Bio
Credentials
-
Liner Hanger Simulator Training
BakerHughesJan, 2024- May, 2026 -
Finance for Non-Financial Managers
LinkedInAug, 2021- May, 2026 -
Remedial Systems
Baker Hughes Eastern Hemisphere Education Center, DubaiNov, 2019- May, 2026 -
IWCF Level 1 Well Control
International Well Control ForumOct, 2018- May, 2026 -
Flow Control Systems Academy
Baker Hughes Eastern Hemisphere Education Center, DubaiAug, 2018- May, 2026 -
Packer Systems Academy
Baker Hughes Eastern Hemisphere Education Centre, Dubai
Experience
-
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Field Specialist General
-
Mar 2023 - Present
-
-
Field Specialist IV - Completion and Wellbore Intervention
-
Dec 2018 - Mar 2023
Work with various customers to understand requirements and provide exceptional completion service.Develop client's completion design into full scale completion schematics compatible with BHGE's catalog of completion tools.Liaise with the Reliability and Service Delivery team to secure approval for completion schematics before commencing job preparation processes (pre-job planning meeting/Sub-assembly make-up on the shop floor).Supervise workshop assembly process to ensure client’s load-out date is met.Prepare and review well completion, workover and intervention programs before sending to customers.Assist the sales team with ITT for new projects.Mentor new hires to bridge knowledge gaps among team members.Provide front-line support as Lead completion Supervisor for BHGE crew at the well-site to achieve seamless installation of completion products in the client well.Prepare job packs for equipment preparation on the shop floor, equipment load-out and post installation report and final schematics to the client.Conduct internal post job/well completion meetings to discuss highlights of the job and share lessons for future jobs.Provide support to the completions team as the need arise.Lead completion crew at the wellsite for successful deployment of completion tools at the wellsite (Packers, Flow control, safety systems, sand control tools for open hole horizontal completion).
-
-
Field Specialist III- Completion & Wellbore Intervention
-
Oct 2014 - Dec 2018
• Design (Single and Multiple Zone designs) and implement completion design for clients for equipment preparation and execute job at well site.• Supervise workshop assembly process to ensure client’s load-out date is met.• Prepare and review well completion, workover and intervention programs before sending to customers.• Interface with clients and machines shops representatives to ensure external materials request meet specifications so as not to flaw job execution at wellsite.• Assisted to review job tenders with sales team for ADDAX Petroleum.• Mentor new hires to bridge knowledge gaps among team members.• Review and communicate changes in design/procedures to all parties involved with job preparation and execution.• Prepare checklist for equipment load-out and backloads.• Liaise with vendors to ensure materials supplied meet specification and are within cost range.• Lead Specialist for Safety valve rigless intervention for Total - Obagi 116, NAOC - Azuzuama 4ST, SPDC -Gbaran 5, NDPR - Ogbele 6 & 7, ExxonMobil – Enang 49E, Edop 2B, 19B, 17B, AMNI – Okoro 6.• Completed workover ESP wells for Afren Energy (Ebok Field), NAOC (Clough Creek, Samabri and Tebidaba fields).• Lead Engineer for Single/Dual zone lower and upper completions.• Decomplete ESP completions, single zone, selective and dual zone completions.
-
-
Field Specialist II - Cased Hole Completion
-
Oct 2013 - Oct 2014
Supported Completion field crews to maximize quality and work efficiency as part of completion team at the well-site.Reviewed completion schematics/delivery memo to ensure correct materials and equipment were brought to job sites.Meticulously tracked all parts and equipment used on each job site to ensure rental items are back-loaded after job completion.Supported the workshop team with pressure testing subassemblies, function testing safety valves and preparing data sheet for each subassemblies.Provide completion service at the wellsite for non-complex operations such as installation of permanent bridge plugs, cement retainers, safety valves and single string completion.Communicated daily with job coordinator on job milestones achieved at the shop floor.Mentored team members on the installation of bridge plug and cement retainers.Boosted team productivity for safety valve installation at the wellsite through development of safety valve tool box checklist.
-
-
Field Specialist I
-
Sep 2012 - Sep 2013
Devoted special emphasis to punctuality and worked to maintain outstanding attendance record, consistently arriving to work ready to start immediately.Attended technical training for completion products and services.Supported workshop operation in preparing completion subassemblies.At the wellsite, work as part of the completion crew to deliver flawless well completion.Test Safety valve in the workshop and complete workshop test before shipment to the rigsite.
-
Devyani International (Nigeria) Ltd.
-
Ligali Ayorinde Street, Victoria Island Lagos S...
-
Maintenance Technician
-
May 2012 - Jul 2012
-
Ligali Ayorinde Street, Victoria Island Lagos S...
Repair and Maintenance of electrical fittings and appliances within the shop.Fix plumbing issues with the shop.Perform daily check on generator set, regular monitoring of diesel level in tank and perform routine maintenance.Ensure optimal functionality of all gadgets(Mechanical, electrical etc) r...
-
Grinera Nigeria Limited
-
Km 7, Old Lagos Road, Podo Ibadan Oyo State
-
Shift/Technical Supervisor
-
Nov 2011 - Mar 2012
-
Km 7, Old Lagos Road, Podo Ibadan Oyo State
1. Generate reports on daily work load of the hatchery machine(Intelligent machines)2. Diagnose and clear electrical faults on Tunnel Incubating machines and within the company premises.3. Supervise foremen and attendants during hatchery operation4. Observe hourly operation of the Automated Hatch...
-
PHCN OTA BUSINESS UNIT SANGO OTA OGUN STATE
-
Sango Ota,Ogun State
-
Intern
-
Jan 2007 - Jan 2008
-
Sango Ota,Ogun State
• Termination and connection of armored cables • Testing of transformers and power system equipments• Planning and construction of new & rural power lines• Construction and maintenance of power lines within the district
-
Power Holding Company Of Nigeria
-
Sango Ota, OgunState
-
Intern
-
Oct 2005 - Jan 2006
-
Sango Ota, OgunState
• Termination and connection of armored cables • Testing of transformers and power system equipments• Planning and construction of new & rural power lines• Construction and maintenance of power lines within the district
-
-
Education
-
2014 - 2016University of Portsmouth
-
2005 - 2009Federal Polytechnic Offa
-
2001 - 2004Offa Grammar School, Offa Kwara State
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Oil and Gas”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community