Bio
Experience
-
-
Pipeline Design Project Manager
-
-
-
Pipeline Design Project Manager
-
Feb 2010 - Present
work in the Lafayette office for T. Baker Smith
-
-
-
-
Facility Operations Mgr.
-
Jun 2008 - Aug 2009
Responsible for daily operations of two underground gas storage salt caverns and a leaching facility. Managed an operations and maintenance crew of eleven and two administrative personnel. This facility has gas operations with five interstate gas pipelines; a gas pipeline system; and leaching o...
-
-
-
-
Senior Project Engineer-Field Operations Technical Support
-
Jan 1999 - Jan 2008
Provided operational technical support to gas pipeline operating districts within Texas, Louisiana and Mississippi (Cypress Division). Duties included project management of field projects. Daily duties included: DOT (PHMSA) code work, compliance issues and DOT population density surveys Operations & maintenance proceduresLiaison with field, design & permitting groups Design review of operational issues related to compression facility expansionPreventative maintenance oversightPipeline stress loading calculationsOther duties included coordination with Business Development and design project teams on proposed facility interconnections, facility sales and overseeing construction projects with the operating districts.Responsible for technical support issues related to dehydration, liquids separation and gas storage facilities for Williams for their Washington gas storage facility and their Gulf Coast midstream facilities; Supported Transco gas operations for nine years handling various operational issues related to compressor station, pipeline and metering facilities.Experience managing capital and expense projects in Transco Cypress Division including the following duties: project technical evaluation, cost estimating, budgeting, permitting support, project contract execution, material procurement, and project closeout with material reconciliation.; Field pipeline integrity support including smart pigging, anomaly investigation & recoating. Right-of-way stabilization throughout Texas, Louisiana and Mississippi.API 653 tank inspection and tank repairs.Hydrographic river depth of cover surveys over pipeline crossings.
-
-
Senior Pipeline Design Engineer
-
Jun 1997 - Oct 1999
Involved in a $500 million pipeline expansion project for Williams Gas Pipeline in New Jersey and Pennsylvania. Expansion project consisted of pipeline looping and compressor station expansion in the Northeast. Responsibilities included pipeline design and permitting support for local, state and Federal permits and FERC support. I handled the design of three 42" pipeline loops in New Jersey (Woodbridge, Roseland and Stirling) along with major river crossings with HDD installation. Project interaction with land and major electrical utility (NJ PSE&G) to finalize pipeline alignment along existing electrical utility corridor. Worked as the lead design engineer, to coordinate with business development, project management, drafting, survey, land, permitting, and construction as well as with the entire Transco design team. Managed the Gulf Interstate Engineering consulting team working on the FERC filing, drafting, permitting plats and final pipeline design layout. Handled the pipeline design effort on several smart pig pipeline integrity projects for Transco along the east coast. These projects involved facility modifications including pig trap replacements, mainline block valve replacements and subsequent anomaly pipe replacement.
-
-
Senior Project Engineer
-
1997 - 2008
-
-
Senior Project Engineer
-
Jan 1994 - Jan 1997
Performed the mechanical and civil design of several pipeline projects for Exxon Pipeline and Arco Pipeline. Work consisted of installing booster pump and metering facilities for ethane and propylene service. Other projects included additional crude oil pumping capacity and ten miles of 12"...
-
-
Senior Project Engineer
-
1994 - 1997
-
-
Env., Health & Safety Manager
-
Jan 1991 - Jan 1992
Overall responsibilities included environmental waste management and environmental reporting. Duties included environmental and safety policies and procedures including lock out/tag out, confined space entry safe work and safe excavation procedures. Handled spill remediation and spill reporting...
-
-
Senior Project Engineer
-
Jan 1989 - Jan 1992
Worked in these two bulk liquids storage terminal facilities on the Houston Ship Channel. Duties included the following:Piping manifold and booster pump design Tank embankment and road repairsTank high level alarm systemsConstruction scheduling including tie-insStorage tank construction and tan...
-
-
Pipeline Project Engineer
-
Jan 1981 - Jan 1989
Responsible for all phases of pipeline system design on crude oil and refined products pipeline systems including: booster pumping stations; pipeline replacement; metering and prover facility design. Performed project development including all phases of project design and management including: ...
-
-
Education
-
University of Houston
-
Louisiana State University
-
University of Houston
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Energy and Utilities”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community