Bio
Credentials
-
Autodesk Revit Certified Professional Certification
CAD CenterJun, 2021- Apr, 2026 -
Navisworks
CAD CenterJun, 2021- Apr, 2026 -
Contractual Matters
Local Initiatives Support Corporation (LISC)Jun, 2008- Apr, 2026 -
•In-house Voltas Training on Managing People
Voltas International Operations Business Group ( IOBG) -
•SAP Training
SAP -
ERP Training
ERP
Experience
-
EMSQUARE Engineering Consultants
-
Dubai, United Arab Emirates
-
Senior Engineer –MEP | Project Supervision
-
Jan 2022 - Present
-
Dubai, United Arab Emirates
Working with one of the leading Principal Consultant Company, in Dubai, UAE. Operating under the Director’s Office umbrella for Day-to Day Multi-Projects Monitoring & Tracking, Contract Management, Authority Coordination & Approvals, Productivity Monitoring & Tracking, Projects Coordination & Management with Stakeholders until handover including Complete Close Out Documentation and final account determination with client.• Projects: G+2P+8 +R Residential Building at Satwa for Mr. Ahmed Khalaf Ahmed AL HabtoorB+G+7F+R Commercial & Residential Building at Al Barsha South, for M/s. Takmeel Real Estate Development LLCB+G+2+Roof Commercial Building at Al Barsha South, for Mr Ashok Kumar Shantilal DoshiG+4P+14+R Commercial & Residential Building at JVC, for M/s.Imtiyaz DevelopersG+7+Roof Residential Building at Dubai Silicon Oasis, Dubai for M/s. Altis One Limited G+4P+15+R Commercial & Residential Building at JVC, for M/s. Imtiyaz Developers
-
-
-
-
MEP Manager
-
Apr 2016 - Jul 2021
-
Dubai
In this role, I direct wide variety of Mechanical, HVAC,Electrical/Lighting/Lighting Control, Plumbing, Fire alarm/Firefighting, IT/AV, Security, Structured Cabling, Low current,LPG disciples; developing project scope, collaborating with business users to outline requirements, and ensure on-time delivery within budget in order to meet company /Client goals.Key achievements include; • Accomplishing and commissioning JAFZA Convention Centre Complex (1.9B AED) project (Expect Hotel) in phase wise manner after being on hold for four years. • Acquiring and demonstrating considerable knowledge of MEP construction practices and procedures related to facilities or construction as required.• Complete Close Out Documentation and final account determination with client.
-
-
-
Sobha Engineering & Contracting LLC
-
Dubai, United Arab Emirates
-
Project Manager: MEP
-
Dec 2012 - Feb 2016
-
Dubai, United Arab Emirates
My role as Project Manager: MEP required me to assign project resources, prepare and control budgets, monitor progress and provide detailed plans, and identify project risks and issues, including strategic planning and requirements gathering.Key achievements include;• Led and implemented projects across multiple sites with prevailing industry standards/quality systems efficiently, promptly, and cost-effectively. • Prepared QAQC produedures, PQR/BPS/QCIP and Various Other documents for the MEP department.● Projects:o Sobha Hartland School 1 (-MEP-30M AED) o Meydan Height Villas, Dubai (MEP-65M AED)o MEP Works for Crystal Lagoon, Show Village, MBR City o Enabling Works for Cycle Track in MRC 1o Al Fathan Crystal Tower (Twin Tower-Hotel/Service Apartment)
-
-
-
Voltas Limited
-
Abu Dhabi, United Arab Emirates
-
Project Manager -Plumbing & Fire Fighting
-
Apr 2009 - Nov 2012
-
Abu Dhabi, United Arab Emirates
