Bio
Experience
-
Valino Architect and Assc.
-
Miami, Florida
-
Project Manager (Freelancer)
-
2011 - Present
-
Miami, Florida
Design Development and Management of Residential, Retail Projects.Coordination and Implementation of all Engineering requirements to the Architectural.Analyse, Modify and Optimize interior space flow.Projects Worked Cubellas Residence at Gables by the Sea (1,200 sq/ft Outdoor Cabana addition). Adult Rehabilitation Center (2,500 sq/ft New Construction) Top Cargo Warehouse (20,696sq/ft Two Story, Tilt-up Construction)
-
-
-
I.D.E.A. ( International Design Engineers and Architects )
-
Aventura, Broward
-
Project Manager
-
2011 - 2011
-
Aventura, Broward
Development of construction documents for residential improvements (Miami Area).Haiti reconstruction of an Orphanage Safe House.Projects Worked Mc Donald Restaurant (New Image Prototype in Canada) Various High Rise Residential (Remodeling)
-
-
-
Pacetti Architects
-
Miami, Florida
-
Project Manager
-
2007 - 2010
-
Miami, Florida
Development of Construction Documents for Residential, Industrial, Retail and Mercantile .Projects Worked Gold Coast Beverage expansion (refrigerated warehouse) Homestead.Various Retail (Tenant Improvements and New Constructions).Residential (Remodeling, Additions and Code Violations Compliance)
-
-
-
Gershen and Associates
-
Miami, Florida
-
Project CAD Operator
-
1998 - 2010
-
Miami, Florida
Designed and Develop all Architectural New Construction Documents.Inspect and Document existing conditions of Infrastructures for Tenant Improvements.Retrofit existing infrastructures to comply with New Images (Fast food Restaurants Chains)Remodel all tri-county BK’s to ADA compliance.Projects Worked Burger King’s, Wendy's, Subway’s and others (New Construction) Bally's Fitness Ctr., Linens-N-Things. (New Tilt-up Construction) Applebee’s Restaurants, Johnny Carino’s, Carrabba’s Italian Grill. (New Const.)
-
-
-
wolfberg and Alvares Architects
-
Miami, Florida
-
CAD Operator
-
1994 - 1997
-
Miami, Florida
Inspecting/Documenting existing roof conditions for DCPS to determine magnitude of scope of work..Re-roofing and improvement DCPS Maintenance facilities.Drafting and Detailing Diverse Construction Projects.Projects Worked Veteran Administration Hospital/Housing Ctr, and Parking lot Bldg., ( 8 Floors Tower with Interstitials Space and 3 Floor Garage (1,000,000 sq/ft gross Const.)Over 300 Dade & Broward Schools (Re-roofing, Additions and Remodeling).
-
-
Education
-
1983 - 1985Florida International University
-
1980 - 1982Valencia College
-
1979 -Fork Union Military Academy
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Architecture and Planning”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community