Bio

Generated by
Topline AI

Credentials

  • Project Management Professional (PMP)®
    Project Management Institute
    Jan, 2022
    - Apr, 2026

Experience

    • Sr. Electrical Engineer
      • Mar 2019 - Apr 2021
      • United Arab Emirates

      Preparing the Material Take Off, coordination with the site supervisors, forecasting the materials required.Field Engineering activities includes installation termination and pre commissioning of MOVDB and MOV’s.Co-ordination for installation of 33kV Lattice tower works and associated cabling and connection to Power Skid Transformer.Preparation of all final documentation during the closure of the project. Fire Water Tank & Potable Water Tank CP installation and commissioning.11kV/3.3 kV Transformer with NER installation and commissioning.3.3kV Pump Motor Commissioning.Lux testing for normal and emergency lighting.Attended complaints for troubleshooting HV/LV three Phase motors control circuits and Panels control wiring of Plants.Road Crossing Pipe line CP installation and commissioning.

    • Senior Electrical Engineer
      • Nov 2017 - Mar 2019
      • United Arab Emirates

      Provide design review and evaluation of electrical part of the project and coordination with the site Supervisors, Preparing Technical Queries, technical recommendations. Prepare electrical work scopes, schedules, method statement, material specs, sketches, construction work packages, Review of the sketches for the fabrication and other required documentation.Co-ordination for the installation and testing of LV panels and Rectifier Control Panels.Submission of Daily, Weekly and Monthly progress reports

    • Senior Electrical Engineer
      • Apr 2015 - Oct 2017
      • Abudhabi

      Arranging and coordinating with all electrical package vendors for drawings, procedures and services.Project Scheduling, Construction and Co-ordination with various design, consultancy and engineering staff for construction and commissioning activities. Activities related to installation and testing of Switchgears, Transformers, Battery units & LV panels.33kVoverhead line testing & commissioning activities.Deep well earthing & cathodic protection for well heads and pipelines.Pre commissioning and commissioning of 33kV GIS, LV Switchgear, Transformers, Thyristor panel, VFD panel and LV motors (Up to 200kW) with vendors. VLF testing of HV cables using VLF test kit (HV DIAGNOSTICS).Co-ordination for the cabling and termination works for various panels and equipment’s Co-ordination for the quality inspection of all electrical activities.Test reports preparation, As Built scheme and submission to client

  • GISCO
    • United Arab Emirates
    • Senior Electrical Engineer
      • Sep 2013 - Mar 2015
      • United Arab Emirates

      Inspect & direct recommendation for Installation and erection of 11kV and 33kV Switchgear, RMU, Battery Chargers, Transformers, and Cables etc.Supervise, directs and control for Operation and maintenance of 33 and 11kV Distribution Substations Supervise, directs and control for shutdown and Emergency operation of standby 30 MW Power Plant.Planning, affecting and inspection schedule of maintenance recommendation as per work procedure standards. Maintenance of 33 kV Over Head Transmission Line Al Sahil Camp Abu Dhabi. Inter trip checks and Inter lock checks during maintenance period.Operation and maintenance of 11kV and 33kV Switchgears and Transformers.Testing of HV and LV transformer and protections. Testing of Neutral CT, WTI CT and Buchholz relays.

    • Senior Electrical Engineer
      • Jul 2008 - Sep 2013
      • United Arab Emirates

      Works involved in installation of 132kV GIS ,11kV Air Insulated Switchgears, 40MVA Power Transformer, 1000kVA oil type Distribution Transformer, 12MVAR Capacitor Bank, 132kV & 11kV power cable laying & termination works. Installation of Control & Protection Panels, 48V &110V Nickel Cadmium battery banks, Battery charger & DCDB panels, laying and termination of control & LV cables, execution of Earthing and Lightning Protection works.Scheme checking of HV, LV & control panels.Execution of Electromechanical services like Lighting and Small Power works, Cable Route & Tray works.Testing of Earth Grid Resistance using Micro Ohm Meter.Preparation and submittal of Bi-weekly progress report.Installation and commissioning of SIEMENS 8DJH RMU units. Testing of Earth Fault detector using SVERKER 760

    • Operation and Maintenance Engineer
      • Mar 2005 - Jun 2008
      • Kerala, India

      Operations of 110 & 11kV SF6 Circuit Breakers and OLTC Cubicle.Operation and maintenance of 11kV Switchgear and control panels. Maintenance of power transformers ,110 & 11KV SF6 Circuit Breakers, RMU’s and Isolators

  • PRAVIN ELECTRICALS PRIVATE LIMITED
    • Mumbai, Maharashtra, India
    • Construction Engineer
      • Oct 1999 - Feb 2005
      • Mumbai, Maharashtra, India

      Installation and commissioning of 110/11kV,20 MVA Transformer.Installation and commissioning of SF6 CB, CT’s, PT’s, Isolator & LA.Supply and installation of 11kV VCB Panels and CRP.Installation and commissioning of 110V UPS system.Coordination of site activities with Head Office.Scheme checks, Inter trip checks and Interlock checks. Supervise the execution of site work such as Erection, Installation & commissioning of Electrical Equipment,Preparation of working and as built drawing of the Projects.

Education

  • 1995 - 1999
    Mar Athanasius College of Egineering, Kothamangalam, Ernakulam -686 666
    Bachelor's degree, Electrical and Electronics Engineering
  • 1990 - 1992
    Saint Stephens College,Pathanapuram
    Pre Degree, Maths Group
  • 1989 - 1990
    CAMHS
    SSLC

Suggested Services

This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection

Industry Focus. “Construction”

Looking to Create a Custom Project?

Need a custom project? We'll create a solution designed specifically for your project.

Get Started

References

Social Profiles

Community

You need to have a working account to view this content. Click here to join now

Similar Profiles