Bio
Experience
-
-
Real Estate Team
-
Nov 2023 - Present
-
-
-
Maverick Real Estate Partners LLC
-
New York, New York, United States
-
Investments Team
-
Jul 2022 - Aug 2023
-
New York, New York, United States
- Underwriting and sourcing deals involving non-performing loan (NPL) acquisitions and loan originations secured by real estate across all asset classes in the NYC market (typical deal size up to $50MM).- Creating DCF collateral valuations in Excel, utilizing Argus for office property analysis and valuation, performing sales and lease comparable analyses, reviewing loan due-diligence files, and using scenario probability-weighted models to project deal returns.- Compiling public and private data to create data sets targeting different loan distress and loan-in-need indicators to identify and source deal opportunities.- Establishing and maintaining relationships with banks, private lenders, and mortgage brokers.- Working with the Asset Management team on strategy updates for existing deals.
-
-
-
-
United States
-
Construction
-
700 & Above Employee
-
Project Engineer - Planning and Scheduling Group
-
Apr 2020 - May 2021
Rotational Scheduler with the Planning and Scheduling group, leveraging construction knowledge and Primavera P6 software to: -Develop baseline schedules for upcoming projects and then cost load these schedules (based on requirements). -Perform project monthly schedule updates and reviews, and intricately report findings of schedule reviews to Division Presidents. -Perform Time-Impact Analyses on different projects due to delays, added scope, or unforeseen conditions experienced. -Main projects: Cannon House Phases 2 & 3 (House of Representatives Offices) and Medstar Georgetown University Hospital.
-
-
Project Engineer - Washington Adventist Medical Pavillion
-
Mar 2020 - Apr 2020
Assisted with the project close-out process by obtaining building warranties, O&M manuals, LEED credit documentation, and as-built drawings to be packaged and presented to the client.
-
-
Project Engineer - Suburban Hospital
-
Aug 2019 - Mar 2020
Project scope was to renovate existing hospital and build a new 5-story structure adjacent to existing hospital. • Resolved on-site construction issues, coordinated daily work with subcontractors and hospital’s management team, communicated project schedule to subcontractors, tracked subcontractors’ materials, and issued change order reports. • Managed punchlist on two levels of the new hospital using the Latista software, and assisted with project close out.
-
-
Engineer - Estimating Department
-
Aug 2017 - Aug 2019
Drafted scope sheets for different trades, evaluated subcontractors’ bids, coordinated with team members to ensure no scope gaps, assisted with procurement and negotiation, and networked with vendors. -Assisted in successful bids: Walter Reed Military Hospital ($600M), Airforce Hangar ($300M), and Hyatt Hotel Nashville ($150M) -Used different softwares: BuildingConnected to record vendors’ proposals and data analytics of their bids; OnScreen Takeoff to perform quantity counts; and KPI (in-house program) used to track performance metrics of subcontractors.
-
Madison Marquette
-
Washington D.C. Metro Area
-
Analyst
-
Jun 2016 - Jul 2016
-
Washington D.C. Metro Area
-
Martin Brothers Marcowall Inc
-
Greater Los Angeles Area
-
Summer Intern
-
May 2015 - Jun 2015
-
Greater Los Angeles Area
Learned and performed tasks in various departments such as Business Information Modeling, Structural Engineering, Cost Estimation, and Accounting. Made site visits to projects under construction.
-
-
Education
-
2021 - 2022Columbia University in the City of New York
Master's degree, Real Estate Development -
2013 - 2017The George Washington University
Bachelor of Applied Science (BASc), Civil Engineering
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Civil Engineering”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community