridge Construction Services Lmited
-
C360 Eleanor Street Shaft, Bow, London, E3
-
Senior Engineer
-
Nov 2015 - Dec 2015
-
C360 Eleanor Street Shaft, Bow, London, E3
Working as Senior Engineer I was providing engineering services during the construction of the RC core walls in the ventilation shaft (jump-form methodology) and looking after groundwork package. I was also supervising a junior site engineer.
-
-
-
Costain Laing O'Rourke JV - CoLOR JV - London Underground
-
Bond Street Station Upgrade, London
-
Senior Engineer (Tunnels)
-
Aug 2014 - Nov 2015
-
Bond Street Station Upgrade, London
I was working on London Underground Bond Street Station Upgrade project consisting of construction of two new SCL passenger tunnels, SCL concourses, SCL escalator shaft and staircases, lift shafts (for step free access) and timber headings (under and over bridges) as an additional access route and an improved interchange between the Central and Jubilee lines to increase daily capacity to 255,000 passengers. Also, building of a new connection between London Underground and new Crossrail station.
-
-
-
-
Senior Engineer
-
2015 - 2015
-
-
-
BAM Ferrovial Kier JV - BFK JV - Crossrail
-
C300/410 (SCL Cross Passage and First Stage Concrete within running tunnels)
-
Tunnel Shift Manager
-
Apr 2014 - Aug 2014
-
C300/410 (SCL Cross Passage and First Stage Concrete within running tunnels)
Construction of SCL Cross Passage (CP4a) and First Stage Concrete (FSC) within running tunnelsPreparing method statements, toolbox talk’s, daily briefings and other Health &Safety related communications to ensure safe working practice and working environment.Responsible for Silver phone and emergency procedure activation.Working together with pit bosses, engineers and the client in order to implement and assure compliance with the RESS. Maintain works check sheets in accordance with the ITP, provide updates at daily SRG meetings.Check early strength testing, maintaining records. Including penetrometer test, Hilti pullout and in-situ cores.Organize plant, materials, and consumables on a day-to-day basis.Daily shift reports, progress reports quantities/quality of materials and plant.
-
-
-
Costain Skanska JV - CS JV - Crossrail
-
C360 Eleanor Street and Mile End Park Shafts
-
Senior SCL Engineer
-
Nov 2013 - Mar 2014
-
C360 Eleanor Street and Mile End Park Shafts
Support the Section Engineer / Tunnel Manager in the Engineering requirements of the project, to include overseeing subcontractor’s works: checking the setting out of the excavation, checking the setting out the shotcrete line, compiling baseline information for the H&S reports e.g. incidents, lost time, monitoring of the shotcrete lining tolerances / designed lining thickness, ensure properties of materials used are in line with design and specifications, ensure samples produced are taken in accordance with inspection and test planning, compiling shift reports, reporting progress, hours worked, materials, track records on materials delivered (compiling delivery notes), spoil disposal etc
-
-
-
BAM Ferrovial Kier JV - BFK JV - Crossrail
-
C435 Farringdon Main Station
-
SCL Shift Engineer
-
Mar 2013 - Nov 2013
-
C435 Farringdon Main Station
Project: Farringdon Main Station – Sprayed Concrete Lining tunnelsSCL Phase 1 at Western Ticket Hall, Cowcross StreetRoles & Responsibilties: Setting out of the excavation line, setting out the shotcrete line, compiling baseline information for the H&S reports e.g. incidents, lost time, monitoring of the shotcrete lining tolerances / designed lining thickness, ensure properties ofmaterials used are in line with design and specifications, ensure samples produced are taken in accordance with inspection and test planning, compiling shift reports, reporting progress, hours worked, materials, track records on materials delivered (compiling delivery notes), spoil disposal etc
-
-
-
-
United Kingdom
-
Construction
-
300 - 400 Employee
-
Senior Engineer – 2nd Project Manager
-
Sep 2011 - Mar 2013
Project: Zenith House II – residential buildingsThe biggest(approximately 100 m2) residential RC Basement car park in London with RC Podium closing it and on top of all9 no 6 – 16 storey high rise PT slabs buildings including all surrounding drainage worksRoles & Responsibilties: Supervising and supporting information for engineers, sub contracts supervision, checking rebar and liaison with consultants, ordering materials, establishing dimensional control, managing remedial works, maintainingprograms and schedules
