See How Many Clients You're Missing Each Month

Simply enter your business email & Topline AI Agent will show you.

Bio

Generated by
Topline AI
Saib Alhamdy is a seasoned civil engineer with extensive experience in construction management, project planning, and quality assurance. He has worked on various projects, including infrastructure development, oil and gas facilities, and refugee camps. Alhamdy holds a Bachelor of Applied Science in Civil Engineering from Basra University.

Experience

    • Iraq
    • Oil and Gas
    • 700 & Above Employee
    • Senior Cheif Engineer
      • Aug 2018 - Present

    • Senior Project Manager
      • Jul 2018 - Present

      *Supervise all activities of the construction of roads, Oil wells civil work, connecting thewells to the pipes, supports for pipe lines.* Built a 380-person camp to include all security measures, water, electric and sewagenetwork include laundry, restaurant, GYM haul and Clinic.* 4000 Sq meter of landscape with grass and hundreds of date palms and trees with allirrigation network.*Projects analysis and bidding process for new projects.* Renovate Oil and water tanks and flairs.

  • Basra-Mas
    • Iraq-Basra- Um qaser Port
    • Senior Quality Assurance Manager
      • Dec 2014 - Apr 2019
      • Iraq-Basra- Um qaser Port

      Construction of New three berths of 600 meters at Um-Qaser (#27, 26 and 25)Berth 11, Berth 20 and Berth 19 rehabilitation and remodelingWork to build three berths work include Sheet pile work, Tubular piles and concrete deckingwith all berthing accessories. Build a container yard on 35 Hectare plus roads, Electrical power,supply and transforming and all infrastructure, RO system and office buildings. My main role isto manage time schedule, manage all material used on the project, prepare all QA/QCdocumentations, manage testing of material, welding and all other aspects related to QC duties.

  • FIAFI Group
    • Basra-Iraq/ W.Qurna Oil Field
    • Head of Eng. Department
      • Jan 2013 - Sep 2014
      • Basra-Iraq/ W.Qurna Oil Field

      *Manage the engineering department; direct execute a project to build a Yom Uong /SAMSUNG site camp in Waste Qurna 2 Oil field managed buy LUK Oil Company.* Working with Iraqi Southern Oil Company to facilitate the design, material entry andquality of work according to the international standards.* Built a good engineering network with the Iraqi Engineers in Basrah City andBaghdad/Iraq as well as the ISOC.

    • Project Planning Manager, Project Manager
      • Jan 2008 - Oct 2008

      Assignment 1Oct. 2008 – Oct. 2011Facilities Planner/ Engineer- Bahrain: Reassigned to the Navy Support Activities, NSA, inBahrain to support the facility management and renew infrastructure and lay down of the Navybases in the Mideast. Duties include the evaluation of structure performance, design andproject management, cost estimate, funding process and contract awarding process foroffshore and onshore facilities. Projects to include the development of waterfront’s 70 acresland, structural analysis of pier and underwater investigations for barges and pilings,Administration buildings, Warehouses. Design compact sewage treatment plant, upgrade andmaintenance prevention for the RO plant and all infrastructure networks. Work includes ACAD,MAXIMO and electronic project management software. Project management to install multisatellite dishes for VIASAT and data banks.Assignment 2Jan. 2008 - October 2008 KUWAIT Oil MINISTRYSenior Civil Engineer: Responsible for Civil Engineering design for the Energy and NaturalResource Services (ENRS) Agency, including civil utility layouts for camp projects withpopulations up to 50,000 for Kuwait Oil Refinery Project entitled, National Refinery Project,(NRP). Design WWT plant, RO plant and distribution system foe sweet water, gray water andsewage.

    • Senior Consultant/ Project Manager
      • Jul 2006 - Sep 2007
      • Baghdad

      Jul. 2006—Sept. 2007Provincial Reconstruction Team, PRT (Italian led)/USAIDSenior Municipal Engineer/ Urban Development: Responsibilities include the identification ofinfrastructure needs of the Governorate of Dhi Qar/Iraq. I participated in the city mappingproject. I also extended Project to all other cities in Iraq. Developed and improved the servicedelivery and capacity enhancement of the Local Government of Dhi Qar/Iraq. Trained andsupervised local engineers to generate the GPS system in IRAQ.

  • SAIC
    • Iraq-Baghdad
    • Senior Project Manager
      • Jul 2004 - Jul 2006
      • Iraq-Baghdad

      Security and Justice Department-Military/IraqSenior Project Manager: Managed all military engineering/construction projects in NorthernIraq, primarily at military bases and other buildings that belong to the Iraqi Ministry ofDefence. I worked with such Consultants/Contractors as Tetratech, Toltest, Shaw, Parsons,AMEC and ECCI. I’ve managed the MNSTC-I/J-7 military and police engineering/constructionprojects, including the Baghdad Police College Total project cost exceed $1.2 B. I’ve workedwith AFCEE, USACE, the Iraqi Government (Ministerial, Governor and Mayors level, GeneralDirectors of State construction companies) for managing projects that related to military andpolice Bases. I’ve evaluated needs for housing, infrastructure, schools and other supportingfacilities and equipments for the projects, funding proposals and work’s execution. Projectscosts exceeded $1 billion. Number of workers exceeded 10,000.

