Bio
Experience
-
-
Egypt
-
Oil and Gas
-
1 - 100 Employee
-
DRLG Gen. Mngr. Assistant
-
Nov 2014 - Present
-
-
Maintenance Supervisor
-
Jul 2012 - Present
- Design, install and maintain the electrical system for the new rigs.- Maintain the used equipment to get in the operation such as mud pumps (3508 M/C). - Get in touch with the new equipment's manufacturer to start up the machines and to activate the guarantee period. - Make all maintenance schedules for the rigs equipment; prepare the maintenance plan for the equipment, Supervision for the mechanic and the electrician to do the job as best done.- Responsible for Maintaining, Repairing & the required maintenance reports during the operations.- Establishes and maintains a computerized maintenance management system for tracking work orders, spare parts, and maintenance history of rig equipment.- Reviews the operation of the rigs equipment and systems constantly to minimize unplanned downtime, anticipate solve problems in a timely manner and identify opportunities for improvement.
-
-
Technical Engineer
-
2011 - Aug 2012
- Worked as Mud Logger and act as Technical Engineer in PEDEX 202 rig located in Ahwaz during the drilling operations and well testing, Make the rigging up & down for the units and support the units during the operations. - Worked in Data Transmission Systems between the rigs and the owner's offices such as PETROPARS office with ABAN-8 and SAHAR-1 offshore rigs and between MWD unit & MLU to send the data to the owner's office from both units or to interchange data between them.
-
-
Project/Field Engineer
-
Aug 2010 - Dec 2011
- Worked in Diamond offshore Ocean Spur Rig and TRANSOCEAN (ADX rig & Comet rig) as Sureclean Company in Tank Cleaning & HVAC Duct cleaning & Survey.- Worked in BP (ATLANTIS. S.B. Africa and S.B. Asia boats) as Sureclean Company in Tank Cleaning using Vacuum pump and Water Jetting Equipment.- Get the project call off (info) from the operations manager.- Handle the projects with project supervisor and make the required paper work as TIPOOC's standard procedures.- Ensure successful execution of projects through proper management, planning, scheduling and the optimum deployment of resources.- Coordinate and Liaise between the customer and the project supervisor and TIPOCO's operatives to ensure the proper planning schedule is executed.- Handle project documentation and tracking operation progress.- Co-ordination with third party sub-contractors and vendors and the management of Project supplies and materials.- Responsible for all the operational operatives timesheet signed from the project supervisor and the monthly timesheet to be delivered to the finance.- lead the crew during the operationsPractical training for the following courses:-- OSHA Scaffold Competent Person Training.- Confined space entry course – Emergency rescue course – COSHH course – Working at height course – Risk Assessment Course - Water jetting course (high pressure and ultra high pressure units).- WJA member.- HVAC inspection and duct cleaning equipments.
-
Cairomedi for elevators
-
Egypt
-
Installation Engineer
-
Feb 2009 - Aug 2010
-
Egypt
1. Elevator design, maintenance and control panel installation2. With full knowledge of BS EN-81(Safety rules for the construction & installation of lifts).3. Study the elevators tenders (specifications).4. Make all the quotations requested by the costumers in case of local manufactures elevators OR package system elevators imported from FELESA Spain. Important Projects installed under supervision 1. Interior ministry (3 elevators in minister assistances building (with VVVF control)).2. Scientific research academy (1 Movilift elevator(closed loop system))3. Elfostat city (12 elevators)4. Atomic Energy Authority (maintenance for 4 THYSSEN elevators(closed loop system )) Ability for programming the following types of inverters (VSD):1. Toshiba inverters (VF-S11 type). 2. LS (LG) inverters (closed loop).3. Arkel inverters (closed loop). 4. Schneider electric inverters.
-
-
Networks Engineer
-
Nov 2008 - Feb 2009
-
Egypt
- Electricity distribution from 11KV to consumer - Feeders & its components.- All protections in the feeders - R.M.U & its components.- Electrometers commissioning (Losses committee).
-
-
Education
-
2013 - 2014Cairo University
Preparation to Pre-Master Petroleum Engineering, Petroleum Engineering -
2002 - 2008Cairo University
Bachelor of Engineering (B.Eng.), Electrical and Machines Dept.
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Oil and Gas”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community