See How Many Clients You're Missing Each Month

Simply enter your business email & Topline AI Agent will show you.

Bio

Generated by
Topline AI
Naimi Naimi is a seasoned engineer with 10+ years of experience in full-stack web development, project construction (MEP), and operation & maintenance. He has worked with Envitech Perkasa, PT. Envitech Perkasa, and PT. Indah Kiat Pulp & Paper.Mill, overseeing projects such as WTP 5 Deltamas, STP AEON Mall, and Desalination Plant – Candra Asri Petrochemical. He holds a Bachelor's degree in Industrial Engineering from Universitas Serang Raya and has skills in coordination, individual testing, supervision, and performance testing.

Experience

    • Pre Comm & Commisioning
      • Aug 2017 - Present

      PRECOM & COMMISIONING1. Coordination with User planning Pre Comm & Commisioning2. Individual testing installation equipment and Report Activity (Precom)3. Joint witnessed Complete Installation (Mech. Complation) check list Document & Punchlist Document4. Supervision – Vendor Installation Mechical, Electrical, Instrument – Reporting Wekly Report5. Joint Witness - EnergizePanel - Medium Voltage (MV) – Check Connection Busbur, Check Conection ControlCheck Function Earting Switch & Mechanical Open-Close LBS (Incoming & Outgoing)Test Function Fault (Trip) from DGPT trafo in MV PanelEnergize MV Panel check Incoming Voltage from PLN 20 KV and Check Phase Rotation from Trafo- Low Voltage (LV) Check Connection Busbar Incoming (ACB) From trafo.Check Connection System ATS-AMF and Simulasion systemCheck setting Module ATS-AMF from LV PanelCheck Digital power metering after Energize MV panel on Incoming LV Panel (Voltage 380-400 VAC)6. Supervision Site Acception Test (SAT)- Facility Pump - Proses Raw and DistributionSolo Run Test (Uncouple) – Collect data – Vibration Motor (DE, NDE) Temperatur, Noise, RPM, Voltage, Current.Final Alignment – Couple couplingTest Performance Pump – Collect data – Vibration, Temperatur, Noise, RPM, Voltage, Current, kW, Pressure, Flowrate ( Q.shut off, Q. Min, Q. Mean, Q. Duty, Q.120%of Duty)- InstrumentCalibration & Setting Instrument Transmitter Loop comunication Equipment transmitter and PLC- Automation SystemMake sure cable connection from MCC (equipment installed) terminal have been terminated based on number or tanggingIndividual check address from modul PLCInput Output (I O ) Check Modul (DI, DO, AI,AO) main system control PLC before to system squence automaticIndividual start/stop testing MCC Panel control to command EquipmentTesting Squence Logic based on Piloshopy control – Auto mode testing7. Performance Test System Install full Capacity, Collecting data Performance test and Report

  • PT. Envitech Perkasa
    • Greater Jakarta Area, Indonesia
    • Operation & Maintenance
      • Aug 2017 - May 2024
      • Greater Jakarta Area, Indonesia

      Project Contruction (MEP), Commisioning & Operation Maintenance1. Project WTP 5 Deltamas (Sinarmas Land) 2. Project STP AEON Mall – Serpong (Sinarmas Land)3. Project Desalination Plant – Candra Asri Petrochemical4. Project SPAM Jatisari Kap. 200 lps – Bekasi5. Project Pertamina Cepu – Installation System control Decanter6. Project WWTP AIH Karawang – Arta Graha Group7. Project SPAM Gresik Kap. 1000 lps - Gresik8. Project Desalination – Bogasari Surabaya9. Project Mori Building (Grey & Rain Water system) – Jakarta10. Project SPAM Kampar Kap. 1000 lpd – Kampar Pekanbaru11. Project Secondary Clarifier Cap.35000 M3/day – Tjiwi KimiaOPERATION & MAINTENANCE (O M)1. Monitoring Equipment Installation After Commisioning – Weekly Check list data Equipment Report2. Create work instructions (SOP) for operations team to use based on manual intruction for installed equipment3. Responsible for operational asset and equipment across all location4. Overseeing the maintenance of machinery and equipment Panel Electrical & Intrument any Installed for support proses5. Troubleshooting and diagnosing mechanical problem with Equipment (Instrument Transmitter, componen/part Panel, PLC and Part Modul) identification any isue & Conduct repair or Replacement6. Coordination with supplier for procrument spare parts and necessary supply for maintenance7. Control and Monitoring Quality Proses treated water during Warranty period8. Planning periodic check Equipment install unit based on operating time (Calibration Instrument Transmitter, Checking Componen Panel & Inverter (VSD), Mechinery - Greasing, Vibration, Noise, etc) - Monthly Report and Report every 6 month

  • PT.Indah Kiat Pulp & Paper.Mill
    • Serang Area, Banten, Indonesia
    • Proses Waste Water Treatment & Utility Maintenance
      • Jul 2008 - Dec 2016
      • Serang Area, Banten, Indonesia

Education

  • 2010 - 2015
    Universitas Serang Raya
    Bachelor's degree, Industrial Engineering

Suggested Services

This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection

Industry Focus. “Air, Water, and Waste Program Management”

Looking to Create a Custom Project?

Need a custom project? We'll create a solution designed specifically for your project.

Get Started

References

Community

You need to have a working account to view this content. Click here to join now

Similar Profiles