-Project Manager for Bab integrated facilities project (BAB) -Proposal Team leader for Bab integrated facilities project (BAB) ($1.5 billion), successfully won.-Project Manager for the flow suction tank (FST) Project, Habshan.
-
-
-
ADNOC Group (ADCO)
-
Abu Dhabi, United Arab Emirates
-
Chief Engineer
-
Oct 2006 - May 2016
-
Abu Dhabi, United Arab Emirates
-Develop Engineering Procedure for engineering works and draw way forward for various issues. -Assigned as a team leader and for Al MONDOS Project (Under Ground Storage and prepare related study including cost and duration estimate.-Conduct Value Engineering for Major projects-Provide technical guide for the engineering team-Control and orient the discipline interface effectively to meet the project objectives as per schedule to the required quality level -Manage and support the team in Preparation in house FEED including specifications, BOQ(s) for various projects-Guide the team in technical Bid Evaluation and clarifications -Participate In workshops and reviews of Construability, HZID, HAZOP, LL(s), etc.-Provide appreciated extensive technical Support for all assets -Provide prompt cost time effective solutions for various technical issues-Provide prompt cost time effective solutions to construction issues-Effective support to SCMD in Contractors prequalification, and auditing -Lead technical meetings with consultants and EPC contractor and draw way for ward -Charing and carry out interview for new recruitments and Engineers career ladders-In addition to the technical duties, assigned as Projects Manager for (Hail Island refurbishment, Construction Offices BAB &GAS, Bu HASA Road)-Act as focal point coordinating with ADNOC for marine works and Hail Island Project. -Coordinate with other OPCOS for updating specification and sharing lesson learnt-Develop Bid Evaluation Criteria for ADCO
-
-
-
Penspen
-
Abu Dhabi, United Arab Emirates
-
Head of Civil Engin
-
Nov 1997 - Aug 2007
-
Abu Dhabi, United Arab Emirates
Project Manager for:• Detailed Engineering Services for Facilities Related to Safran Military-UAE • Consultancy Services for Refurbishment of NMDC Site Sas AL Nkhl _ UAE- TAKREER. • Completion of Construction of 1000 mm diameter Water Pipeline from Shuweihat to Silaa- ADWEA- UAE • EPIC- for Common Utilities & Facilities for liquid product Berth 1A & 1B-QP-QATAR • Consultancy services for Misc. Industrial projects for ADNOC- FOD -UAE • Replacement Fire Mains at Bab& Buhasa. - GASCO -UAE • Dubai International Airport fuel farm expansion. • Pipelines to Shwaikh and Doha power station. • Water Transmission and Distribution Projects for ADWEA/ ADDC/ TRANSCO.• Mussafah Pumping Station and Reservoirs for ADWEA. • One Fire Water Tank, Four Crude Oil Tanks and Related Structures for QGPC, at QATAR. Project.• Installation of Water Meters for Customers in Abu Dhabi. – Water & Electricity -UAE• Das Tower Long Term Repair Works for ADMA-OPCO at Das Island. • Jebal Dhana Shore Sump Pump (ADCO).• 20” GRE Drinking water pipeline From GUP. To Ruwais Housing Complex (TAKREER).• Seawater intake oil pollution protection system for power and desalination plants at Al Taweelah and Mirfa• Fire Fighting Facilities for COS Tanks , Das Island (ADMA-OPCO).• Resolution of Water Seepage Problem,Ruwais Control Rooms (TAKREER)• Das Island Fire Fighting (ADMA-OPCO)• Ruwais Common Fire Training Ground, (TAKREER)• Ghantoot Palace Landscaping (PWD).• Installation TRC MPP (BUNDUQ).• Asab& Shah EWDF (ADCO)• Jebal Dhana, 48” Loading Ring & Effluent Water Closed System (ADCO).
-
-
-
ADNOC Group
-
Abu Dhabi, United Arab Emirates
-
Construction Engineer
-
Jan 1993 - Sep 1997
-
Abu Dhabi, United Arab Emirates
• Seconded to ADCO for ADCO Compound Development Housing Project Phase (I&II), Abu Dhabi.Responsible for Civil/structural and all external works as detailed below: - Villas 57 number- Roads 16 number, length equals 1.8 km- Main sewer lines 1.2 km- Secondary lines for all villas- Side walls and pavements- Domestic and firefighting water supply- Irrigation, soft/hard land escaping- Compound boundary walls 4000 meter- External power, telephone, MATV works street lighting- Main water tanks 3 number 90,000 UK Gallon capacity of each- Tanks foundations and pumping room- Chiller compounds 2 number- Swimming pool and associated pumping room of ADMA GM Residence Responsibilities and Duties- Supervision, monitoring quality and progress of work- Review of shop drawings work method statement- Review material submittals and material inspection- Coordination with other disciplines- Coordination with ADCO "GSD" Engineering drawing office, engineering projects etc.- Coordination with concern authorities such as Town Drainage Dept.- Letters initiation- Answering Technical quires raised by the Contractor- Attending contractual and technical meetings- Resolution of site problems, clashing and all site conditions related to construction. Design and Alternative Proposals- Redesign of main sewerage lines- Redesign of surface water drainage system by proposing three option to ADCO Management and implement the selected option- Design of storm water lifting up station- Structural design of the compound telephone room- Redesign of ADCO compound roads by contributing three option to ADCO Management and Supervising the selected option- Design of main sliding steel gate and relevant services such as automatic system, traffic structural design of guard house and relevant services
-
-
-
AL MUHAIRBY PAN ARABIAN PIPELINES CONSTRUCTION
-
Abu Dhabi, United Arab Emirates
-
Project Manager
-
Jan 1989 - Sep 1993
-
Abu Dhabi, United Arab Emirates
Project Manager for:-Bab Oil Development Project, HABSHAN (ADCO)-UPGRADING FIRE FIGHTING FOR ADCO ASAB WITH AMPA COMPANY-ROADS PROJECT IN JORDAN WITH SWITI CO.
-
-
Education
-
1981 - 1985Mehran University of Engineering and Technology
Bachelor's degree, Civil Engineering
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Oil and Gas”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community