Bio
Experience
-
Eagle Ottawa (Thailand)
-
Rayong, Thailand
-
Program Manager
-
May 2018 - Present
-
Rayong, Thailand
• Take a lead of new project management for customer: Honda, Toyota, Vinfast, GM, MG, Nissan and BMW program.• New program management role: Project Kick Off and coordinate with customer, Internal Kick Off with Global team as Product Development, Engineering, and Laboratory before transfer to Plant team.• Create the project Master Schedule to be control and follow up: Investment, Machine, Tooling materials to be match as customer Milestone and events.• Lead for APQP and follow to Launch, Engineering, Materials and Quality team.• Review on customer drawing and create Bill of Material (BOM) and update in case of any changes. • Production Process Feasibility review including to machine capability review.• Manufacturing Lessons Learned established and carries over to protection for new program.• Follow as Customer requirements. • Engineering changes management and readiness.• Cooperative with Global team, Product Development team and another plant.• CA/VA/VE project readiness.• Problem solving and customer relationship. • Support all activity under management’s instruction
-
-
-
BekoThai
-
Rayong, Thailand
-
Senior Evaluation Quality Assurance Engineer
-
Aug 2015 - May 2018
-
Rayong, Thailand
- New refrigerator plant startup as pioneer team (Quality Assurance Function and relate concern)- New products trial, products development, evaluation and improvement since project start up to serial production.- ISO9001: 2008 implementation and driving to new 2015 version.- Products evaluation by the field test data and reliability test data to driving and apply on products.- Customer service function and driving to products and process improvement.
-
-
-
Faurecia Emissions Control Technologies (Thailand) Co., Ltd.
-
Eastern Seaboard, Pluagdang, Rayong, Thailand.
-
Plant Program Team Leader (PPTL),
-
Apr 2014 - Jul 2015
-
Eastern Seaboard, Pluagdang, Rayong, Thailand.
- Leader to new program readiness & launching.- Verify & validate for PFMEA with team and follow up to Control Plan concept with Quality team.- Tooling validation; Jig-Fixture, Inspection Gauges, small tool etc.- Plant Launch team set-up; staffed and kicked-off.- Plant industrialization timing plan, PV test which follow to Customer trial timing phase.- Run@Rate schedules for PT, MPT, and EMPT.- Conduct and follow up to Daily Launch meeting.- Program Launch Report initiated and updates implementation plan status in the plant.- Demonstrate that production lines are capable of meet Program targets for Capacity, Quality, Cost and Tool change over time.- Implement Standardized of Work for all production operations and tooling change over.- Continuous activity in ramp-up to align actual performances to targeted performances.- Manufacturing Lessons Learned established and uploaded to system.- Support all activity under management’s instruction.
-
-
-
Electrolux Thailand Co., Ltd.
-
Rayong Industrial Land (RIL), Nonglalok, Bankhai, Rayong, Thailand
-
Senior Evaluation Quality Assurance Engineer
-
Sep 2011 - Apr 2014
-
Rayong Industrial Land (RIL), Nonglalok, Bankhai, Rayong, Thailand
- New plant start up as pioneer of Quality Assurance team (Organization & Interview, Investment/Budget, Facility, Laboratory, Equipment, small tool).- Coordination with Product Development team (Design review, DFMEA, Prototype, 1st trial).- Process capability review and PFMEA review with Engineering and Production team.- Forming team to develop and submit ISO9001.- New Product, Product Development validation and approval.- Quality Plan set-up and follow up; DFMEA, PFMEA, IPCP, CTQ, QC-Sheet, Testing and evaluate.- Service Call Rate (SCR) Estimation and Evaluation.- Product Field Trials and Evaluation.- Product Reliability Test and Evaluation.- Quality Management System follow up.
-
-
-
Haier Electric (Thailand) Public Company Limited. (HTC)
-
Kabinburi Industrial Zone, Prachinburi.
-
Assistant Quality Assurance Manager
-
Jun 2003 - Apr 2011
-
Kabinburi Industrial Zone, Prachinburi.
- New model launching; Side By Side, French Door, Multi Door, Chest Freezer, Top Freezer and Single Door - Section management; Team build up, Budget & Investment set up and controlling etc.- Cost reduction; Re-balance/reduce refrigerant, Replace Cooper tube by Steel tube, Internal calibration for all dimensional device, Replace Evaporator plate by cooling pipe, Replace Plastic components by EPS-Foam etc. - Product development/Improvement; Common capillary tube to only one type, common thermostat, common lamp/socket etc.- Production Line improvement; Combine Electrical safety test to one Multi-function machine, Use data logger for cooling testing and reduce testing period, use vacuum gauge/meter to on vacuum process and detection before charging etc.- Customer service and problem solving; Noisy, Low cooling, Crack/Leak, PCB malfunction, Lamp and Fan Motor problem, Handle issues etc.- Calibration Center.
-
-
Education
-
1998 - 2002มหาวิทยาลัยเทคโนโลยีสุรนารี
Bachelor Degree of Engineering, Mechanical Engineering - ME
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Motor Vehicle Manufacturing”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community