Bio
Experience
-
-
Assistant Project Manager
-
Jan 2011 - Jun 2011
Design of a central Press Mill Machine utilities (Model =M-3000 Germany), including the design of chilled water, hot water, compressed air and gas piping, etc. Also the design of heating and cooling system as well as stabilizing humidity for the printing machine in the building.
-
-
Designer & Supervisor
-
Sep 2010 - Jan 2011
Surface water collecting for 15 bridges in a capital city in which some are complete, and some are currently being rehabilitated.
-
-
Designing of Utilities
-
Oct 2009 - Sep 2010
The design of renovation of a Telecom building utilities was completed including: - HVAC System- Mechanical Room Equipments- Piping System for Water, Fire Protection, Sewage, Rain Leaders and Gas.
-
-
Project Manager & HVAC Designer
-
Dec 2007 - Oct 2009
This job was regarding a fiber chemical factory which has two sections consist of “Administration” and “Industrial”.The utilities system for the administration section including HVAC Systems, Piping and Plumbing(Water, Fire Protection, Gas and Sewage) were completely designed. And the structural design for the Industrial section (including Reboiler, Main Structure, Reactor, Tank foundations, etc) was completed.Also the Civil Design including Rough Grading, Finish Grading and Underground was completed for both sections.
-
-
Utility Designer & Installation Supervisor
-
Jul 2007 - Nov 2007
An old canteen for a campus of a University was extended and the design, rehabilitation, installation and commissioning were completed.
-
-
Supervision of Utilities Installation
-
Nov 2006 - Jul 2007
Extension of Sewage Treatment for a port including Aeration Tanks, Setting Tanks, Chlorinator and Drying Bed.
-
-
Installation Supervision
-
Feb 2004 - Jun 2006
Supervision of utilities installations for a sport complex which consists of 4 pools for women, men and kids, two basketball courts, two body building gyms and a two story parking lot with a capacity of 400 cars.
-
-
Utilities Installation Supervisor
-
Aug 2003 - Feb 2004
HVAC Systems and Piping for “Assembling Building of Automobiles” located in Saloon No. 4 of a car factory(48,000 square meter) consist of: - Heating and Cooling system for the saloon - Surface water collecting of the sloped roof of the building- Sewage system and collections- “Mechanical room equipments” including: Boilers, Air washers, Pumps, etc.- Ventilation of polluted air by using 140 exhaust fans
-
-
Utilities Installation Supervisor
-
Dec 2002 - Aug 2003
A four floor building, with approximately 12,000 m² area is an official building. Design and installation supervision of mechanical utilities have been completed consist of :- Sprinkler system for 3 level parking- HVAC system for entire building- Piping system (water-fire protection, sewage, rain loaders, gas piping) for entire building- Mechanical room equipments
-
-
Designer of Utilities
-
Jun 2002 - Dec 2002
Designing utilities for a complex whith a strange structure was completed.
-
-
Utility Design and Installation Supervision
-
Feb 2002 - Jun 2002
Designing and installation supervision of Piping for fire protection and collecting surface water network in a jetty.
-
-
Piping Designer
-
Jun 2001 - Feb 2002
Control of designing the Piping between tank-farms and Loading arms of Oil-Jetties for Loading and Undloading Ships(offshore).
-
-
Utilities Design Controller
-
Jan 2001 - Jun 2001
Control of utilities DWG of millennium high rise buildingControlling the design of HVAC system, Fire protection, Sewage and water piping for
-
-
Mechanical Designer
-
Mar 1994 - Jan 2001
Water piping for consumption for a city for leather factories as well as the design of sewage tunnel for collection and treatment of their sewage.
-
-
Mechanical Utility Designer
-
Jan 1992 - Mar 1994
Designing of HVAC System as well as Water, Sewage, Sprinklers and Fire Protection Piping for an international airport.
-
-
Mechanical Design Controller and Supervision
-
Jan 1989 - Jan 1992
Controlling and supervision of the Heating and Cooling System and Sanitary Piping for an international airport.
-
-
Mechanical Designer
-
Jul 1983 - Jan 1989
Feasibility study and design of a new town utility networks including water, gas, sewage and surface water collecting.
-
-
Mechanical Supervisor
-
Dec 1980 - Jul 1983
Installation and commissioning of some equipments in the melting section of a copper melting factory.
-
-
Mechanical Supervisor
-
Sep 1978 - Dec 1980
Installing and Commissioning of equipments for a Milk Factory with capacity of 500 Tons.
-
-
Field Engineering and Supervision
-
Sep 1975 - Sep 1978
Preparing the International Bidding and Contract’s documents and managing the storage of the equipments in the site for a Milk Factory.
-
-
Assistant of Supervision
-
Dec 1974 - Sep 1975
Technical support for installation of an oil pumping station.
-
Education
-
Howard University, Washington D.C
-
Azad University
-
Howard University Wash D C
-
Management of International Transportation
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. Add an industry
Looking to Create a Custom Project?Get StartedNeed a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community
You need to have a working account to view this content. Click here to join now -