Principal Engineer
-
Jul 2023 - Present
-
Sindh
working at: construction of NAI GAJ Dam a project by WAPDA, Pakistan with total current value of 45 billion PKR.Project Features: 59m high and 1137m long embankment zoned Dam with central clay , 5000 Acres reservoir area with gross storage capacity of 0.30 MAF. 8 Nos embankment dykes.Mainspillway: Lybrinth Wier type, 245m width having 425,000 cusecs discharge. Auxiliary Spillway: Ungated Ogge type, 548m wide having 320,000 cusecs discharge capacity.Irrigation system: Main canal (6.56km) having 295 cusecs discharge capacity with 2 Distributaries (32km) and 3 Minors (30km) for GCA of 56,739 acres.Power House: 4.3 MWGravity Main: transport capacity is 50 cusecs , toal length is 52 km.•Leading and managing consultant supervision team of 19 members at construction site to carry out day to day tasks of quality control and monitor project performance
-
-
-
Rehman Habib Consultant
-
Quetta-Balochistan, Pakistan
-
Executive Project Engineer/Chief Resident Engineer
-
Oct 2019 - May 2023
-
Quetta-Balochistan, Pakistan
Worked at: Construction of 100 Dams in Baluchistan Package-III (20 Dams) Project, with appurtenant structures. estimated at 9.5 Billion PKR. Irrigation Department, Govt. of Baluchistan | Pakistan as executing agencyProject Main Features:North zone included 7 Nos homogeneous Earth filled Dams, with max height 30m, Dam length ranges from 93m to 1927m. 3 Nos Gravity Dams with height ranges from 19m to 30 m and length from 90m to 101m.South Zone included 9 Nos Homogeneous Earth filled Dams, with max height 24m, length ranges from 350m to 2632m.1 No Gravity Dam with height 31m and length 147m.•Led a project comprising 28 Delay Action Dams, scattered across the province, constituting 44% of the country's area. •Organized consultant central core team of 7 employees and field teams consisting of 2 Resident Engineers at North and south zone with 4 Senior Engineers each having a crew of 10 site inspectors and 5 technical staff. •Revitalized and optimized the quality of the works by 50% strictly adhering to QA and QC methodology, technical specifications, construction drawings,Collaborated with design office to prepare revised drawings of 12 dams, cost analysis of 28 subprojects, proposed design changes in 6 dams observing actual site geology conditions.•coordinated with the project's stakeholders, directed the project's finances, met deadlines, overcame construction constraints by locals and resumed 7 abandoned dam sites, spoke to 150 locals to settle site issues.•Reviewed the baseline schedule, assessed the project's progress, and handled issues relating to contractors' claims, and extensions of time.•Verified and affirmed payment certificates of 16 construction firms, finalized 45 variation orders, bills of quantities, checked and approved shop drawings of spillways and intake towers of 28 subprojects.•Developed weekly and monthly progress reports of 28 dams and drafted 500 letters to the contractors. Ensured compliance with FIDIC, ASTM, and AASHTO regulations.
-
-
-
JV CIV-TECH Associates & EPAC consultants
-
Peshawar|Pak
-
Senior Project Engineer/Resident Engineer
-
Feb 2016 - Feb 2019
-
Peshawar|Pak
Worked at: Construction of Shakai Earth Dam-Wana with appurtenant structures,Irrrigation system and water supply scheme, estimated at 877 million PKR. FATA Development Authority | Pakistan as executing agency.Project Main FeaturesZoned Clay Core rock filled Dam with Reservior gross storage capacity up to 2040 AF, Live Storage=1717 AF, length at axis 498m, height of embankment=32m. RCC Ungated Ogee Spillway capacity 934 cumec, Width=60m. RCC Intake tower 4.5m x 4.5m & height=22m. RCC encased Conduit RCC pipe 0.6m dia & L=165m. RCC Dissipation chamber with Control Valve.Access road Asphaltic with cross drainage and erosion works. PCC Irrigation Channels L=15km for 1600 Acre cultivated land. Drinking water system for 3200 persons (400 houses) for 0.048 MGD demand.•Prepared Technical sanctions, assisted head office in Preparing Revised PC-1 and created Primavera P6 schedules for contractor to ensure the timely completion of project.•Managed and monitored Geotechnical investigation in design review stage.•Conducted site visits in design review stage and liaised with the design team to finalize the construction drawings, design changes, detailed bill of quantities, contour mapping, and cost estimation.•Designed 1.7km asphalt road, imported points in civil 3d, surfacing, plan production, profile creation, estimated cut & fill quantities of earthwork as per AASHTO Geometric design.•Ensured Contractor's compliance with the Contract Documents, its control and review, inspection of workmanship and materials, record keeping & reporting, planning inspection works, field inspections, quality control assurance, document control and filing etc.•Kept the project on schedule and within budget while serving as project leader, identify & counter construction constraints, Base line schedule review and progress evaluation.•Monitored the material incorporated in the work, the materials stored at the site, and the contractor's manpower and equipment.
