Bio
Credentials
-
•Chevron Construction Safety Training / Certificate Award
CHEVRON ESCRAVOS -
•EGP3 CHEVRON CERTIFICATE OF JOB COMPLETION
EGP3 CHEVRON ESCRAVOS -
•PATHMAKER-ZENATOR SYSTEMS AND COMPLETIONS METHODOLOGY CERTIFICATE
EGP3 CHEVRON ESCRAVOS
Experience
-
-
Nigeria
-
Oil and Gas
-
200 - 300 Employee
-
PM /CM Tech
-
Sep 2021 - Present
Preventive & Corrective Maintenance on the following systems: Chilled Water Pump for HVACSub sea LDHI injection Pump A B, C (HV)Centrifugal Pump PackageWater Transfer PumpFlat Bed trolleyCargo Pump (Hydraulic Pump Unit) Oil Transfer PumpRiser Porch pulling rigAir Handling Unit
-
-
Preventive Maintenance on Fire water packages and Essential Generators at TOTAL EGINA FPSO
-
Jan 2021 - Present
Preventive Maintenance on Fire Water Pump Packages A, B, C, D and Essential Generators A, B,C at TOTAL EGINA FPSO
-
-
Operations and Maintenace/ Commissioning (Electrical)
-
Jan 2018 - Present
Operations and Maintenance Engineer on Total Egina
-
Chevron
-
Nigeria
-
CRANE MAINTENANCE SPECIALIST
-
Mar 2020 - Present
-
Nigeria
-
Sporty Enterprises
-
Port Harcourt
-
MD
-
Mar 2011 - Present
-
Port Harcourt
I direct, Cordinate, Train, Repair and Install.
-
Construction Services International
-
Lagos, Nigeria
-
Commisioning
-
Apr 2016 - Jul 2016
-
Lagos, Nigeria
Performed Inspection and completion activities on Total Ofon D3 and D5 projects. E &I department.
-
Seplat Petroleum Development Company Plc
-
Oben Flow Station and Gas plant, Edo State
-
Electrical & Instrumentation Engineer
-
Jan 2015 - Feb 2015
-
Oben Flow Station and Gas plant, Edo State
Stock taking and upgrade recommendation of all Valves on Oben Gas Plant and Flow Station
-
Construction Service International
-
Niger Dock Yard, Snake Island, Lagos
-
E & I Inspector
-
Mar 2014 - Mar 2014
-
Niger Dock Yard, Snake Island, Lagos
I worked as an E & I Inspector on Total E & P Ofon project, for Bridges 1 & 2, at Niger Dock Yard, Snake Island Lagos.My duties are to conduct visual inspections, Insulation Resistance tests and cables and panels, impedance test, and completions inspections.
-
-
Elect/Instrument Inspector
-
Jan 2011 - Sep 2011
Perform RESPONSIBILITY: 1. Conduct Visual Check on installed systems.2. Conduct Insulation Resistance Test on electrical, instrument, fibre optic and coaxial cables.3. Conduct hipo test on high voltage cables4. Liaise with Aveon and Chevron QC to clear check sheets.5. Clear Punches6. Ensure sys...
-
Hyundai Heavy Industries Co., Ltd
-
Escravos EGP3
-
E & I Suprintendant
-
Jul 2009 - Dec 2010
-
Escravos EGP3
set and handled job targets, supervised and organised jobs.
-
-
Elect/Instrument Engineer
-
May 2007 - Nov 2010
Electrical Technician. Lay and fabricate trays. Lay Cables, Install panels. Conduct Continuity test, hipo test, insulation resistance/megger test, earth test, Inspection, Prepare job cards, liaise with Chevron QA/QC to perform walkdown, inspection, liase with dcc to prepare drawings for daily tar...
-
YOMATECH NIG LTD
-
Escravos EGP3
-
E & I Tech
-
Apr 2008 - Jul 2009
-
Escravos EGP3
E & I Technician
-
-
Education
-
1996 - 2000Rivers State University of Science and Technology
-
2000 - 2002NIIT Port Harcourt
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Oil and Gas”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community