Bio
Experience
-
Largo Concrete Inc.
-
891 W. HAMILTON AVENUE, CAMPBELL, CA 95008
-
PROJECT ENGINEER / PROJECT MANAGER
-
Jan 2003 - Jun 2009
-
891 W. HAMILTON AVENUE, CAMPBELL, CA 95008
2008 - City Heights Condos (175 W. James St. San Jose) - Contractor: Barry SwensonCompleted a four story parking garage and 22 story concrete tower condos including: foundations, walls, columns, elevated slabs, reinforcing steel and post-tensioning.Duration: 10 months Title: Project Manager2007 - 901 San Antonio – Contractor: Regis Homes Client: Regis HomesCompleted concrete package for a 140,000 SF parking garage below housing including: foundations, slab on grade, walls, columns, elevated podium slabs, reinforcing and post-tensioning.Duration: 7 months Title: Project Manager2006 - 46th Street Lofts – Contractor: Barry SwensonAccomplished concrete package for an 80,000 SF two level parking garage below housing and retrofit of an existing 8 story concrete tower including: foundations, contaminated soil, slab on grade, walls, columns, elevated slabs, reinforcing and post-tensioning.Duration: 6 months Title: Project Manager2005 - Tanforan Parking Structure – Contractor: Taisei Construction Client: Century TheatersCompleted a five story parking garage (245,000 SF) below a movie theater including: foundations, slab on grade, walls, columns and elevated slab, bridge to mall, reinforcing and post-tensioning, Duration: 6 months Title: Project Manager2005 - Salinas Parking Structure – Contractor: Swinerton Builders Client: City of SalinasCompleted a four story parking garage (150,000 SF) including: foundations, slab on grade, walls, columns and elevated slabs, reinforcing and post-tensioning.Duration: 8 months Title: Project Manager2003 - San Jose Civic Center - San Jose CM: Turner/Devcon Joint Venture Client: City of San JoseCompleted approximately 200,000 SF of 18” mat foundation as well as construction of all pile caps, grade beams, slab on grade, basement perimeter walls, elevator, sump pits, basement concrete shear walls, mud slabs, etcDuration: 18 months Title: Project Engineer
-
-
-
FRANCIS CONSTRUCTION, INC.
-
HAYWARD, CALIFORNIA
-
ESTIMATOR/PROJECT MANAGER
-
Apr 1995 - Dec 2002
-
HAYWARD, CALIFORNIA
2002 - Muni Metro New Key Stops Project – Phase D – San Francisco Client: SF Municipal RailwayConstructed accessories platform ramps and MUNI controller office building, including: site improvement, sewer, boring, and overhead electrical.Duration: 18 months Title: Estimator/Project Manager2001 - Walnut Grove Bridge & Delta Channel Bridge Seismic Retrofit Client: County of SacramentoRetrofitted existing bridge and constructed new CIP concrete bridge and site improvement.Duration: 6 months Title: Estimator/Project Manager2000 - Country Road Bridge Replacement – Moraga, CA Client: Public Work of MoragaRemoved existing bridge and constructed new CIP concrete bridge and site improvement.Duration: 6 months Title: Estimator/Project Manager1999 - Market & 24th Street Viaduct Seismic Retrofit – S.FRetrofitted existing bridge by extending CIP concrete bent cap and pilaster and constructed concrete fill-in wall, landscape, irrigation and site improvement.Duration: 6 months Title: Estimator/Project Manager1998 - 8 Inch Ductile Iron Water Main Installation in 10th Street – S.FInstallation of DIP water main in 10th Street, San Francisco including: screw tap, lateral service, fire hydrant, and pavement restoration.Duration: 6 months Title: Estimator/Project Manager1997 - Muni Metro New Key Stops Project – Phase B – S.F.Constructed accessories platform ramps in various locations and site improvement.Duration: 12 months Title: Estimator/Project Manager1996 - 8 Inch Ductile Iron Water Main Installtion in Geary Blvd – S.FInstallation of DIP water main in Geary Blvd., San Francisco including: screw tap, lateral services, fire hydrant and pavement restoration.Duration: 6 months Title: Estimator/Project Manager1995 - Highway 380/101 Seismic Retrofit – San Bruno Joint venture with Raisch Gradeway (RGW) to construct seismic retrofit for the junction of Highway 380 and 101 in South San Francisco.Duration: 24 months Title: Project Engineer
-
-
-
-
QUALIFICATIONS
-
1995 - 2001
• Familiar with heavy construction methods and techniques.• Experience in Construction Estimating Programs.• Extensive experience with Microsoft word, Excel, AutoCAD, Microsoft Project and Pro-log.• Office and field operations, including but not limited to, survey, layout, detailing and coordination.• Estimating, writing, processing and negotiating Change Orders and Potential Claims.• Preparing, analyzing and monitoring schedule and job cost forecast.• Writing Subcontract Quote Proposal.• Contract Administration.• Design of false-work and traffic control plans.• Shop Drawing, As-Built drawing and contract Close-Out.• Reviewing and processing technical submittals and Requests for Information.• Calculating quantities and processing monthly progress payment.
-
-
Education
-
1991 - 1995California Polytechnic State University-San Luis Obispo
Bachelor's degree, Construction Management -
1989 - 1991City College of San Francisco
Associate of Arts and Sciences (A.A.S.), Architecture
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Construction and Engineering”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community