Bio
Experience
-
-
Spain
-
Design Services
-
700 & Above Employee
-
Senior Manager
-
Aug 2023 - Present
-
-
Senior Engineer
-
Aug 2023 - Present
-
-
Senior Engineer
-
Aug 2023 - May 2024
-
HANSOL.K.M.T
-
Busan, South Korea
-
Deputy Head Of Department
-
Nov 2013 - Feb 2017
-
Busan, South Korea
Employed by HANSOL.K.M.T, a subsidiary of DSME([DAEWOO SHIPBUILDING & MARINE ENGINEERING CO., LTD.,) as Outfitting design Engineer and is responsiblefor outfitting arrangement of engine room, casing & funnel, spool piece drawing and support fabrication drawing, outfitting prefabricated drawing and also supporting construction team for the projects below: 1. Yamal LNG-.Clarifications of Technical Issues-.Coordination between Design Team & Site Team-.Arrangement of Engine room, Azipod room, streering room, Caing & Funnel area.-.Arrangement of Vent duct system. -.Arrangement of Exh.gas system.-.Arrangement of Traffic system.-.Arrangement of Lifting Beam & Lug-.Arrangement of Machinery foundation2.170K LNG, 18000 TEU CON, LPG Carrier, Battle ship project in DSME.-. Clarifications of Technical Issues-. Coordination between Design Team & Site Team-. Arrangement of EngineRoom & Casing/Funnel-. Arrangement of Vent duct system. -. Arrangement of Exh.gas system.-. Arrangement of Traffic system.-. Arrangement of Lifting Beam & Lug-. Arrangement of Machinery foundation
-
STX ForceTec
-
Chang-won, South Korea
-
director(Project Manager)
-
Feb 2009 - Oct 2013
-
Chang-won, South Korea
Feb 2009 to Oct 2013 Employed by ForceTec, a subsidiary of STX as Outfitting design Engineer and is responsiblefor outfitting arrangement of engine room, casing & funnel, spool piece drawing and support fabrication drawing, outfitting prefabricated drawing and also supporting construction team for the projects below: 1.L506 ICEBREAKING SUPPLY VESSLE(STX FINLAND & ARCTECH / Dispatched to Helsinki shipyard-5month) -.Clarifications of Technical Issues-.Coordination between Design Team & Site Team-.Arrangement of Silo room, Propulsion room, Converter room, Cargo holding area.-.Arrangement of Vent duct system. -.Arrangement of Exh.gas system.-.Arrangement of Traffic system.-.Arrangement of Lifting Beam & Lug-.Arrangement of Machinery foundation2.50K PC,74K PC, 58K BC, 76K BC, 81K BC, 83K BC, 181K BC, 170K LNG, 16,000 TEU CON,9K LEG, 9KLPG, 22K LPG Project in STX. -.Clarifications of Technical Issues-.Coordination between Design Team & Site Team-.Arrangementof Engine Room & Casing/Funnel, Steering gear Room.-.Arrangement of Vent duct system. -.Arrangement of Exh.gas system.-.Arrangement of Traffic system.-.Arrangement of Lifting Beam & Lug-.Arrangement of Machinery foundation-.Arrangement of Workshop
-
S.E.K Co., Ltd.
-
Busan, South Korea
-
Deputy Manager
-
Sep 2007 - Feb 2009
-
Busan, South Korea
Sep 2007 to Feb 2009 Employed by S.E.K Co., Ltd., as Outfitting design Engineer and was responsible for detaildrawing of Outfitting and basic drawing for the below projects and items: 1. AHTS -. Clarifications of Technical Issues-. Coordination between Design Team & Site Team-. Arrangement of EngineRoom & Casing/Funnel-. Arrangement of Vent duct system. -. Arrangement of Exh.gas system.-. Arrangement of Traffic system.-. Arrangement of Lifting Beam & Lug-. Arrangement of Machinery foundation 2. 50K PC, 74K PC,58K BC.-. Clarifications ofTechnical Issues-. Coordinationbetween Design Team & Site Team-. Arrangement of EngineRoom & Casing/Funnel-. Arrangement ofVent duct system. -. Arrangement ofExh.gas system.-. Arrangement ofTraffic system.-. Arrangement ofLifting Beam & Lug-. Arrangement ofMachinery foundation
-
Mipo ENG Co., Ltd.
-
Ulsan, South Korea
-
Deputy
-
Aug 2006 - Sep 2007
-
Ulsan, South Korea
Aug 2006 to Sep 2007 Employed by Mipo ENG Co., Ltd., a subsidiary of HMD(Hyund Mipo Dockyard) as Outfitting & Pipe and responsiblefor arrangement of engine room, casing & funnel, spool piece drawing and support fabrication drawing, outfitting prefabricated drawing and also supporting construction team for the projects below: 1.50K PC, 74K PC, 58K BC. 8,000TEU CONTAINER-.Clarifications of Technical Issues-.Coordination between Design Team & Site Team-.Arrangement of Engine Room & Casing/Funnel-. Arrangement of Vent duct system. -. Arrangement of Exh.gas system.-. Arrangement of Traffic system.-. Arrangement of Lifting Beam & Lug-. Arrangement of Machinery foundation
-
Hea-Sung Eng Co., Ltd.
-
Ulsan, South Korea
-
Deputy
-
Mar 2002 - Aug 2006
-
Ulsan, South Korea
Mar 2002 to Aug 2006 Employed by Hea-Sung Eng Co., Ltd., a subsidiary of HHI(Hyundai Heavy Industries) as Outfitting & Pipe and was responsible for production designing of piping and supports for engine rooms of Bulk Carriers & Petrochemical Carriers. -.Clarifications of Technical Issues-.Coordination between Design Team & Site Team-.Arrangement of Engine Room & Casing/Funnel-. Arrangement of Vent duct system. -. Arrangement of Exh.gas system.-. Arrangement of Traffic system.-. Arrangement of Lifting Beam & Lug-. Arrangement of Machinery foundation -. Piping Arrangement of F.O Filling& Transfer System.-. Piping Arrangement of F.O Purifying System.-. Piping Arrangement of F.O Service system for M/E & G/E. -. Piping Arrangement of F.O Service system for Boiler. -. Piping Arrangement of F.O Service system for Incinerator & etc.,-. Piping Arrangement of L.O System. -. Piping Arrangement of Bilge & Fire.G/S System.-. Piping Arrangement of Cooling S.W & Service system.-. Piping Arrangement of F.W Service system. -. Piping Arrangement of Cooling F.W system.-. Piping Arrangement of Air Service system. -. Piping Arrangement of Boiler feed water system.-. Piping Arrangement of Steam service & condensate system. -. Piping Arrangement of Air vent & sounding system. -. Piping Arrangement of Exh.gas system.-. Piping Arrangement of Fire extinguishing system.-. Piping Arrangement of Scupper system.
-
-
Education
-
1994 - 2000대구대학교
Bachelor's degree, Economics
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Design Services”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community