Bio
Experience
-
-
Egypt
-
Architecture and Planning
-
500 - 600 Employee
-
Resident Engineer
-
Nov 2017 - Present
-
-
Resident Engineer
-
Nov 2017 - Aug 2018
Construction of the Crescent Project- 13 Multi story Buildings with the associated External Work forming part of the project known as MIVIDA PROJECT. The Contract is a lumpsum Contract for the sum of (USD 37 M).
-
M.D Studios
-
Cairo - Egypt
-
Construction Project Manager
-
Jan 2016 - Present
-
Cairo - Egypt
Self employee
-
-
Resident Engineer
-
Oct 2016 - Oct 2017
-
Egypt
Construction of the German School - KG Building with the associated External Work forming part of the project known as MIVIDA PROJECT. The Contract is a re-measured Contract with fixed rates for the sum of (USD 3 M).
-
Bernard-ltd KSA
-
Riyadh, KSA
-
Resident Engineer
-
Jul 2012 - Mar 2015
-
Riyadh, KSA
Monitors construction project progress by reviewing and approving payments, costs/cost forecasts, budgets and schedules, monitoring and mitigating issues with staff, analyzing budget status reports, and updating staff regarding the current schedule.
-
-
Supervisor Construction Manager
-
Jul 2009 - Feb 2011
-
Libya
Plan, direct, coordinate, budget, usually through subordinate supervisory personnel, activities concerned with the construction and maintenance of structures, facilities, and systems. Participate in the conceptual development of a construction project and oversee its organization, scheduling, and implementation.
-
ARABTEC Construction, L.L.C. Dubai, UAE.
-
United Arab Emirates
-
Senior Project Engineer
-
Oct 2006 - Jun 2009
-
United Arab Emirates
Supports the implementation of projects within time and budget to the desired standards and stated objectives.Lead, plan, control and direct specific aspects of projects and/or smaller value projects within time and budget to the desired standards and stated objectives.Effective risk and issue management in place leading to increased project success.Project stakeholders fully briefed throughout the Development stage. Support Quality Health and Safety Environment (QHSE) activities, policies and objectives and compliance with the laws and regulations.
-
-
Construction Manager
-
Oct 2002 - Sep 2006
-
Egypt
Perform a technical, organizational and supervisory role on the project.Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.Responsible for site security, health and safety, and supervision of materials.Acting as the main technical adviser on the construction site for subcontractors, crafts people and operatives. Liaising with the local authority to ensure compliance with local construction regulations and by-laws. Resolving any unexpected technical difficulties, and take actions to deal with the results of delays, bad weather, or emergencies at construction site. Preparing weekly project status report.
-
-
Projects Engineer
-
Nov 1985 - Sep 2002
-
Egypt
Prepare technical proposals.Participate in interview presentations.Plan, Organize, Direct, Execute, and Control project team activities.Define project scope, budget, and schedule.Review and / or supervise technical aspects of work.Primary responsibility of quality control and client contact.Set goals and evaluate staff performance.Serve as a resource and mentor to less experienced staff members.Commit resources of the firm issuing start and stop orders relating to the project progress and clients directives withincontract requirements. Prepare the necessary designs and plans of the new pipelines routes to permit a perfect connection to both the existing sewer system and existing pumping station and to allow for future expansions. Diversion of all utilities located within working area. Construction of two sleeve tunnels crossing under King Faisal road with diameter 2900 mm and a total length of 139.5 m, using unbolted tunneling technique, to act as a sleeve enclosing the new Force Main and Gravity lines.Install of 790 LM. Lined steel and ductile iron pipes with 450 mm, 900 mm, and 1000-mm diameters, inside the two sleeve tunnels. Construction of 1200-mm dim., pipe jacking, crossing under the gravity lines.Install of 1500 LM. Ductile iron pipes with 1500-mm diameters. Execution of jacking & receiving shafts, by employing the shaft sinking technique.Execution of all deep de-watering activities.Execution of the required R.C. valve chambers and manholes, all.ontract requirements.
-
-
Education
-
1977 - 1982Ain Shams University
B.Sc.,, Civil Engineering -
1977 - 1982Ain Shams University
B.Sc.,, Civil Engineering Structure Dept
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Architecture and Planning”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community