Bio
Experience
-
-
Dy. General Manager
-
-
NJS Consultants
-
Delhi, India
-
Procurement Specialist
-
Jan 2018 - Present
-
Delhi, India
-
-
-
SMEC india ltd
-
Gurgaon, India
-
Water Supply Expert
-
Jan 2017 - Present
-
Gurgaon, India
-
-
-
-
Chief Manager
-
Oct 2011 - Jan 2018
-
-
-
-
Prinicipal consulatnat
-
Apr 2011 - Oct 2011
Job responsibility include design of Intake, Water treatment Plant, Pumping system, economic size of rising mains, Design of distribution system using WaterCAD and preparation of their cost estimates etc.The works of tendering phase include preparation of notice for prequalification of bidders, inviting tender, tender specifications, Tender documents; attending pre bid queries of bidders and evaluation of technical and financial bids. The project objective was to rehabilitate and upgrade the water supply system of Patna by constructing new tube-wells and overhead service reservoirs (OHSRs) /rehabilitating existing tube-wells and OHSRs.; water system for northern part of the town is to consist of Intake, raw water pump house (RWPH), water treatment plant (WTP), transmission mains, OHSRs and secondary and tertiary distribution network and service connections.•Area Drainage study and design of Drainage system for Plot allotted to Maruti Suzuki in Butibora Industrial area, Nagpur . Client : Maruti Suzuki Ltd/JMCResponsibilities include review of Study available information in the form of technical reports and literature to identify and confirm the drainage pattern in the vicinity of proposed plant site and extending up to outfall, Visit the site for acquaintance with the prevailing site conditions, Study the topographical features of project area and catchment influencing the project area, Analyze daily and hourly rainfall data for estimation of extreme rainfall with different return period, Design storm water drainage system for the project area, submit the report to MIDC (Maharashtra Industrial Development Corporation) , visits to MIDC office and obtaining MIDC approval for drainage scheme, Preparation of construction drawings.. The project objective was to design the drainage system of the plot allotted to Maruti Suzuki in Butibora Industrial area, Nagpur
-
-
-
-
Joint Principal Consultant
-
Apr 2011 - Sep 2011
-
-
-
-
Dy. GM
-
Mar 2008 - Mar 2011
-
-
-
-
Dy GM
-
Feb 2008 - Mar 2011
Prefeasibility study, Site Selection for Themal Power Plant for ESSEL GroupPrefeasibility study for setting up Thermal power plant in REWA District of MP by ESSEL group. Responsibilities include identification of site for proposed Thermal power plant, water availability for Plant, site visit and reconnaissance survey•Augmentation of water supply to 2X300 MW thermal power plant at Chandrapur, Maharashtra; a RPG group of company
-
-
-
-
Dy. Chief Engineer
-
Mar 1989 - Feb 2008
-
-
-
-
Supervisor
-
Sep 1988 - Dec 1988
-
-
Education
-
Jodhpur University
B.E, Civil Engineering
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Oil and Gas”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community