Bio
Credentials
-
FLACS CFD I Tranining
GexconApr, 2022- Apr, 2026 -
NEBOSH International General Certificate
NEBOSHAug, 2012- Apr, 2026
Experience
-
-
United Arab Emirates
-
Oil and Gas
-
200 - 300 Employee
-
Principal Risk, Reliability & Safety Consultant
-
Jan 2023 - Present
-
-
Senior Risk, Reliability & Safety Consultant
-
Jan 2017 - Dec 2022
-
Risktec Solutions
-
Abu Dhabi
-
Project Engineer - Risk & RAM
-
Jun 2015 - Dec 2016
-
Abu Dhabi
Risk & Safety Consultant working primarily for high hazard Industries specialising in Asset performance (System assurance activities e.g. RAM) and probabilistic safety assessments (Exceedance) for onshore and offshore O&G facilities including deterministic fire and explosion analysis using analytical and CFD tools, incident response and BLEVE analysis. Fire & Gas Mapping/Optimization. In addition, conducted an extensive atmospheric pollutant dispersion modelling for O&G facilities and others using US EPA approved models.
-
ARCADIS Vectra
-
Abu Dhabi
-
Risk & Safety Engineer
-
Oct 2013 - Jun 2015
-
Abu Dhabi
In Arcadis Vectra Sundar was working on several Onshore & Offshore O&G projects covering diverse range of safety/risk and asset management studies such as: Quantitative Risk Assessments (QRA) includes Physical effects numerical modelling for Fire & Explosion Study and Pipeline Risk Assessment coupled with probabilistic risk analysis and ALARP demonstration.. Fire & Gas Mapping/Optimization, Flare / Cold Vent study using CFD and Oil filled transformers explosions.Performed equipment layout optimization, assisted clients to facilitate the selection of safe location and design of occupied buildings in process plants with support of numerical studies.Performed asset performance management through RAM Study and assisted clients on equipment sparing configurations. Sundar has also conducted RAM study for electrical power distribution systems from simple to complex power distribution networks. Technical Scribe for various FMEA / FMECA studiesSIL verification studies to show that the Safety Instrumented System (SIS) meets the requirements of the particular SIL level and advice clients/Vendor on SIS architecture selection. CFD Studies (gas dispersion and explosion analysis) for offshore/onshore & FLNG facilities.
-
HCC
-
Kota Area, India
-
Technical HSE & Reliability - Senior Engineer
-
Feb 2011 - Oct 2012
-
Kota Area, India
Project : RAPP Unit 7 & 8Client : Nuclear Power Corporation India Ltd.Sundar was part of Electrical safety systems review & testing team at Rajasthan Atomic Power Project site unit 7 & 8 and Project Risk Management.
-
-
Education
-
2012 - 2013The University of Sheffield
Master's degree M.Sc(Eng), Process Safety and Loss Prevention Engineering -
2010 - 2011National Institute of Construction Management & Research (NICMAR)
Post Graduate Programme, Health Safety and Environment Management -
Anna University
Bachelor's degree, Electronics Engineeing
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Oil and Gas”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community