See How Many Clients You're Missing Each Month

Simply enter your business email & Topline AI Agent will show you.

Bio

Generated by
Topline AI

Experience

  • BAUER International FZE
    • Douala, Cameroon
    • Quality Control Team Lead
      • Mar 2022 - Sep 2022
      • Douala, Cameroon

      Project: NOVIA Zone 1A - Zone 1B - Jet Grouting Project* In this project, 366 pieces of JG (Jet Grouting) Columns with a diameter of 1200mm with length of 14m-18m were done.

    • Quality Control Team Lead
      • Jul 2021 - Jan 2022
      • Gangtok, Sikkim, India

      Project: Teesta Hydroelectric Project Stage VI - Jet Grouting Project*In this project, 124 pieces of JG (Jet Grouting) Columns with a diameter of 1800mm - 2200mm and with length of 39m were done.

    • Construction Site Manager
      • Aug 2020 - Feb 2021

      Project: Rooppur Nuclear Power Plant Project - RNPP*In this project, 1600 pieces of Jet Grouting Columns with a diameter of 1.60m and with length 22m (Jetting Length was 8.80m and 6.8m) were done.

    • Construction Site Manager
      • May 2020 - Aug 2020

      Project: Rooppur Nuclear Power Plant Project - RNPP*In this project, 161 pieces of Vertical Ground Anchor Piles with a diameter 0.52m and with length 30m were done.

    • Site Construction Manager
      • Jan 2020 - May 2020

      Project: Rooppur Nuclear Power Plant Project - RNPP*In this project, 3719 pieces of DSM (Deep Soil Mixing) Piles with a diameter of 2000mm and with length of 20m-30m were done.

    • Georgia
    • Construction
    • 1 - 100 Employee
    • Site Manager
      • Jul 2018 - Dec 2019

      Project: Demax Tbilisi Multifunctional Building Project.* In this project, 74 pieces of Construction Foundation Piles with a diameter of 1.2m and with length of 50m‐60m were done.

    • Site Manager
      • Feb 2019 - May 2019

      ProjectI Yalcin Tower Foundation Piles project.

    • Site Manager
      • May 2018 - Feb 2019

      Project: Project: Batumi Balneological Recreation Center.* In this project, 139 pieces of Secant Piles with a diameter of 900mm and with length of 21.00m, 74 pieces of Construction Foundation Piles with a diameter of 1500mm and with length of 61.00m were done.

    • Site Manager
      • Apr 2018 - Sep 2018

      Project: Alliance Privilege Foundation Piles Project.* In this project, 230 pieces of Foundation Podium Piles with a diameter of 1.50m and with length of 40‐50 meters, 266 pieces of Secant Piles with a diameter of 1200mm and with length of 15.60m, 15 pieces of Dewatering Wells with a diameter of 1500mm and with length of 20.00m, 145 pieces of Anchor with a diameter of 130mm and with length of 20.00m were done.

    • Site Manager
      • Dec 2017 - May 2018

      Project: Samtredia ‐ Grigoleti Road E‐60 Highway Lot 2 (Bridge No 3,4,5,7,8,9).* In this project, 163 pieces of Foundation Podium Piles with a diameter of 1500mm and withlength of 30, 40, 50 meters were done.

    • Site Manager
      • Oct 2017 - Dec 2017

      Project: Refurbishment of Sheraton Metechi Palace Tbilisi , Temporary Ground Anchor. * In this project, 300 pieces of Anchor with a diameter of 180mm and with length of 10, 15, 20, 25, 30 meters were done.

  • Seza İnşaat
    • Rustavi, Tbilisi / Georgia
    • Site Civil Engineer
      • Jul 2017 - Sep 2017
      • Rustavi, Tbilisi / Georgia

      Modernization of Tbilisi-Rustavi Section of the Tbilisi-Red Bridge (Azerbaijan Border) Road (SECTİON-2).*Within the scope of office work,to attend the monthly field works,evaulente and computerize recorder the progress of field works,to be in contact with subcontractors and arranging daily reports of activity and informing the field employer and field employer representative.Client: Dohwa Engineering Co. LTD

  • Bechtel-Enka Joint Venture
    • Gardabani, Georgia
    • E&I Hand Over and Punch Team Lead.-Coordinator
      • Dec 2016 - Jul 2017
      • Gardabani, Georgia

      Project: South Caucasus Pipeline Expansion Project (SCPX) - CSG1 Station*Developing QC, hand over and punch team organization.*Preparing, controlling,verifing and validating QC & Hand Over team works.*Preparing red-lines, follow up ITRs and walking downs organization.*Supporting vendor inspections.*Analayzing QC & hand over progress and preparing the reports.Client: British Petrol-bp

    • Construction Site Manager
      • Aug 2015 - Dec 2016
      • Marneuli, Georgia

