Bio
Experience
-
-
Canada
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
Technical Consultant
-
Jul 2006 - Present
July 2006 to present as Technical Consultant:- Generation of valve technical bid documents for Velan Inc.- Preparing design reports for valves (ball, check, globe and butterfly) for Velan Inc.- Generating and reviewing nuclear designs (calculations and drawings) for Velan Inc.- Generating IOM (installation, operation and maintenance) manual for Velan Inc.- Bid Evaluation. From April 2001 to June 2006:Senior Engineering Manager of metal-seated ball, check, globe and butterfly valves.Responsibilities:- New product development- Improvement to current products- Supervising the design group- Reviewing designs ( calculations and drawings )- Engineering and production interfacing- Generation of design specifications for nuclear valves.- Reviewing customer specifications and technical data- Addressing issues with manufacturing non-conformances - Chairman of the Design Review Board
-
-
Technical Consultant
-
Jul 2006 - Present
-
-
Technical Consultant
-
Jan 2006 - Present
Generation of valve technical bid documents for Velan Inc.Preparing design reports for valves (ball, check, globe and butterfly) for Velan Inc.Generating and reviewing nuclear designs (calculations and drawings) for Velan Inc.Generating IOM (installation, operation and maintenance) manual for Velan Inc.Bid Evaluation.
-
-
Senior Engineering Manager
-
Apr 2001 - Jun 2006
From April 2001 to June 2006:Senior Engineering Manager of metal-seated ball, check, globe and butterfly valves.Responsibilities:- New product development- Improvement to current products- Supervising the design group- Reviewing designs ( calculations and drawings )- Engineering and production interfacing- Generation of design specifications for nuclear valves.- Reviewing customer specifications and technical data- Addressing issues with manufacturing non-conformances - Chairman of the Design Review Board
-
-
Senior Engineering Manager
-
Jan 2001 - Jan 2006
New product developmentImprovement to current productsSupervising the design groupReviewing designs ( calculations and drawings )Engineering and production interfacingGeneration of design specifications for nuclear valves.Reviewing customer specifications and technical dataAddressing issues with...
-
-
Engineering Manager
-
Jan 1988 - Jan 2001
Manager of Engineering (design and production of valves)Preparing valve component manufacturing and layout drawingsPreparing designs (calculations and drawings) Generating design, seismic and environmental qualification reports for nuclear ball valve assembliesReviewing ASME Code and Addendas to ...
-
-
Senior Engineer
-
Jan 1983 - Jan 1988
Design of industrial and power plant systemsReview and modification of systemsDesign of pressure vessels and pipingPreparation of P&ID (Process and Instrumentation Diagrams) and specifications of equipment (pumps, compressors, heat exchangers, valves)Writing technical reports (e.g. bid evalua...
-
-
Senior Design Engineer
-
Jan 1982 - Jan 1983
Responsibilities included:Selection and application of materialsDefining the scope of design and the stipulation of design parameters and the applicable Code and Standards Resolving construction technical problems of Callaway Nuclear Power Plant, Missouri.
-
-
Senior Mechanical Engineer
-
Jan 1981 - Jan 1982
2 nuclear power plants each of 1300MW for Washington Pubic Power Supply System (WPPSS) Responsible for :Preparing budget and construction drawings.Resolving construction non-conformance problemsScheduling construction packages and supervising and training technical personnelLiasing between custom...
-
-
Senior Engineer
-
Jan 1980 - Jan 1981
Responsible for :Selection and sizing of equipment (valves, pumps, compressors, heat exchangers and draft fans)Preparation of specifications for power plant system components (valves, pumps, compressors, heat exchangers and draft fans)Reviewing designs and drawings (including calculations and lay...
-
-
Senior Engineer
-
Jan 1977 - Jan 1980
for GhanaPlant layout and detailed piping designSelection and sizing of plant equipment (hydraulic propeller turbine, pumps, valves, air compressors, cooling fans, HVAC )Cost estimating of plant systemsPreparing specifications for equipment for biddingBid evaluation and technical reportAlso perf...
-
-
Mechanical Engineer
-
Jan 1975 - Jan 1977
Mining and metal operation.Thermal system design calculationsPreparation of process and control drawingsReview of supplier drawings and welding procedureSelection and sizing of pumps, compressors, valves and heat exchangersPreparation of specifications for selected and sized equipmentCompiling Bi...
-
-
Mechanical Engineer
-
Jan 1973 - Jan 1975
Thermal fossil power plant designDetail design calculation of piping system based on system heat balanceStress and flexural analysis of piping systemPreparation of process and instumentation drawings (P&ID)Compiling Bill Of Materials (BOM)Bid evaluation and technical report
-
-
Assistant Mechanical Engineer
-
Jan 1967 - Jan 1969
General maintenance of the mechnical equipment of the Akosombo hydro-electric power plant (approximately 1000MW total output), including but not limited to the following : hydraulic turbines and governors (Woodward type), wicket gates, servo-motors, centrifugal and positive displacement pumps, st...
-
-
Education
-
1970 - 1971Columbia University - Fu Foundation School of Engineering and Applied Sc...
-
Columbia University
-
University of Science and Technology, Ghana
-
University of Toronto
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Industrial Machinery Manufacturing”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community