Bio
Experience
-
Lenso Aerospace Co., Ltd.
-
Bang Na District, Bangkok City, Thailand
-
Director of Project and Commercial
-
Apr 2020 - Present
-
Bang Na District, Bangkok City, Thailand
-
-
-
To70 Aviation Consultants (Thailand) Co., Ltd.
-
Bangkok Metropolitan Area, Thailand
-
Aviation consultant
-
Feb 2017 - Apr 2020
-
Bangkok Metropolitan Area, Thailand
• Project management / co-ordination• Provide training• Provide workshop / seminar• Development of training syllabuses and guidance material • Perform feasibility study and gap analysis • Development of procedural documents
-
-
-
-
Engineering Expert
-
Jan 2016 - Feb 2017
Review, audit and approval of Airlines Documentation, Aircraft Maintenance Station, Maintenance Training Courses: in line with related Thai Laws and International Regulations.
-
-
-
-
Engineering Supervisor
-
Jun 2009 - Dec 2015
• Part of Pioneer team in Greenfield project: heavily involved in defining lay out and setting up of Management System through certification of AS9100 (ISO 9001 equivalent), NADCAP and Customer’s qualification requirement.• Overseas Training in affiliated company, overseeing and studying Manufacturing / Inspection Processes and Operational management system of Composite Production: in preparation of Transferring projects from UK to Thailand• Provide Technical support, processes and products related, to other departments as well as external parties, i.e. suppliers, customers, internal and external auditors, Corporates, etc. • Co-ordinate with Quality Team to undertake swift action, closing of NCRs and preventing further quality concerns, using:- Logical and Systematic thinking, - Incorporating 8D, Why Why Why, Fishbone, etc. - Set up / reviewing of SPC data and Pareto analysis, for monitoring and verification.• Manage a team of Manufacturing Engineers and Quality Engineers. • Plan and Manage Transferring Project through Qualification and Customer’s approval, activities including but not limited to:- Develop and implement manufacturing processes based on Customer’s drawings and requirements- Establish PFMEA, Project/Equipment Risk Assessment, Work Instructions- Setting up of Manufacturing Process flow, incorporating Lean system- Processes and Equipment Qualification- FPQ and FAI- Establish Standard Cycle Time, supporting Production Control and Planning - Establish Training and Evaluation system for Composite production - Training of Operational team, ensuring quality and conformity to both processes, products and systems - Training to Cross-functional team and departments, introducing Composite Manufacturing processes, products and general awareness• Provide strategic directions for all engineering activities, including Continuous Improvement activities: Cycle Time Reduction, Quality Improvement, 6S, OEE study
-
-
-
-
Production Engineer
-
May 2007 - Jun 2009
• Optimise 'cost vs. quality' in vehicle production by recommending for implementation or through researches for new materials and/or manufacturing methods for a particular component.• Organize and Lead Project to support Cost Reduction activity:- Prepare strategy based on company yearly target: aligning project direction and timeline with company's common goal.- Presentation and gaining concurrence from Management level, being Technical and Non-Technical audiences.- Project Monitoring until implementation of Mass Production, including Engineering Change Control
-
-
Education
-
2002 - 2006Loughborough University
Master of Engineering (MEng), Aeronautical Engineering -
1995 - 2002St Edmunds School, Canterbury, KENT, UK
A levels, Sciences and Maths
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Aviation and Aerospace Component Manufacturing”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community