      Project: 500/225/11 KV Substation Marneuli / Georgia*Excavation and support work, checking and reporting that the manufacture is carried out properly and completly.*Concrete production is carried out in accordance with the project,relevant standart requierements,farbrication conformity of each fabric of molds and conformity of concrete woven to standarts.*Within the scope of office work,to attend the monthly salary works,evaulente and computerize recorder the progress of field works,arranging daily reports of activity and informing the field employer and field employer representative.Client: FICHTNER

  • NUROL LLC
    • Akhalkalaki, Georgia
    • Site Engineer
      • Nov 2012 - Sep 2013
      • Akhalkalaki, Georgia

      Located in Georgia, with an installed capacity of 90 MW Paravani Regulator and HEPP Construction Project. Within the scope of the project is 14,179 meters Power Tunnel, Regulator, Power House, 1050 meters away, 120 meters underground, Penstock, Salt Range and Electric Transmission Line is located.*In Power Plant excavation and support work, checking and reporting that the manufacture is carried out properly and completly.*To ensure that concrete production is carried out in accordance with the project,relevant standart requierements, farbrication conformity of each fabric of molds and conformity of concrete woven to standarts.*Within the scope of office work,evaulente and computerize recorder the progress of field works,arranging daily reports of activity and informing the field employer and field employer representative.Client: Anadolu Group

    • Site Manager
      • Jul 2012 - Nov 2012
      • Tbilisi, Georgia

      The 705,000 sq metre real estate development project is situated on the banks of the River Kura overlooking Tblisi. Consisting of 22 apartment blocks with 1, 2 and 3 room flats, shopping and office areas, the project is the largest multi-use residential development in Georgia and the South Caucasus.*Base excavation and support work, checking and reporting that the manufacture is carried out properly and completly.*To ensure that coated concrete production is carried out in accordance with the project,relevant standart requierements, farbrication conformity of each fabric of molds and conformity of concrete woven to standarts.

    • Control Tunnel Engineer
      • Feb 2011 - Jun 2012
      • Akhalkalaki, Georgia

      Project: Paravani Hydroelectric Power Plant projectLocated in Georgia, with an installed capacity of 90 MW Paravani Regulator and HEPP Construction Project. Within the scope of the project is 14,179 meters Power Tunnel, Regulator, Power House, 1050 meters away, 120 meters underground, Penstock, Salt Range and Electric Transmission Line is located.*Energy Tunnel excavation and support work, checking and reporting that the manufacture is carried out properly and completely.*Within the scope of office work,to attend the monthly salary works,evaulente and computerize recorder the progress of field works,arranging daily reports of activity and informing the field employer and field employer representative.Client: Anadolu Group

  • Enep Argus Engineering LLC
    • Ağstafa, Ganja-Gazakh, Azerbaijan
    • Site Civil Engineer
      • Aug 2010 - Jan 2011
      • Ağstafa, Ganja-Gazakh, Azerbaijan

      Project: Water and Sewer Pipes in Agstafa Infrastructure Restructuring and Repair works*Excavation and support work, checking and reporting that the manufacture is carried out properly and completly.*The making of topographical observations during excavation time and to do before and after.*Within the scope of office work,to attend the monthly salary works,evaulente and computerize recorder the progress of field works,arranging daily reports of activity and informing the field employer and field employer representative.

    • Office Engineer
      • Jun 2009 - Jul 2010
      • Baki, Azerbaijan

      Project: DRAGON OIL - EPICE For New 30" Block-2 - NPF Trunkline and Two Sub-Sea Pipelines*Field Data Book (FDB) For Pipe Lay Analysis*Static, Sensitivity and Dynamic Analysis*Weld Repair Calculation – MathCad*A & R (Abandonment and Recovery) Analysis*Davit Lift & Start-Up Analysis*Calculation of Interaction Ratios (LCC & DCC) as per DNV-OS–F101 – MathCad*Design of Pulling Heads, Lay Down Heads, Abandon & Recovery Hooks and etc…*Stalk-on-Riser Modeling in STAAD Pro 2007*AutoCad 2-D & 3-D Drawings – Pulling Head, Abandonment & Recovery Hook, Anchor Pattern, etc…

Education

  • 2013 - 2016
    Sakarya Üniversitesi
    Master's degree, High Civil Engineering Construction
  • 2005 - 2009
    Azerbaijan Architecture and Construction University
    Bachelor's degree, Civil Engineering
  • 1994 - 2005
    Public School
    5/5

Suggested Services

This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection

Industry Focus. “Construction”

Looking to Create a Custom Project?

Need a custom project? We'll create a solution designed specifically for your project.

Get Started

References

Social Profiles

Community

You need to have a working account to view this content. Click here to join now

Similar Profiles