Bio
Experience
-
Winone Precision Technology India Private Limited
-
Uttar Pradesh, India
-
HOD-Utility & Maintenance
-
Jul 2019 - Present
-
Uttar Pradesh, India
A professional in Manufacturing industry, with several years of experience in product development and project management . I bring a wealth of experience and expertise in overseeing maintenance operations to ensure the optimal functionality of facilities and equipment. My proven track record in team leadership, strategic planning, and continuous improvement has contributed to the efficiency and reliability of organizations
-
-
-
WIND World India ltd
-
Indore Area, India
-
Senior Engineer
-
Apr 2017 - Jul 2019
-
Indore Area, India
• Site Incharge -Electrical with Wind World India Ltd. from April-2017handling 112 WEC total capacity 89.6MW Power Plant in Ratedi Dewas MP.•Handling all Site Activity and manpower.•Operation & Maintenance of 800KW Wind Turbine Generator(WTG).• Operating and Monitoring of WTG system through PLC & Scada system.• Analyzing faults encountered by the WTG system and hence troubleshooting the systemaccordingly.• Critical electrical fault tracing by panel diagram analysis.• Installation and Testing of electrical equipment.• Fault tracing in electrical equipment and system.• Adept in carrying out preventive and breakdown maintenance.• Carrying out operational activities in 690V/33kV HT Yard.• Preparing daily generation report and submitting them to higher management.• Analyzing plant data,carrying out calculations for finding Machine Availability,MTTF, MTTRetc,and hence preparing report based on the data and calculations.• Knowledge about International Electrical Standards-ISO,CE,IEEE
-
-
-
Inox Wind Ltd.
-
Indore Area, India
-
Engineer
-
May 2015 - Apr 2017
-
Indore Area, India
Overall responsible for all Electrical work within company premises which included 85nos WTG, 220KV & 33KV Sub-station etc. Planning & Implementation of preventive, breakdown &predictive Maintenance of Electrical Equipment of WTG, HT Yard, HT Line & LT Panel. Planning & Implementation of preventive, breakdown & predictive Maintenance of 220KV& 33KV Sub-Station which included 3nosTransformers (up to 100MVA), HT & LT Panel, Battery Chargers & UPS. Troubleshoots of various Electrical equipment’s and Instruments of Wind turbine like Sensors (PT100, Pressure switches, etc.), Contactors, Circuit Breakers, etc. Erection, Commissioning & Testing of WTG’s &its Components. Liaising with Madhya Pradesh State Electricity board (MPSEB) to attend red hot spot, during Power failure & shutdown etc. Implementation& Maintain of 5’S culture within the WTG. Restore the Power during Blackout, updating break down data’s Break down analysis, making daily energy consumption report. Identifying & maintaining critical spare & updating records as per the audit requirements.
-
-
-
Vision Automation Solution Pvt. Ltd
-
Jaipur Area, India
-
Automation Engineer
-
Jul 2014 - May 2015
-
Jaipur Area, India
Working on Variable frequency drive, using the programming of PLC and SCADA, circuit designing. Working on solar PV System Commissioning & Installation Software and Parameter installation and modification of Bachmann-GMBH make PLC module and lust Drive. Uploading software and programming for Electronic Cards and drives. Testing and Troubleshooting of Frequency converters (Drives), RTD and thermocouple sensors Responsible for shift operation of turbine, generator and utility from control room PLC &SCADA and field Maintenance Installing of ALSTOM Relay, Siemens & MTECH VFDs, DOL, STAR-DELTA and troubleshooting & rectification. Power Panel and Control Panel troubleshooting. Analysing the schematics of electrical circuits of related error and trouble shooting.
-
-
-
Sagar Electrical Industries
-
Kota Area, India
-
Electrical Engineer
-
Jul 2012 - Jun 2014
-
Kota Area, India
Planning & Implementation of preventive, breakdown & predictive of Electrical Equipment of AFBC (60 tons), CFB (60 tons) &Oil fire (2*30 tons) Boiler auxiliary, ESP, Coal plant, HT & LT Panel, 3 nos Transformer. Complete overhauling of HT & LT breakers (SF6, OCB and ACB), motor up to 422 HP & Testing of electrical equipment like BDV, High-pressure, current injection, Relay testing, contact resistance etc. Testing, Maintenance and complete overhauling of 22KV 500/5 CT & Outdoor SF6 breaker, OCB & Air CB. Timely execution of Preventive & Predictive Maintenance activities as per MAXIMO schedule and lead team in attending equipment breakdown. Man power planning, job allocation of 20 people and number of contractors Supervision of daily execution work
-
-
Education
-
2009 - 2012BK Birla Institute of Engg. & Tech Pilani
Bachelor's in Engineering, Electrical Engineering -
2006 - 2009Govt Polytechnic college Kota
Diploma, Electrical Engineering -
2005 - 2006Bharati Shiksha Niketan Kota
10+2, Science
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Plastics Manufacturing”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community