Bio
Experience
-
Stilt Studios
-
Bali, Indonesia
-
Site Manager
-
Dec 2023 - Present
-
Bali, Indonesia
- Lead the Construction of Resort, Villa, and Housing Project with 2 types of buildings, namely wooden type and concrete type starting from planning to execution on site, through management of the supervisor team, MEP team, interior team, architect team and sub-contractor team, as well as carrying out time schedule management.- Completed the renovation of 1 unit Villa with building specifications of 3 bedroom units, 1 mini library unit, 1 kitchen unit, 1 mini bar, 1 big dining room, rooftop pool, rooftop party area and landscape area.- Completed 2 villa units with a wooden building type with 1 unit studio room, and 1 unit double bedroom along with related architecture and interiors.- Completed 1 unit housing with a wooden building type with 4 units bedroom, 1 unit kitchen and dining room, 1 unit swimming pool, and landscape area along with related architecture and interior.- Managed ±80 human resource included to the supervision team, wood workers, steel workers and contractors
-
-
-
PT Tol Jagat Kerthi Bali
-
Denpasar, Bali, Indonesia
-
Engineering / Site Coordinator
-
Dec 2022 - Present
-
Denpasar, Bali, Indonesia
- Lead the construction of the National Strategic Project for the Gilimanuk - Mengwi Toll Road with a Project Value of ±24 Trillion and length of 96 km with a variety of structures of 44 units main bridge, 1 unit overpass box, 88 units overpass bridge, 39 units underpass box, 3 units JPO, 27 units culvert box and 13 units arc culverts.- Coordinated design and calculation toll road structure, main bridges, box overpasses, overpass bridges, box underpasses, JPOs, and arch culverts. Managed to maintain consortium relation with stakeholders for plan and construction toll road works (Bina Marga, BPJT and JBH).- Developed and optimized the design of 20+ main bridges on toll roads and succeeded in optimizing the construction value of up to 240 billion rupiah for the section 1 area (Gilimanuk-Pekutatan).- Lead planning for work construction methods prepared by each contractor.- Manage ±100 human resource included to the design consultants, supervision consultants and contractors.
-
-
-
PT Wijaya Karya (Persero) Tbk
-
Indonesia
-
Site Engineer
-
Dec 2019 - Apr 2023
-
Indonesia
- Completed the Jakarta-Bandung High Speed Railway National Strategic Project (Halim Station Section) with a Project Value of 3.1 Trillion and 4 km length area with a variety of elevated structures of 3.3 km and subgrade structure of 650 m.- Implemented the Box Girder construction method on height level of construction 16-22 meters with structural safety factor.- Completed 137 units of high risk Box Girder structures (4 units of Box Girder with mass concrete) with cast in situ method at height of 16-22 meters for the first time in Indonesia, 2 units of bridge balance cantilever structures (special span) with cast in situ method of 170 m and 140 m, and 2 areas of subgrade structures with excavation and embankment methods and CFG foundations along 400 m and 250 m.- Accelerated the construction schedule with a total acceleration of ±356 days by modifying construction methods and shifting work.- Completed the Halim HSR Station Building and Halim LRT-HSR Integration Station.- Managed to maintain good relations with stakeholders plan and construction High Speed Railway works(Directorate General of Railways, Directorate General of Transportation, Bina Marga, PT. Jasa Marga), Owner and Supervision Consultant.- Become the leader of the supervision team and sub-contractors and lead ± 800 project human resources.
-
-
-
-
Student Internship
-
Jun 2017 - Aug 2017
-
Indonesia
- Carried out quality inspection for building structure of Cipete Raya MRT Station and Fatmawati MRT Station.- Carried out appropriate work construction methods and manage resource requirements.- Generate site progress monitoring analysis reports.
-
-
-
Geotechnic Laboratory Universitas Indonesia (UI)
-
Depok, Jawa Barat, Indonesia
-
Geotechnic Laboratory Assistant
-
Aug 2016 - Jun 2017
-
Depok, Jawa Barat, Indonesia
- Led >300 students conduct to laboratory soil testing as a basis for construction.- Successfully provide analyzing the results of soil testing as a basis for construction calculations.
-
-
Education
-
2014 - 2019University of Indonesia
Bachelor's degree, Civil Engineering -
2011 - 2014SMA Negeri 4 Denpasar
-
2008 - 2011SMP Negeri 1 Kuta Utara
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Real Estate”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community