Bio
Credentials
-
Primavera P6
CMCS - Collaboration Management & Control SolutionsMay, 2008- Apr, 2026 -
Civil Engineer Grade “A” by Qatar Engineering Accrediting Committee
Ministry of Municipality Affairs and Urban Planning
Experience
-
Technital S.p.A.
-
Doha, Qatar
-
Project Manager / Project Engineer
-
Jun 2002 - Present
-
Doha, Qatar
- Managing the projects / assistance to the Project Director.- Liaison with Client, Project Stakeholders and Sub-Contractors.- Coordination & Supervision of various Design Discipline teams- Preparation / assessment of claims (Financial and EoT).- Design, preparation & review of project documentation, In charge of submissions.- Quality system; project planning and preparation / review of the progress reports.Some of the design projects: - ECS for Konza Techno City, Kenya (development of new city: 40km of roads, infrastructure, security areas). Client: DELMA UK, ICM - Pre-Contract Professional Design & QS Consult. Services for Design of Zone 40 (24km roads & infrastructure)-Client: PWA, Qatar - Concept Designs of Roads/Infrastructure-Phase 2; 8 Nos. Packages of total area of approx. 30 mln.sq.m. and 396 km of roads, Client: UPDA-MMUP, Qatar - Design & Construct New Orbital Highway & Truck Route (P023). “Orbital Highway: Salwa Road to North Relief Road”–Tender Concept Design, Client: OHL for PWA, Qatar - Design of Roads in Doha Industrial Area (approx. 200km roads), Client: PWA - ECS for Roads, Utility Crossing & Street lighting in Mesaieed Industrial Area, Client: Qatar Petroleum - ECS for Reconstruction of roads and landscaping in Dukhan Fields – Client: QP - Design of Al Udeid Base Infrastructure, Client Rizzani De Eccher - Development of Stage 2 - Al-Wakrah Jetty Client: PEO, QatarSome of the supervision projects: - Post Contract Consultancy / Project Management (Client: PEO, Qatar) for: Design & Build of Seven Islands; Design & Build of Four Beaches; Construction of Coast Guard Base, Marina - Post Contract Professional General Site Supervision and QS Consultancy Services for Industrial 4 level Interchange Package 3, Client: PWA - Technical Supervision of LRNIP AF Year 2 roads rehab. works (10 contracts of total 60km of roads), Client: World Bank/MoTCIT, Armenia
-
-
-
DorProject
-
Armenia
-
Principal (Civil Engineer)
-
Jun 1999 - Jun 2002
-
Armenia
Civil (Roads) Engineer up to year 2000. - Design of Roads.Principal Engineer 2000-2002 - Design, study of options, value engineering; quantities - Coordination / Supervision of Design / Cad teams; In charge of submissions.List of the design projects: - R-48 Megri-Nrnashen (Nyuvadi)-Azerbajan border, km 4+000 to 20+000 - M-12 Goris-Kashatax-Stepanakert, km 21+520-22+076 - M2 Yerevan-Goris-Iran brd, Tigranashen-Zangakatun” km 77+050–83+912 - M-2 Margara-Vanadzor-Tashir-Georgia brd. km 180+360–183+381 - Road Sevan-Dilijan -“South approach to tunnel” km 73+200-80+922; “North approach” km 84+229-96+183 - “North-South” Karmir-Shuka-Hadrut, km 0 to 20+000 & 20+000 to 31+123 - “North_South” Kichan-Drmbon, km 0+000 to 21+873 - “Approach to Pushkinskiy mountain pass” Km 0 to 13+600
-
-
Education
-
1999 - 2002Yerevan State University of Architecture and Construction
PhD, Civil Engineering -
1995 - 1999Yerevan Institute of Architecture & Construction
Master's degree (5 years course), Civil Engineering
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Civil Engineering”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community