Bio
Experience
-
-
Swpf Project - Qa Programs
-
-
-
SWPF Project - QA Programs
-
Mar 2009 - Present
- Leading the DCS I&C program including overall process development and qualification for SIL 2/3 applications compliant with ISA 84.1/IEC 61511, DOE G 414.1-4 and NQA-1, SB 2.7.- Managing the supplier qualification and surveillance program including planning and corrective action oversight.-...
-
-
-
-
President
-
Feb 2002 - Present
Providing Expertise in the following:* Project/Program: MS Project, Primavera, VISIO* Analysis: Relex, FMEA Pro, Aspen* Requirements/Change: Requisite Pro, ClearCase, ClearQuest, DOORS* Mechanical Drafting: Cadkey, AutoCad* Electrical Drafting: ORCAD, P-Spice* Software/PLC Coding: LabView, RSLogix, iFIX, VB, Delta V, .NET
-
-
Owner
-
Jan 2000 - Present
I&C Hardware/Software definition to NQA-1, 2008, ISA 84.1/IEC61511 and IEC 61508.Commercial Grade Dedication (CGD) including Technical EvaluationsVendor Oversight and Project ManagementVerification and Validation (V&V) for SIL 1 - 3 applications including:Requirements ManagementTraceability, Integration and Risk analysisTest Planning and Execution
-
-
Consulting Qualification Engineer
-
Feb 2003 - Mar 2004
Lead the qualification effort to define and obtain CE for 'Heavy Industrial' applications through TUV.Established all aspects of EMC/RFI, power distribution, and wiring practice to achieve Compliance within an ISO 9001 environment.Developed overall planning and implementation of a formal product life-cycle to carry out delivery of component, sub-system and system integration integrated for power plant solutions.Developed electrical controls and interface for multi-kW power sources along with coordinating root-cause analysis with primary supplier.Lead the vendor quality surveillance program to address power supply issues including root cause analysis, manufacturing process development and trending.
-
-
QA Manager
-
2009 - 2009
-
-
NQA-1 V&V Program Coordinator
-
Mar 2004 - Dec 2008
10CFR50, App. B and NQA-1, Part I/II/III program compliance through Rev. 2008 Requirements management, Design Control and Procurement process optimizationAdvanced SSC Safety Integrity Level (SIL) analysis to ISA 84/IEC 61511
-
-
NI QA Engineering Manager
-
Mar 2004 - Dec 2008
Managed the China AP1000 design and procurement review process for code and QA compliance related to on-shore requirements of 1E and non-1E items and services. Responsible for overall project compliance to 10CFR50 App B, NQA-1, ISO 9001:2000, IAEA 50-C and HAF 003 requirements. Operated as Lead A...
-
-
Safety Systems Program Coordinator - Nuclear QA
-
Mar 2004 - Feb 2008
Lead the vendor qualification process for safety systems to meet IEC 61508, IEEE 7-4.3.2 and 10CFR50 App B criteria including all aspects of vendor auditing and process review for hardware, software and compliance.Developed and implemented the V&V program for Safety PLCs I&C based on the ...
-
-
Senior QA Engineer
-
Sep 2002 - Feb 2003
Provided project and QA expertise to the nuclear automation organization for both domestic and Korean power plants. Managed and authored the Commercial Grade Dedication Plan for the Common Q platform.Provided technical input on issues related to platform qualification, SPHA, software V&V, re...
-
-
Lead QA Engineer
-
Feb 2002 - Sep 2002
-
-
Lead engineering staff
-
Jan 2000 - Feb 2002
in process development and validation of ESF system per 10 CFR 50 Appendix B Requirements.Managed Project and WBS from Baseline to Project Completion (P3e) for all life-cycle documentation and traceability and testing. Designed and implemented a range of new test and system evaluation processes a...
-
-
Senior Electrical Systems Engineer
-
Aug 1998 - Jan 2000
Managed project schedule (MS Project) for multiple outside contract organizations from initial negotiation to final qualification.Managed the Fuel Processing Facility including design, development and maintenance with a capital equipment responsibility of approx. $12,000,000.Lead engineer for des...
-
-
Senior QA Engineer
-
Feb 1996 - Aug 1998
Developed all process and testing procedures for reliability and performance assessment.Established imaging system guidelines for proper qualification criteria and statistical analysis. Created statistical process control guidelines to determine system behavior and QA. Provided product developmen...
-
-
Laboratory Manager
-
Jan 1995 - Jan 1996
Developed diagnostic sources for material processing, ozone detection, and fundamental research.Designed and developed electro-optical systems for NSF research and atmospheric detection methods. Acquired and budgeted primary equipment requirements and established facility infrastructure. Establis...
-
-
Weapons Physics
-
Mar 1993 - May 1994
-
-
Project Engineer
-
May 1989 - Mar 1993
Designed and integrated high-energy systems for nuclear research in weapons physics.Implemented system design modifications and analysis for material interaction studies.Developed imaging and alignment techniques along with beam characterization testing.Development of COIL systems for high power ...
-
-
Scientific Systems/International Application Support
-
Jun 1983 - May 1989
-
-
Education
-
Thomas Edison State University
-
Univ. of Nevada
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Computer Hardware”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community