See How Many Clients You're Missing Each Month

Simply enter your business email & Topline AI Agent will show you.

Bio

Generated by
Topline AI
Kris Prasad is a seasoned civil engineer with extensive experience in project management, technical oversight, and delivery of water infrastructure projects. He has worked on various projects, including the Brunswick Valley STP and the Kingscliff STP, and has a strong background in contract management, technical documentation, and client liaison. Kris holds a Master of Technology in Structural Engineering, a Bachelor of Engineering in Civil Engineering, and a Graduate Diploma in Applied Computing.

Experience

    • Senior Project Engineer
      • Oct 2006 - Oct 2015
      • Brisbane

      Project resourcing, technical oversight, project delivery and project management of water infrastructure projects – roles including contract management, review technical documentation, project resourcing and client liaison. Key projects included:Site Engineer/Project Manager - 2009 to 2012 Brunswick Valley STP. 18,000 EP at Mullumbimby NSW Site Engineer / Project Manager – Construction of new Sewage Treatment Plant (STP) for Kingscliff in NSW designed for 25,000 EP.For both the projects I was responsible for administering the 2-year defects liability period and obtaining the “Certificate of Completion” from the clients. Both the projects delivered the above the margins what was allowed during the bidding stage.

  • Tokyo Engineering Consultants
    • Head office in Tokyo but worked at Site in East Timor
    • Senior Consultant
      • Feb 2001 - Aug 2005
      • Head office in Tokyo but worked at Site in East Timor

      Project Management, Contract Administration, Construction supervision & Management and Quality Control for the following water supply and Distribution networks projects funded by Japanese Government Key Projects included:Construction of a water supply scheme of a total capacity of 520 ML/d for the state of KeralaTeam Leader and Resident Representative, Dili, East Timor, Tokyo Engineering Consultants Co., Ltd for Dili Water Supply and Rehabilitation Project in Dili (11.7 Million USD)Urgent rehabilitation and Improvement to water supplies to Liquica, Lospalos, and Manatuto, in East Timor (2.7 Million USD).I submitted the paper to Engineers Australia Darwin division and received “Highly Commended” in the Engineering Excellence Awards 2004

  • SunWater
    • Brisbane, Australia
    • Senior Engineer
      • Sep 1998 - Jul 2000
      • Brisbane, Australia

      Project engineer involved in a number of projects including• Feasibility study for the Gladstone Area Water Board to augment the bulk water supply from the current demand of 40 000ML/a to 190 000ML/a by the year 2025. • Feasibility study for the AQC (Kogan Creek) Pty Ltd to supply raw water for the proposed coal based thermal power station (800MW) near Brigalow about 280km northwest of Brisbane. The annual average raw water requirement is 16 000ML/a for the wet cooling and 1500ML/a for the dry cooling option. • Development of project management system including preparation of schedule, resource management and reporting arrangement for the Callide Pipeline Augmentation Project (35 million $) relating to proposed Callide C Power Station.• Team leader for the remedial works relating to left bank of the Wivenhoe spillway works.• Coordination and development of reporting system for the Y2k related work for the State Water Projects.

    • Team Leader
      • Oct 1996 - Aug 1998
      • India

      Posted to New Delhi to manage the ¥17.8 billion funded by Oversees Economic Corporation Funding (OECF) aimed at abating pollution of the Yamuna River. The project consisted of 26 wastewater treatment plants, collection systems, and modernization of solid wastewater management system.

  • PNG Power Ltd
    • Port Moresby
    • Generation Planning Engineer
      • Feb 1988 - Oct 1996
      • Port Moresby

      Responsible for all investigation, forward planning, conceptual design, specification of generation plants consisting of hydroelectric, thermal, and alternative energy sources such as geothermal, solar technology. The job involved computer modeling of systems, optimization and financial, economic justification of water supply, generation, and transmission developments.

Education

  • 1969 - 1971
    Indian Institure of Technology
    Master of Technology, Structural Engineering
  • 1961 - 1967
    University Vishweshwaraya College of Engineering
    Bachelor of Engineering, Civil Engineering
  • CQUniversity
    Graduate Diploma in Applied computing
  • Engineers Australia
    Registration, Civil Engineering

Suggested Services

This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection

Industry Focus. “Civil Engineering”

Looking to Create a Custom Project?

Need a custom project? We'll create a solution designed specifically for your project.

Get Started

References

Community

You need to have a working account to view this content. Click here to join now

Similar Profiles