Bio
Experience
-
ToroCan Construction Inc.
-
Toronto, Ontario, Canada
-
Construction Project Coordinator
-
Feb 2022 - May 2022
-
Toronto, Ontario, Canada
• Liaised with clients to identify and define requirements, scope and objectives • Brok projects into doable actions • Analyzed risks and opportunities • Set projects’ Gantt chart• Created and maintained comprehensive project documentation, plans and reports • Monitored project progress and made sure that clients’ needs were met
-
-
-
Keyfiat Pajoh Spadana
-
Isfahan Iran
-
Quality Assurance Engineer
-
2006 - 2018
-
Isfahan Iran
•Implemented QMS, and ISO 9001 in more than 10 companies in various industries •Designed production planning (MPS), material requirement planning (MRP), quality control (QC), inventory and warehouse management processes following the TQM concept, reduced warehouse deficit•Audited QMS by a Certification Body, received certification
-
-
-
GLG - Golnoor Lighting Group گروه روشنایی گلنور
-
Esfahan, Iran
-
Plant Manager
-
Mar 2014 - Mar 2016
-
Esfahan, Iran
• Re-engineered production planning system to deliver customers' orders on time, achieved 98% of goals • Increased production productivity to 120% by reviewing production steps using time study techniques and measurement and balancing assembling lines• Re-engineered machinery preventive maintenance system to reach 100% availability of machinery based on the production schedule • Re-engineered inventory and warehouse system to access raw materials, products’ parts and spare parts on time • Revised performance measurement guidelines to increase effectiveness and pay fair rewards, employees’ satisfaction raised to 99% • Worked with supervisors to oversee all production department personnel/HR issues including hiring, reviews, recognition, disciplinary, attendance, and grievances. • Scheduled Meetings to remove barriers to production and order delivery for timely delivery of orders between departments
-
-
-
Farabi Pharmaceutical Company
-
Isfahan, Iran
-
Product Planning Manager
-
Aug 2012 - Aug 2013
-
Isfahan, Iran
• Scheduled production lines to replenish inventory for on time delivery of orders and maximize production capacity, reached 98% of manufacturing capacity • Measured HR needs to prevent unnecessary workers and balance manpower in various department, achieved 90% of goals• Reviewed business processes work flows to reduce unnecessary steps and make processes more efficient, the project was 60% complete • Reviewed production subsystem of ERP to fix some problems related to MPPS, achieved 50% goals
-
-
-
Nilou Tile Co.
-
Iran, Isfahan, Najafabad
-
Warehouse and Inventory Chief
-
Apr 1998 - Nov 2006
-
Iran, Isfahan, Najafabad
•Designed MRP system to manage product cost and purchase budget •Re-engineered warehouse system to reach warehouse mission, “Right things at the right time in right quantity”, achieved 98% of goal •Designed a new coding system for warehouse items to overcome the limitations of the previous system so that it can be used for fifteen years •Developed the new software for a warehouse information system to manage inventory and control purchase •Designed a dynamic algorithm to determine inventory level for all items, scheduled periodic physical spot check •Designed new layouts for warehouse items, placed warehouse items at new addresses, identified and sold unused and unnecessary items
-
-
Education
-
2020 - 2021Yorkville University
Bachelor of Business Administration, Project Management -
Islamic Azad University, Arak branch
Master's degree, Industrial Engineering -
University of Isfahan
Bachelor's degree, Industrial Management
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. Add an industry
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community