See How Many Clients You're Missing Each Month

Simply enter your business email & Topline AI Agent will show you.

Bio

Generated by
Topline AI

Experience

  • ALAUSAT
    • Madrid y alrededores
    • Senior Process Engineer / Hydrogen Division
      • Feb 2022 - Present
      • Madrid y alrededores

      Responsible for determining the process, equipment and surface facilities for obtaining clean on-shore and off-shore hydrogen in the most technically and economically efficient way.ACHIEVEMENTS:2022: Ammonia plant capacity 3400 MTD with nitrogen and hydrogen generated with photovoltaic and wind power - Feasibility (FEL-1 & 2), Morocco - North Africa.

    • Venezuela
    • Oil and Gas
    • 700 & Above Employee
    • Cryogenic Complex Liaison Manager
      • Apr 2014 - Sep 2019

      Processes engineering advisor and operations technical liaison for the review of the projects of new NGL recovery facilities, process improvements to existing LPG fractionation plants and updates of the operating procedures.ACHIEVEMENTS:2015: Gas conditioning and sweetening plants with membranes and amines for the gas supply to Colombia - Feasibility (FEL-1), Maracaibo - Venezuela

    • Gas Processing Manager
      • Jan 2010 - Apr 2014

      In charge of the operations of the large-scale offshore NGL recovery facilities with mechanical refrigeration with propane and the onshore LPG fractionation and distribution of 50,000 BPD, directing 250 operators and engineers.ACHIEVEMENTS:2013: Small-scale LGN extraction plants for joint ventures on the West Coast of the Maracaibo Lake - Feasibility (FEL-1), Maracaibo - Venezuela

    • Infrastructure and Processes Manager
      • 2006 - 2010

      In charge of the process improvements and the implementation of new gas compression and NGL recovery infrastructure, according to the requirements of the business plans and the evaluations of the facilities, directing 150 project engineers from different specialties.ACHIEVEMENTS:2008: Tia Juana1 Gas Compression Plant Replacement Project – Start-up, Guarantee tests and Financial closure, Maracaibo Lake – Venezuela

    • Gas Utilization Superintendent
      • 2003 - 2006

      In charge of supervising gas measurement and management facilities to guarantee deliveries of 3,000 MMSCF/day ( 86 Million Std m3/day ) in a safe and reliable manner to the productive sectors according to national and international regulatory requirements.ACHIEVEMENTS:2004: Update of the measurement factors of the gas collection, compression and distribution system, Maracaibo Lake - Venezuela

    • Infrastructure and Process Engineer
      • 1999 - 2003

      Responsible for the basic design and evaluation of improvements and new technologies for NGL recovery and LPG fractionation, as well as on-site support for operations personnel in the management of change and risk assessment of facilities.ACHIEVEMENTS:1999: Improvement in the Gas Dehydration System with Monoethyleneglycol in Lamarliquido NGL Recovery Plant, Maracaibo Lake - Venezuela2001: Gas General Recirculation of NGL Recovery Plant with Turboexpansion in Lama Gas Compression Complex - Feasibility (FEL-1), Maracaibo Lake - Venezuela

    • Gas Engineer
      • 1991 - 1999

      Responsible for the annual performance testing program of the gas compression plants to identify in a timely manner the conditions that limit gas handling capacity, as well as to periodically evaluate the fuel gas conditioning systems to verify the gas quality specifications required by gas turbines.ACHIEVEMENTS:1992: Performance tests and thermodynamic analysis for Solar York, Centaur 40, Mars 90, GE MS-5002 and Westinghouse W-101 gas turbines, Rolls Royce RB-211 and GE LM-2500 gas generators, Ingersoll Rand, Dresser Clark and Nuovo Pignone centrifugal compressors, Maracaibo Lake - Venezuela1993: Start-up and acceptance tests of Gas Dehydrating Plants with Triethyleneglycol in Centro Lago and Tia Juana, Maracaibo Lake - Venezuela1994: Start-up, acceptance and performance tests of Gas Compression Plants Infragas Project in Tia Juana, Maracaibo Lake - Venezuela1996: Improvements Projects in TDC-3000 and Foxboro antisurge control systems of propane refrigeration centrifugal compressors in NGL Recovery Plants in Tia Juana, Maracaibo Lake - Venezuela1997: Start-up, acceptance and performance tests of the Ethane Recovery and Purification Plant Project for Pequiven in Tia Juana, Maracaibo Lake - Venezuela 1998: Start-up, acceptance and performance test of the Refrigerated Absorption Project with Gasoline Recirculation (C5+) at the NGL recovery plant in Tia Juana, Maracaibo Lake - Venezuela

  • Oster de Venezuela S.A
    • Barquisimeto, Lara
    • New Product Project Engineer
      • 1988 - 1991
      • Barquisimeto, Lara

      Responsible for implementing lines of production of new Oster products, studies of time and movements to optimize production, elaboration of technical manuals and manufacturing control of parts and pieces delivered by suppliers.ACHIEVEMENTS:1990: New production lines for Oster Steam Iron and Oster Meat Mill assembly, Barquisimeto - Venezuela1989: New production line with quadriple assembly of Oster Blenders in conveyor belt, Barquisimeto - Venezuela

Education

  • 1995 - 1996
    Universidad Nacional Experimental Francisco de Miranda
    Gas Process Engineering Specialist, Training Degree Program between PDVSA CIED and French Petroleum Institute
  • 1982 - 1988
    Universidad Nacional Experimental Politécnica 'Antonio José de Sucre'​
    Mechanical Engineer, Former Instituto Universitario Politécnico de Barquisimeto

Suggested Services

This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection

Industry Focus. “Engineering Services”

Looking to Create a Custom Project?

Need a custom project? We'll create a solution designed specifically for your project.

Get Started

References

Community

You need to have a working account to view this content. Click here to join now

Similar Profiles