Bio
Experience
-
Axiome Construction
-
Benin Cotonou
-
Projects Manager
-
Mar 2024 - Present
-
Benin Cotonou
-Cove Beach Hotel & Resort-Business Center
-
-
-
-
Project Manager
-
Feb 2015 - Dec 2022
Plan, manage, and execute a highly complex project within the agreed timeframe, specification, and cost.● Recognised for consistently achieving performance targets and set deadlines.● Tracked project performance and formulated comprehensive reports for the general manager.● Streamlined end-to-end project operations and resolved complex technical issues.● Successfully delivered Alraidah housing complex project based on FIDIC. Housing Complex Project based on FIDIC. Housing Project, 74 buildings. Contract Sum: SAR 1,861,000,000 ($509,863,013.70)Reporting to General Manager, responsibilities included Control and Management of all activities of the project and technical issues.
-
-
Deputy Project Manager
-
Feb 2014 - Sep 2015
Delivered leadership and direction to improve strategic planning, operational efficiency, and project management. Ensure unhindered productivity and successful project delivery by determining goals, time frames, limitations, procedures, staffing requirements, and allotment of resources in coordination with management.● Reviewed the scope of the project, evaluated the project specifications, and analysed the project budget to identify areas of improvement and implement best practices to meet client satisfaction and internal.Dammam North Housing Project based on FIDIC and Ministry of Housing Specifications , Infrastructure Project, Sewer Pipeline 36 km by Vitrified Clay Pipe and 24 km by UPVC Pipe, Drainage Pipeline 35.6 km by GRP Pipe and 24 km by UPVC Pipe, Potable Water Pipeline 15.6 km by DI Pipe and 24 km by UPVC pipe, Irrigation Pipeline 37.6 km by HDPE Pipe and 1.5 km by UPVC Pipe. Asphalt road 45 km. Pump Station and Lift Stations, Detention Ponds. Road Lightning, Traffic Lightning, All kind of Electrical works... Contract Sum: SAR 669,206,017.56 ($178,454,938.02)Reporting to Project Manager and Director, responsibilities included Control and Management of all activities of the project and technical issues.
-
-
Project Manager
-
Aug 2013 - Feb 2014
-
Iraq
Kirkuk - Baiji LPG & Dry Gas Pipeline EPC Project and based on FIDIC. Contract Sum: $127,242,355.12110 km Pipeline by Carbon Steel Pipe and 600m pipeline Sub river by HDD, Chambers, 110 km Fibre Optic cable.Reporting to Projects Coordinator, responsibilities included Control and Management of all activities of the project.
-
AYDINER CONSTRUCTIONS – ABUDHABI (AYDINER Group)
-
Abu Dhabi, United Arab Emirates
-
Technical Office Manager
-
Jun 2010 - Aug 2013
-
Abu Dhabi, United Arab Emirates
Mussafah Water Transmission Scheme (MWTS), EPC Project and based on FIDIC, Mussafah to Abu Dhabi (Lot M). Contract Sum (Dhs): 763,233,541.57/ ($209,105,079.88)34 km Pipeline by Ductile Iron Pipe and Service Road, 1433 m Pipeline sub-sea by Carbon Steel Pipe ( Horizontal Directional Drilling HDD), Construction of NDRC and road crossing by micro tunneling, Chambers, Pump Station and 73 km fibre optic cable.
-
-
Technical Office Manager
-
Apr 2008 - May 2010
-
Iraq
Monitored project’s progress and reported to main office and project manager.GURBAG has put its signature to many comprehensive projects in Turkey and abroad.Project Detail:Scope: Duhok Water supply project and Treatment Plant, EPC Project and based on FIDIC. Contract Sum $ 256.569.691,00 for 1st and 2nd stage.Steel pipelines; DN2000 3 km, DN1500 30 km, DN1200 25 km, DN900 22 km, DN700 28 km, DN600 7 km, DN550 5 km, DN400 8km, DN300 14 km and Service road 41 km (Asphalt 29 km).Construct the Treatment buildings; Pump Station (Intake), Filters, Aeration Tank, Presedimentation, Water Tanks, Clarifiers, Backwash, High Lift Pump Station, Chlorine and Alum Houses, Office, Guard House, Other Buildings and Culverts & Bridges.
-
-
Construction Manager
-
Mar 2006 - Feb 2008
-
Turkey
Reporting to Project Director and General Manger, responsibilities included Control and Management of all activities of the project. Set up the project, co-ordinate subcontractor, and assisted with the practical section chiefs and site engineers. Furthermore, managing and monitoring all activities of the projects. This includes Ready for Commissioning and repairs for completion handovers closing all contractual issues during construction and contractual maintenance periods
-
-
Construction Manager
-
Nov 2004 - Feb 2006
-
Iraq
Construction and contracting company.Contractor is YALI Construction company, HAWLER PLAZA HOTEL (5 Star) in Erbil, residential villas and Pure Water Factory. Contract sum $ 17,868,723.21Reporting to the CEO and Project Manager, Management of all activities of the projects. Introducing good site management practices, and assisting specialist subcontractors. Identified commercial difficulties, facilitated claims.
-
-
Site Engineer
-
Jan 2001 - Oct 2004
-
Turkey
Gunsayıl Construction actives in construction of hotels, housing, dams, hydroelectric power plant, irrigation, water transportation systems, infrastructure systems, roads, tunnels, superstructure and pipelines.Şanlıurfa Plain Part 3 Irrigation Project, Main channels 134 km, drainage channels 113 km, concrete pipelines 150 km, GRP pipelines 47 km, steel pipelines 12 km, operation and maintenance roads 167 km, pump stations 5 units, regulator 1 unit, siphon 23 unit. Contract sum $66,328,000Responsible for excavation, compaction, ordering scheduling storage and supervision of laying line / level and inspections. This includes final testing and repairs for completion handovers closing all contractual issues during construction and contractual maintenance periods.
-
-
Education
-
1995 - 2001Eastern Mediterranean University
Engineer's degree, Faculty of Civil Engineering - Civil Engineering
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Construction”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community