    • Senior Consultant/ Advisor
      • Oct 2003 - Jul 2004
      • BAGHDAD

      Oct. 2003 - Jul 2004Assignment (A): Ministry of Housing (MoHC)/ IraqSenior Project Manager (Advisor)/Roads and Bridges: I’ve managed assessments of roadsand bridges, bidding processes, contracting, supervision and design. I’ve coordinated withvarious military divisions of United State Army Corp of Engineers (USACE), Iraqi MoHC andCPA. Coordinated with the Iraqi MoHC Minister and his deputies, the Ministry of Planning andhigh ranking directors and local government officials (Mayors, Municipality directors and theirengineers and committees) in Diyala, Baghdad, Basrah, Hilla and Kut, for the village roads underthe CPA project for bridge repairs and $100 M housing compounds in Baghdad, Hilla, Kerbala,Najaf and Basrah.Assignment (B): Ministry of Oil/ IraqAdvisor/ Engineer: Advising the CPA/Ministry of Oil. Identified fuel distribution problems inthe local market (Baghdad, Kut and Basrah). Analyzed and reported deficiencies in theproduction, import and distribution of fuel in the country. Worked with Iraqi Ministry of Oildirectors and local governments to address such issues as imports, theft, smuggling and risingprices in the market. Prepared plans and proposed solutions. Also worked with Southern OilCompany in Basra for assessing the water injection plants in the Ramallah Oil field. Andrebuilt the Subba Oil field bridge.

  • SAIC- CALIFORNIA
    • Baghdad- IRAQ
    • Engineering Consultant
      • Apr 2003 - Sep 2003
      • Baghdad- IRAQ

      Engineering Consultant / Ministry of Housing and Construction- Iraq: Restructured andReformed the Ministry of Housing and Construction in Baghdad/Iraq. Worked with various UScompanies to identify immediate needs (Equipments, Computers, furniture, buildings, staffingand training) and helped in establishing Iraqi entities such as Engineering Community Club, IraqContractors Forum and Club, Training Committees, Municipal Councils and the State of IraqConstruction Companies. Also performed personnel work, on behalf of the CPA, for theMinistry of Housing and Construction. Also served, as a Project Manager, at the construction ofKirkush military training base in Diyala.

    • Civil Engineer/Building Inspector
      • Jul 1993 - Dec 2002
      • SAINT LOUIS, MISSOURI, USA

       Designed and managed home remodeling. Designed, estimated, and supplied material and manpower to reconstruct and repair housing units.  Certified Home Inspector in the State of Missouri.  Duties to perform and provide engineering solution for new owners of houses and buildings. Structural evaluations and solutions.  Formed the Iraqi Community centre in Saint Louis, Missouri. Established the non-profit business to serve the Iraqi community of 3,000 Iraqis. This project was funded by the U.S. Federal and State of Missouri Governments.

  • Unites Nation UNHCR
    • Kingom of Saudi Arabia
    • Construction Manager
      • Jul 1991 - Jan 1993
      • Kingom of Saudi Arabia

      Construction Manager of the most modern refugee camp in the world. Designed, estimated and laid out the camp site. Surveyed roads and fences. Supervised soil/earthworks to construct 8 miles of roads. Worked as a coordinator between the United Nations High Commissioner for Refugees (UNHCR) personal, the Saudi government authorities and the Iraqi refugees

    • Senior Engineer
      • Jul 1985 - Jan 1991
      • Basra- Iraq

      performed the following tasks:  Site design, management, surveying and scheduling using the company's construction plants and equipment for concrete and soil work.  Construction management and supervision of the expansion of the computer building/ Makina and sport facilities. Provision of maintenance for company facilities.  Construction management and supervision of soil works (Civil Engineering Work) for CGS6, the largest oil production station in IRAQ.  Construction of many small facilities which were used as offices and checkpoints, etc.  Installation of a water purification system for the company housing compounds.  Soil work for the oil bases inside the Marshes to construct roads (West Qurna 1).  Design, management and supervision of the construction of Rehabilitation of Oil pump station #2 in Sammawa city and the chemical plant project for the injection of chemicals into the main Iraqi oil Pipeline. This project increased the flow of the strategic pipe line by 12%. Rehabilitation of the central oil-gas separation station in south Rumaila (Central, Southren, Qurainat, Shamia and Al Ratqa) and increase thehe central station capacity from 490 K B/day to 520 K B/day by demolishes and rebuild new bank. This was a challenging as it was a time sensitive project (the station was shut down for only 48 hours) for that huge work. Management and supervision of all the civil engineering work in Al Barjissia Oil Field. Management and supervision of all the civil engineering work in head quarter of the company in Basra city (Al Makina). Design, management and supervision of the reconstruction and rehabilitation of the five south Rumaila gas-separation stations while it under production conditions. Construction of 90 residential houses (subdivision) @south Rumaila for company staff.

  • Iraq Army
    • Salah Addien- Iraq
    • Engineer
      • Aug 1979 - May 1985
      • Salah Addien- Iraq

       Supervised the construction of 15 underground arsenal buildings.  Also managed and supervised the following: • Construction of 55 underground concrete, water reservoirs. • Construction of the Serena Alarm system in the military camp. • Construction of the Armored forces school. • Construction of the water treatment plant and distribution system. • Design of (multiple use purpose) buildings, roads, culverts, Fire range, Irrigation channels, Clinics, Fire Station and Bridges.• Structural analysis and foundation design of 18-story building using the large diameter pile design theory.

Education

  • 1975 - 1979
    Engineering College- Basra University
    Bachelor of Applied Science - BASc, Civil Engineering

Suggested Services

This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection

Industry Focus. “Oil and Gas”

Looking to Create a Custom Project?

Need a custom project? We'll create a solution designed specifically for your project.

Get Started

References

Social Profiles

Community

You need to have a working account to view this content. Click here to join now

Similar Profiles