M1. Junction 27
-
Senior Bridge Engineer.
-
Jul 2009 - Present
-
M1. Junction 27
I designed a remedial propping scheme for the M6/M1 interchange bridge. My solution involved founding props upon asphalt carriageways. I developed the concept and supervised the testing to prove it worked.
-
-
-
AMScott (Now part of URS-(formerly Scottwilson)
-
Mansfield. Nottinghamshire
-
Project engineer
-
Sep 2002 - Jul 2009
-
Mansfield. Nottinghamshire
Working for the Bridge Manager I ran the bridge assessment program writing QA procedures and prioritising bridge assessments. I justified the work, produced estimates, assessed the structures and handled tons of paperwork. I helped develop the HA's Steady State Assessment Review report which ...
-
-
-
Scottwilson Consulting Engineers ( Now URS.)
-
Chesterfield
-
Senior Project Engineer
-
Apr 2001 - Sep 2002
-
Chesterfield
Carried out the bid design of a 217metre span, post-tensioned concrete box girder bridge under the A1 trunk road in Scotland. After winning the contract I designed the substructures and carried out an internal check on the superstructure.
-
-
-
Derbyshire Consulting Engineers
-
Matlock Derbyshire
-
Project Engineer
-
Dec 1993 - May 2001
-
Matlock Derbyshire
I managed the Railtrack “Bridgeguard 3” bridge assessment program raising engineering issues in contract documents. Later, I wrote a master Bridge Inspection Defect Guide, and standard risk assessments, method statements and bridge inspection reports. I assessed or checked about 60 Railtrack brid...
-
-
-
Allott and Lomax
-
Nottingham
-
Structures,Highways & Bridge Engineer
-
Sep 1989 - Dec 1993
-
Nottingham
I designed the "Glulam" beams for a new library at Cambridge University and designed minor buildings elsewhere.I designed 3 alternative alignments for the 15 km long, A6 Loughborough by-pass producing sections of the TAR report (Costings, bridge details and environmental audits.) I also...
-
-
-
John Burrow & Partners ( Now Waterman Aspen)
-
Derbyshire
-
Project engineer
-
Apr 1988 - Sep 1989
-
Derbyshire
I designed steel framed buildings for Daloon Foods; Lincoln and others and the hinged raft-foundation slab, masonry walls and steel framed roof of Kings Mill Hospice, Mansfield. I also Cat 2 checked all the bridges on the A6 Quorn-Mountsorrel bypass. I was seconded to an American Aid agency to in...
-
-
-
British Railways
-
London, United Kingdom
-
British Railways - Various Positions (Design & Site)
-
Oct 1978 - Apr 1988
-
London, United Kingdom
I spent 7 years designing railway bridges.The largest of these was a 120 metre span, steel, warren truss over the Manchester ring motorway. I spent 18 months on site as (a) an Engineer’s Representative supervising Works at St Pancras Station; and (b) running a Direct Labour Organisation site dur...
-
-
-
Witherslack Hall School, Cumbria.
-
Cumbria.
-
Teacher and Houseparent
-
Sep 1977 - Aug 1978
-
Cumbria.
Taught Maths and Technical Drawing to O level and English, Music and basic Science to small classes of 11-16 year old boys in a residential school for children in care. Provided evening and overnight supervision and emotional support.
-
-
Education
-
1974 - 1977University of Lancaster
-
1973 - 1974Middlesex Polytechnic, Tottenham, London
-
1966 - 1972St Ignatius College, Enfield, London
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. Add an industry
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community