-
-
-
EA consulting Pvt Ltd | Pakistan
-
Peshawar|Pakistan
-
Project Engineer/ A. Resident Engineer
-
Aug 2015 - Jan 2016
-
Peshawar|Pakistan
Worked at 5 Months Fast Track Project,Construction of 3 Flyovers at Phase III Entry-Jamrud Road Peshawar Including HMA surfacing,estimated at 1.75 billion PKR. Peshawar Development Authority (PDA) | Pakistan as executing agency.Project Main FeaturesPrestressed-Girder Bridge1 L=450m, Prestressed-Girder Bridge2 L=475m, Prestressed-Girder Bridge3 L=450m, Prestressed-Girder Bridge4 L=575m. Total Piles=368 Nos. Total PC Box Girders=197 Nos.HMA Asphalt over decks, Ramps and Link Roads T. L= 6km. Reinforced Earth Walls Ramps with pre-cast panels 223 Nos. RCC Drainage System with Pre- Cast RCC Sewer pipes 1.5m dia.•Reported to S.R.E, kept him up-to-date of daily site activities and managed the site supervisory staff.•As Assistant Resident engineer my main task was to manage the supervision and monitoring of reinforcement, RCC concrete and pre stressing works •Regulated and supported the technical staff of 7 employees in carrying out quality assurance and quality control standards in the ongoing site construction activities related to monitoring Borehole drilling, cast-in-place RCC piling work, post-tensioning, grout work in pre-stressed concrete Box-Girders, road earthworks, and pile integrity testing, and reinforced earth wall. •Checked and confirmed bar bending schedule of 197 Prestressed Girders, 368 RCC piles, 45 Pile-Caps, 45 Transom Shafts, 45 Transoms, Bridge decks and RCC sewerage conduits,•Made regular site visits, conducted progress meetings, drafted daily and weekly progress reports, facilitated and assisted the Senior Resident Engineer.
-
-
-
Shoukat Khan & Company | Pakistan
-
Tank|Pakistan
-
Project Manager
-
Jan 2015 - Jul 2015
-
Tank|Pakistan
Worked at:Gomal Zam Dam Multipurpose Project Irrigation Component GZD-03-F-Irrigation canals, minors and distributaries. Estimated at 80 million PKR. Water & Power Development Authority, KPK | Pakistan as an executing agency.Project Main FeaturesPathar Minor L=4.42 km with 01 Culvert, 04 Falls, 06 Outlets. Diyal Minor L=11.24 km with 03 Culverts, 06 Falls, 12 Outlets, 01 F.Bridge.Manjhi Minor L=10.4 km with 03 Culverts, 07 Falls, 09 Outlets. 01 F.Bridge.Ranwal Minor L=10.50 km with 04 Culverts, 10 Falls, 21 Outlets.Azmi Minor L=6.56 km with 02 Culverts, 04 Falls, 09 Outlets. Construction of service roads along all 05 minors.•Planned the whole Project, breaking down the work structure as per BOQ items, assigning durations & resources to activities in Primavera P6 and linking activities logically to obtain critical path.•Made baseline work schedule, monitored and updated regularly as per actual site conditions.•Developed an appropriate organization structure thus building effective construction team, providing training to staff to enable them to perform their key roles.•Procured machinery, plant and materials as per approved work schedule to ensure timely completion.•Responsible for working with client on understanding requirements, creating functional specifications, contributing to design, creating project plans, delivering the project on-time with available resources without compromising on quality.
