Bio
Credentials
-
Cursos virtuales Control del trabajo.
Frontera Energy Corp.Mar, 2021- Apr, 2026 -
Cursos virtuales entrenamiento CDT
Frontera Energy Corp.Mar, 2021- Apr, 2026 -
Cursos virtuales EPPs & Levantamiento manual de cargas.
Frontera Energy Corp.Mar, 2021- Apr, 2026 -
Cursos virtuales Espacios confinados y manejo de productos químicos.
Frontera Energy Corp.Mar, 2021- Apr, 2026 -
Cursos virtuales Excavaciones y trabajos seguro en alturas.
Frontera Energy Corp.Mar, 2021- Apr, 2026 -
Cursos virtuales Identificación de peligros.
Frontera Energy Corp.Mar, 2021- Apr, 2026 -
Cursos virtuales Levantamiento mecánico de cargas & aislamiento.
Frontera Energy Corp.Mar, 2021- Apr, 2026 -
Cursos virtuales Permisos de trabajo
Frontera Energy Corp.Mar, 2021- Apr, 2026 -
Cursos virtuales Seguridad vial.
Frontera Energy Corp.Mar, 2021- Apr, 2026
Experience
-
-
Colombia
-
Oil and Gas
-
300 - 400 Employee
-
Rig Manager
-
Dec 2021 - May 2023
ACHIEVEMENT: Completed in record time the drilling in the area and mobilization of the equipment.
-
-
Tool Pusher
-
Dec 2021 - May 2023
-
Petroworks SAS
-
Campo Quifa Meta
-
Rig Manager
-
Dec 2018 - Apr 2020
-
Campo Quifa Meta
ACHIEVEMENT: Develop skills on 1000 HP equipment at Oilfield Quifa.
-
Mecánicos Asociados S.A.S. - MASA
-
Distrito Capital, Colombia La Loma Cesar
-
RIG MANAGER
-
Nov 2017 - Nov 2018
-
Distrito Capital, Colombia La Loma Cesar
ACHIEVEMENT: Performed gas drilling at the Drummond mine, completed the completion of the drilled wells, successfully completing the job in the shortest time possible.
-
Petroland
-
Distrito Capital, Colombia
-
RIG MANAGER
-
May 2017 - May 2017
-
Distrito Capital, Colombia
TERMINACION DE CONTRATO
-
Tuscany Drilling
-
Colombia
-
Rig Manager
-
Dec 2011 - Jan 2015
-
Colombia
Rig 1000 HP: SUBSTRUCTURE: Hydraulic telescoping, floor height 16 ft. DRAWWORK: Load craft 1.000 HP – 2 Motors C15 , drilling line 1 1/8” MUD PUMPS: National oil well 9P -100 Triplex. TOP DRIVE: Warrior 250 Hydraulic – 250 Ton. BOP: 11” x 5M Shaffer annular – 11” x 5M Shaffer Double rams. ROTARY TABLE: 22”.ACHIEVEMENT: Develop skills in drilling operations, ensuring that all operations are carried out in accordance with the schedule; supervising the crew, responsible for general rig setup, maintenance, testing and connection/disconnection of BOP equipment, equipment and casing installation
-
Parker Drilling Company
-
Colombia
-
Tour Pusher
-
May 2011 - Dec 2011
-
Colombia
Rig 2500 HP: SUBSTRUCTURE: Pyramid. MAST PYRA MID. 117 tf x 1,250,000 lbs with 14 lines 1 ½” MUD PUMPS: National FB 1600 Triplex pumps. TOP DRIVE: Canrig 1275 – 1,150 HP 750 Ton. BOP: 13 5/8” 5M Hydraulic – 13 5/8” 10 M Double ram – 13 5/8” 10M single.ACHIEVEMENT: Management of drilling activities and extreme care of the environment.
-
Lewis Energy Group
-
Colombia
-
Rig Manager
-
Nov 2010 - Mar 2011
-
Colombia
Rig 550 HP MAST: 112 ft x 300.000 lbs 4 ½” DP 7,000 ft SUBSTRUCTURE: 116 FT 550,000 LBS. DRAWWORK: Care Industries setback 550,000 lbs MUD PUMPS: Tulsa triplex TT 680 – 650 HP. BOP: 11” X3M Shaffer annular, 11” x 5M Single gate.ACHIEVEMENT: I obtained the necessary certifications to fulfill this position: First Aid, WHIMIS (Worker Health Industrial Management Information System), specialized safety training, such as fall protection and height rescue.Specialized safety training, like fall protection and rescue at heights.
-
Caroil Drilling Division
-
República Democrática del Congo
-
Rig manager
-
Oct 2009 - Oct 2010
-
República Democrática del Congo
RIG 55O HP SAME CHARACTERISTIC.ACHIEVEMENT: Interact with Gabonese culture and staff effectively meeting project objectives.
-
Parker Drilling Company
-
Turkmenistán
-
Tour Pusher & Driller
-
Jun 2004 - Jun 2009
-
Turkmenistán
RIG 3000 HP: TOP DRIVE TDS 4. SUBSTRUCTURE: Pyramid – Floor Height 39 ft set back 620,000 lbs MAST: 155 ft capacity 1300.000 lbs DP 5 ½” ROTARY TABLE: 37"ACHIEVEMENT: I moved up in the team to serve the Turkish operator Calik Energy in Turkmenistan for 5 years.
-
BJ Services
-
Colombia
-
Helper Coiled Tubing
-
Apr 2003 - Dec 2003
-
Colombia
COILED TUBING.ACHIEVEMENT: Assist engineers in Coiled tubing acquiring knowledge of well stimulation.
-
Parker Drilling Company
-
Colombia
-
Driller -Derrickman - Floor hand - Sample Catcher
-
Dec 1989 - May 2002
-
Colombia
RIG 3000 HP SAME CHARACTERISTIC.ACHIEVEMENT: Beginning of my working life in the hydrocarbon industry, acquiring promotions within the company.
-
-
Education
-
Colegio nacional Santa Librada
Bachiller academico
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Oil and Gas”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community