Bio
Experience
-
Global Tunnelling Experts
-
United Kingdom
-
Shaft Sinker/ Miner
-
Jan 2021 - Present
-
United Kingdom
-
-
-
SSGC Ltd
-
United Kingdom
-
Security Officer
-
Sep 2020 - Jan 2021
-
United Kingdom
test & trace security at Doncaster airport
-
-
-
Global Tunnelling Experts
-
Rotterdam, South Holland, Netherlands
-
TBM/Yard Foreman
-
Aug 2019 - Mar 2020
-
Rotterdam, South Holland, Netherlands
10.94 Diameter mix shield 2.1km twin tunnels all aspects to supply & support the TBM
-
-
-
Cable Telecommunications Training Services Ltd
-
United Kingdom
-
General Laborer
-
Jun 2018 - Aug 2019
-
United Kingdom
warehouse general labourers duties
-
-
-
Global Tunnelling Experts
-
Ismailia Governorate, Egypt
-
Tbm shift Boss
-
Sep 2016 - Apr 2017
-
Ismailia Governorate, Egypt
Tbm s-960 Slurry mixshield day today running of this 13m diameter drove 1.8km
-
-
-
Marti Construction SA
-
Tau, Rogaland, Norway
-
Chargehand
-
Mar 2016 - Jun 2016
-
Tau, Rogaland, Norway
Frost Mebrane installation
-
-
-
Global Tunnelling Experts
-
Doha, Qatar
-
Tunnel Superintendant
-
May 2015 - Nov 2015
-
Doha, Qatar
Greenline 845 Al -Messila metro Doha
-
-
-
WELDRICKS PHARMACY LIMITED
-
United Kingdom
-
Warehouse Operative
-
Apr 2014 - May 2015
-
United Kingdom
NVQ 1 in warehouse/delivery driver
-
-
-
iPS - Powerful People
-
Sweden
-
Grout/Drilling/concrete Foreman
-
Jul 2010 - Dec 2013
-
Sweden
day today running of the Drilling triple boom atlas copco hanny grout system ,swing pumps concrete, pea gravel pumps. Installation of first membrane in twin 8km. 10m diameter tunnels
-
-
-
Leighton Asia
-
Hong Kong SAR
-
Pipelaying Barge Superintendent
-
Oct 2008 - Mar 2009
-
Hong Kong SAR
oversee the Build of Leighton pipe laying Barge off shore.
-
-
-
Leighton Asia
-
Hong Kong SAR
-
Tunnel Foreman
-
May 2006 - Jul 2008
-
Hong Kong SAR
link-200 production Foreman 1.1km twin tunnels. Herrenknect mixed shield
-
-
-
WH-STEC-AM JV
-
Singapore
-
Tunnel Superintendent
-
Oct 2005 - Apr 2006
-
Singapore
oversee the build & Launch of two 6.6m diameter Slurry Herrenknect mix shield Slurry TBM con.855
-
-
-
Dragages Hong Kong Ltd
-
Hong Kong SAR
-
Tunnel Foreman
-
Apr 2004 - Jun 2005
-
Hong Kong SAR
Foreman all tunnel aspects 3.2km Robbins Gripper /Hard rock
-
-
-
China Harbour Engineering Company Ltd. Americas Division
-
Hong Kong SAR
-
Shaft/Tunnel Foreman
-
Oct 2001 - Oct 2004
-
Hong Kong SAR
Shaft/Tunnel foreman 1.45km Segment lines Tunnel S158 mixed shield Slurry.
-
-
-
Skanska international AB
-
Hong Kong SAR
-
Shaft/tunnel Foreman
-
Aug 1995 - Jul 2001
-
Hong Kong SAR
Shaft/Tunnel foreman 3.5km tunnels hard rock Robbins Tbm
-
-
-
Frith Specialist mining
-
Hong Kong SAR
-
Shaft Supervisor
-
1995 - 1995
-
Hong Kong SAR
Responsible for all site activities of Seven 8m shafts 150m deep for DSDS Hong Kong
-
-
-
Cementation/Tyhssens/MESL
-
United Kingdom
-
Banksman/Onsetter/Sinker/Shaftsman/miner
-
1982 - 1995
-
United Kingdom
All aspects of shaft Sinking up to a 1000m , Maltby, Darfield, Ashfordby, Harworth + furnishing.Shaft strip of many pit all over the uk and plug & fill . Tunnel headings at various pits drill/blast & various road headers . high pressure grouting
-
-
-
Cape Insulation
-
United Kingdom
-
General Laborer
-
1983 - 1985
-
United Kingdom
mostly power stations
-
-
-
-
command vehicle driver operator
-
Sep 1977 - Nov 1982
-
-
Education
-
1972 - 1977INTAKE HIGH SCHOOL
o level control tech.
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Staffing and Recruiting”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community