-
-
Site Engineer
-
Jul 2011 - Sep 2011
Setting out Engineer Project: Hawkins Wharf – residential buildingsProject contained 4 no RC frame residential buildings on top of RC Basement car park and RC PodiumRoles & Responsibilties: Setting out – foundations, drainage, civils, RC frame (columns, slabs, beams, retaining walls), sub contracts supervision, checking rebar and liaison with consultants,ordering materials, establishing dimensional control
-
-
Site Engineer / Setting out Engineer
-
Jul 2010 - Jul 2011
Project: Woodberry Down KSS1 – residential buildingsBlock A Tower – 27 storey RC frame residential building on top of RC Basement car park and RC PodiumRoles & Responsibilties: Setting out – groundworks, drainage, civils, RC frame (pile caps, raft slabs, columns, slabs, beams, retaining walls, jump form), checking rebar and liaison with consultants, establishing dimensional control
-
-
Site Engineer / Setting out Engineer
-
May 2010 - Jun 2010
Project: Kingston Unversity (Dorich House) – commercial buildingNew university buildingRoles & Responsibilties: Setting out – groundworks, drainage
-
-
Site Engineer / Setting out Engineer
-
Oct 2009 - Jan 2010
Project: Flying Angel – residential buildingExtension of an old RC frameRoles & Responsibilties: Setting out – RC frame(columns, slabs, beams)
-
-
Site Engineer / Setting out Engineer
-
Sep 2009 - Oct 2009
St Giles Site – residential and commercial buildingsRoles & Responsibilties: Setting out – preparation for the landscape works(„topping up”main RC structure), drainage, levels and lines for paving, site paperwork07/02009 –; Project: Runnymede on – Thames Hotel – commercialHotel regenerationRoles & Responsibilties: Setting out – landscape works(curves and kerb lines, car park drainage, groundworks)
-
MPG Group
-
Amelia Street
-
Site Engineer / Setting out Engineer
-
Mar 2009 - Jun 2009
-
Amelia Street
Project: Amelia Street – residential buildings Project contained 4 blocks on the curveRoles & Responsibilties: Setting out – gridlines for dryliners on the whole project
-
-
Site Engineer / Setting out Engineer
-
Sep 2008 - Feb 2009
Project: 9 – 15 The Parade – residential buildingFrom RC Basement to RC 1st floor slabRoles & Responsibilties: Setting out – groundworks, drainage, RC frame(columns, slabs, beams)
-
-
Site Engineer
-
Sep 2008 - Dec 2008
Setting out Engineer Project: Lidl Supermarket – new car park entranceSection 278 worksRoles & Responsibilties: Setting out – kerb lines, levels, drainage, services
-
John Reddington Limited - JRL
-
22 Marsh Wall – The Landmark E14
-
Site Engineer / Setting out Engineer
-
Sep 2007 - Sep 2008
-
22 Marsh Wall – The Landmark E14
Project: 22 Marsh Wall – The Landmark E14 – residential buildingBlock 1, West Tower – 33storey RC frame on top of RC Podium with RC Basement car park belowRoles & Responsibilties: Setting out – groundworks, drainage, RC frame (pilecaps, raft slabs, columns, slabs, beams, retaining walls, jump form), checking rebar and liaison with consultants
-
-
Assistant of Land Surveyor
-
Aug 2007 - Sep 2007
Project: Wembley City Regeneration SchemeTopographical survey of the siteRoles & Responsibilties: Assisting in topographical survey of the site
-
AGH University of Science and Technology
-
The Zelazny Most – tailings pond KGHM Polska Miedz S.A.
-
Assistant of Land Surveyor
-
Jun 2006 - Jun 2007
-
The Zelazny Most – tailings pond KGHM Polska Miedz S.A.
Project: The Zelazny Most – tailings pondMonitoring of a tailings pondRoles & Responsibilties: Assisting in monitoring measurements of The Zelazny Most tailings pond (KGHM Polska Miedz S.A)
-
-
Assistant of Setting out Engineer / Land Surveyor
-
Apr 2006 - Jun 2007
Building sites across Krakow cityRoles & Responsibilties: Assisting in setting out / topographical survey of the sites
-
-
Education
-
2002 - 2007AGH University of Krakow
Master's degree, Mining and Geology (Mining Surveying) -
2002 - 2007Akademia Górniczo-Hutnicza im. Stanisława Staszica w Krakowie
Master of Engineering (MEng), Górnictwo i Geologia (Geodezja Górnicza) - Mining and Geology (Mining Surveying)
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Civil Engineering”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community