-
-
-
JV-CIV TECH and EPAC Consultant Peshawar
-
FR,TANK-KPK | Pakistan
-
Senior Project Engineer/Resident Engineer
-
Jan 2012 - Nov 2014
-
FR,TANK-KPK | Pakistan
Worked at:Construction of Sheen Kach Earth Dam-FR TANK with appurtenant structures and Irrigation system.estimated at 180 million PKR. FATA Development Authority, KPK | Pakistan as executing agency.Project Main FeaturesZoned Clay Core rock filled Dam with reservior of gross storage capacity up to 2416 AF, and Live storage is 1525 AF, length at axis 200m, height of embank =21m. RCC Ungated Ogee Spillway capacity 4893 cusecs, Width=18m.RCC Intake tower 2.4m x 1.3m & height =18m. RCC encased Conduit RCC pipe 0.45m dia & L=105m. RCC Energy Dissipation chamber with Control Valve. Encased RCC Irrigation pipe 0.3 m dia, L=1.8km for 260 acres cultivated land. Access road shingle with cross drainage and erosion works.•Presented proposals, provided recommendations, prepared variations and approved work schedules.•Utilized and managed field staff to ensure the works at site in accordance with the contract specifications.•Checked and certified Monthly Payment statements, prepared Daily and Monthly Progress Reports, charts.•Progress Review Meetings with the Contractors and client, review and comment to RFI’s of Contractor.•Checked and approved shop drawings and Bar Bending Schedules of Spillway, Intake tower, Dissipation chamber and Irrigation RCC pipes etc.•Inspected and reviewed project components during execution to ensure strict compliance with standards and specifications.•Performed drafting according to specifications and FIDIC conditions of contract to ensure compliance of works with contract documents.•Coordinated with the Contractor's Project Manager in charge of the work on a frequent basis to ensure that no issue is encountered and to offset the events causing Contractor’s delay and cost Claims.
-
-
-
-
Senior Project Engineer/Resident engineer
-
Apr 2010 - Dec 2011
Worked at USAID funded, Quick Impact Projects in FATA, Construction & rehabilitation of HMA Roads and structures, estimated at 14 billion PKR. FATA Development Corporation | Pakistan as executing Agency.Project Main FeaturesTank-jandola road L=53 km, 104 Slab culverts. Jandola-Makin road L=65 km, 127 Slab Culverts. Razmak-Makin-Miranshah road L=72 km, 153 Slab Culverts. Tank-Gomal-Wana Road L=115 km,197 culverts. Banu-Mir Ali-Ghulam khan road L=78 km, 141 Culverts. RCC Causeways, PCC & Stone masonry Retaining walls, Brest walls, toe walls, PCC shoulders and road side drains. Prestressed Girder Bridges 6 N0's. Realignment of Roads.Condition surveys of Existing structures/Bridges.•Performed as key lead engineer, technical and supervision advisor to Pakistan armed forces construction organization (FWO) on design and build contracts. •Served to cope with changes in road alignment, produced new horizontal alignment and profile in Civil 3D and AutoCAD after selecting new routes, carried out condition surveys of structures, and proposed recommendations.•Applied personal technical competency and experience to provide specialist directions, proposals, and solutions to office design team on unusual and difficult engineering problems related to highway structures.
-
-
-
M/s ACE (Pvt) Ltd.
-
Kohistan district and shangla district KPK-Pakistan
-
Project Engineer/Assistant Resident Engineer
-
Jan 2008 - Mar 2010
-
Kohistan district and shangla district KPK-Pakistan
Worked atAsian Development Bank assisted Earthquake Emergency Assistance Project EEAP-Construction & Rehabilitation of Roads in District Battagram, District Shangla & District Kohistan.Work and Service Department, KPK | Pakistan as executing agency.Project Main FeaturesBit-Mac and Shingle Roads in district Kohistan and district Shangla, Earthwork; Cutting, filling and compaction etc.Stone masonry Retaining Structures.RCC Slab Culverts.RCC Causeways.Existing Road condition survey in Shangla.Conduct Site survey to prepare Inventory of cross-Drainage Structures.•Headed a team of 7 members, organized and administered the construction supervision in different districts.•Compiled and presented public reports and environmental impact statements to inform stakeholders, municipal officials and members of public about planned civil projects.•Surveyed sites, collected measurements, and assessed project conditions prepared take-offs for project costing for 14 roads in two districts, selected the location, nature, numbers and sizes of slab culverts and stone masonry retaining and breast walls depending upon hydrology conditions of the area.
