Bio
Experience
-
Momentum Engineering
-
Perth, Western Australia, Australia
-
Process Discipline Lead
-
Jan 2021 - Present
-
Perth, Western Australia, Australia
-
-
-
Worley
-
BP Refinery Kwinana
-
Senior Process Engineer
-
Sep 2018 - Dec 2021
-
BP Refinery Kwinana
-
-
-
AMEC/ AmecFW / WorleyParsons
-
Aberdeen, United Kingdom
-
Senior Process Engineer
-
Mar 2011 - Dec 2017
-
Aberdeen, United Kingdom
BP Contract: Claire Ridge Offshore Platform Hook-up / Commissioning Project: BP Contract - MEOR Safety Modifications Project:Preparing / Checking Calculations (Depressurisation Utility Calculations using Hysys, PSV Sizing, etc), Linelist, Datasheets, PFDs, Technical Notes, Operating Manuals, etc. CTR Estimation and Management.Repsol Sinopec Resources UK Contract:P&ID Development, Preparing / Checking Calculations, Linelist, Datasheets, PFDs, Technical Notes, Operating Manuals, HAZOP Attendance, etc. CTR (Cost Time & Resource) Estimation and Management.BP ETAP ALQ Project:P&ID Development, Preparing / Checking Calculations, Linelist, Datasheets, PFDs, Technical Notes, Operating Manuals, etc. CTR Estimation.BG Group Contract:Lomond / Everest Platform Fiscal Metering Upgrade: Detailed DesignManaging a team of engineers to deliver the design of a new Condensate Export Metering / Sampling System on Lomond / Everest Platform. Also to replace the existing gas analysers on the Gas Export Metering System.Open Drains Caisson Removal and Reinstatement: FEED & Detailed DesignVARG Gas Export Project: FEED & Detailed DesignBlowdown System evaluation (Blowdown orifice adequacy check), PSVs adequacy check, Separation System evaluation (Capacity check), Condensate Export System Evaluation (Booster and Export Pumps adequacy check), Compression System Evaluation (Booster and Export Compressors adequacy check), Simulation using HYSYS, Relief and Blowdown calculations using HYSYS Dynamics, Cause & Effects Preparation.Everest East Expansion Project (Subsea Tie-back): FEED & Detailed DesignProcess Simulation using HYSYS, Relief and Blowdown calculations using HYSYS Dynamics, PFD Development, P&ID Development, Cause & Effects Preparation, Heat and material balance, equipment/line sizing, blowdown line restriction orifices, equipment/line list preparation. Writing up calculation/technical notes as well as process design reports/philosophies.
-
-
-
GL Noble Denton
-
Loughborough, United Kingdom
-
Senior Process Engineer
-
May 2010 - Mar 2011
-
Loughborough, United Kingdom
Key Responsibilities:Lead and provided technical support on the reliability and availability of gas facilities.Conducted RAM (Reliability, Availability and Maintainability) Studies using RAM modelling software, OPTAGON.Attended Engineering and Technical meetings with ClientsFacilities site visit to assess processes and gather data for the purpose of process improvement.Achievements:Conducted the production and operational availability assessments of the LNG liquefaction and export systems for the National Grid Glenmavis and Avonmouth LNG storage facilities, identified problem areas that needed upgrade to improve the overall plant reliability and availability.Provided technical support in assessing the production performance of the Talisman Claymore Oil and Gas production facility.Provided engineering support towards the completion of the Cash & Maple Floating LNG FPSO (PTTEP) Pre-FEED project.
-
-
-
Ingen Ideas Limited
-
Aberdeen, United Kingdom
-
Process Engineer
-
Jun 2007 - Sep 2009
-
Aberdeen, United Kingdom
Triton FPSO Evaluation Project (Amerada Hess): Operations Support:Burghley Field Development (Talisman Energy): Flow Assurance:Shell Global Solutions (Secondment) January 2008 – June 2008 Fateh Field CO2 EOR Project (Dubai Petroleum): Pre-FEEDDuties included: Process Simulation using UNISIM/HYSYS, PFD Development, Heat and material balance, equipment/line sizing, rating and specification (production separators, scrubbers, hydrocyclones, pumps), equipment list preparation (Wellhead platforms and central processing facilities), Production chemical distribution and Umbilical size estimate, Writing up calculation/technical notes as well as the process concept report.Buzzard Project (Nexen Petroleum)Carried out a flow assurance analysis for installing an alternative export pipeline routing to an STL/FSO on the Buzzard Field.
-
-
Education
-
2003 - 2006Chalmers University of Technology
Master of Science - MS, Environmentally Sustainable Process Engineering -
1995 - 2000University of Benin
Bachelor of Engineering - BE, Chemical Engineering
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Oil and Gas”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community