-
-
-
-
ARE/ Resident Engineer
-
Nov 2006 - Dec 2007
Worked atAsian Development Bank (ADB) assisted ICB-05 Projects in Baluchistan. Construction of highway (102km) and 5 No's Prestressed Bridges, estimated at 1.45 billion PKR. Work and Service Dept. Balochistan | Pakistan as executing agency. Project Main FeaturesHighway L=102 km Zhob to MirAli khel-Kajuri kach with 68 Nos Box Culverts, 177 Nos Stone Masonry RCC deck Culverts, 09 Nos pipe Culverts and 07 Nos RCC Causeways,Retaining structures and Embankment Protections.05 Nos Prestressed Girder Bridges.Bridge1 L=160m, span L=20m, Piles=76 Nos, PC-Girders = 32 Nos.Bridge2 L=125m, span L=25m, Piles=36 Nos, PC-Girders = 20 Nos. Bridge3 L=75m, span L=25m, Piles=28 Nos, PC-Girders = 12 Nos. Bridge4 L=75m, span L=25m, Piles=28 Nos, PC-Girders=12 Nos Bridge5 L=200m, span L=20m, Piles=92 Nos, PC-Girders= 40 Nos•Arranged and chaired Regular meetings with the Contractor/ other site staff on continuing operations on site after regular site visits, on scheduled progress, contractual and technical problems that may affect the contractor's performance or ability to meet the contract objectives and kept daily diary of site events.•Oriented, assigned and supervised the general oversight of supervisory staff daily activities including work assignments, onsite performance and guidance on the supervision of the contractor's operations.
-
-
-
M/s ACE (Pvt) Ltd, Lahore | Pakistan
-
Zhob|Pakistan
-
Quality control Inspector
-
Jan 2005 - Oct 2006
-
Zhob|Pakistan
Worked atConstruction of 6-Bridges including Approach Roads.Zhob-Mughal Kot Section N-50.estimated at 260 million PKR. National Highway Authority (NHA) | Pakistan as executing agency.Project Main FeaturesSimtua Nullah Bridge1 L=75m, RCC Bored Piles=22 Nos, PC Girders=08 Nos.Silyaza Nullah Bridge2 L=370m, RCC Bored Piles=82 Nos, PC Girders=44 Nos.Zahra Teeza Bridge1 L=100m , RCC bored Piles=34 Nos, PC Girders=16 Nos.Khorena Nullah Bridge2 L=50m, RCC bored Piles=22 Nos, PC Girders=8 Nos.Gurgera Nullah Bridge3 L=140m, RCC bored Piles=40, PC Girders=20 Nos.Dhanasar Nullah Bridge4 L=152m, RCC bored Piles=48 Nos, PC Girders=20.Premix / Bit- Mac Access roads with aggregate base and subbase underneath. Box Culverts and slope Protection works.Effective and regular supervision of the works to ensure that the works are executed in accordance with established standards, criteria, specifications. Supervision of Pile Load Test of the project Supervision and maintaining record of prestressing of Girders. Inspecting concreting of various Mix designs of different structural components of bridge.
-
-
-
M/s AMCO (Pvt) Ltd, | Pakistan
-
Quetta|Pakistan
-
Construction Engineer
-
Feb 2002 - Dec 2004
-
Quetta|Pakistan
Worked atConstruction of 5-Bridges including Approach Roads. Quetta-Sibbi Section N-65.estimated at 60 million PKR. National Highway Authority (NHA) | Pakistan as executing agency.
-
-
-
FWO | Pakistan
-
FR D.I.Khan
-
Trainee Engineer
-
Apr 2001 - Dec 2001
-
FR D.I.Khan
Worked atConstruction of 124 km long highway including Bridges and Protection works. D.I.Khan-Mughal Kot Road Project N-50. National Highway Authority (NHA) | Pakistan as executing agency.
-
-
Education
-
IQRA National University- Peshawar Pakistan
Master in Construction Engineering and Management, Civil Engineering -
1997 - 2001CECOS University of Information Technology and Emerging Sciences
Engineer's Degree, Civil Engineering -
1994 - 1996Central science College,Federal Board Islamabad, PAK
Pre-engineering degree, Engineering -
1982 - 1993Sunrise Cambridge School Rawalpindi,PAK
S.S.C (Science), Mathematics and Computer Science
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Civil Engineering”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community