While serving as Project Manager, I conducted site/project inspections against project drawings and site/construction plans and produced reports for senior managers, including supervising material submittal, quantity take-off, request of material, procurement, and material delivery. Key achievements include;• Led design, project supervision, scheduling, and target monitoring to achieve end results.• Successfully executed projects such as Central Market(tallest tower in Abu Dhabi• Being recognized as first person from project team to actively work in SAP computer environment for material requisition and procurement.• Playing essential role during tendering processes for projects.● Projects: o Central Market Development, Abu Dhabi (MEP-650M AED)o Ferrari Experience (world), Abu Dhabi (MEP-550M AED) – Design and Built
-
-
-
WSP - Asia Pacific
-
Dubai,UAE
-
Public Health Engineer
-
Sep 2008 - Feb 2009
-
Dubai,UAE
Major Projects• Detail Design of 2B+G+44 Res. Tower at Burj Dubai (Client: Emmar, Architect: Aedas)• Detail Deign of 3B+G+P+9 Luxury Hotel Tower at Bahrain Bay (Architect: Tilka)• Scheme Design of 2B+G+P+8/13 Res Towers (5 nos.) at Dubai Festival City (Architect: BKA)• Concept / Scheme Design of 3B+G+M+P+24/54 Res Tower at Dubai Water Front (Client: Al Farra Properties, Dubai, Architect: JHRP)Key Result Areas • Drafted concept, scheme & detailed design of drainage, water supply, LP gas, solar/electrical centralized hot water generation including preparation of specifications & reports of high rise building, luxury hotels, malls till final submission of tender & IFC• Involved in planning, coordination & assigning work schedule for Junior Engineers, CAD personnel• Attended design meeting/workshops with client representatives, architects, structural & other related departments for successful completion of design as per client’s request & requirements to meet the project budget• Ensured preparation & approval of DM/DEWA/partly CDA
-
-
-
Bilt Middle East LLC
-
Dubai,UAE
-
Senior Engineer- Plumbing & Fire Fighting
-
Jan 2001 - Aug 2008
-
Dubai,UAE
Major Projects• Emirates Park Tower Hotel; Archon; 75 Million (Plumbing)• Groversor Hotel Phase II; Archon; 25 Million (Plumbing)• Jumeriah Al Khor Hotel; RMJM; 37 Million (Plumbing)• Dubai World Trade Center; Turner/Hyder; 35 Million (Plumbing)• Truck & Service Tunnel; Maunsel; 15 Million (Plumbing)• Golf Tower Iⅈ K&A/NEB; 12/17 Million (Plumbing)• Knowledge Village, Phase2&3; DAR; 7/12 Million (Plumbing)• Burj Dubai Devl, Old Town, Phase 1&2; DSA/Al Burj; 12/17 Million• Design & Built of 3 Nos. 34/38 Res. Tower, JLT; Archon; 25 Million (Plumbing)• DIFC-Gate Precinct -6 Bldg.; Turner/RMJM/Halcrow; 19 Million• Marina Tower, Dubai Marina; Norr; 15 Million (Plumbing)• Al Bassam Tower; WSA; 10 Million (Plumbing)• Arabian Ranches Devlp.-829 villas; SPP; 21 Million (Plumbing)• 3B+G+45 Hotel & Service Apartment at Dubai Marina; Archon; 12 MillionKey Result Areas • Facilitated project department/execution after award of tender by preparing selection of material, LOI & POs of material, material submittal, follow-up of material as per project requirement and show/as-built drawing• Led the techno commercial team for on time installation on site • Carried out technical evaluation and reviewed progress & technical meeting• Closely reviewed quantity take-off with quantity surveyors • Conducted value engineering to meet project budget• Prepared design of plumbing, drainage, firefighting• Developed bill of quantities, comparative statements, job cost analysis, estimation of man-days/ labour estimate, supervision estimate and prelim’s cost
-
-
-
ETA MNE
-
Dubai, UAE
-
Estimation Engineer- Plumbing & Fire Fighting
-
Oct 1998 - Nov 2000
-
Dubai, UAE
Place of Work : Head office, DubaiDuties & Responsibilities: *Calculation of Bill of Quantities from Tender Drawing*Raising Tender Query* Enquiry preparation, Follow-up, Comparative statements*Cost Estimate; Estimation of Man-Days and related requirements for completion of Tender
-
-
-
Larsen & Toubro
-
Managolore, India
-
Engineer-Mechanical
-
Jan 1995 - Sep 1998
-
Managolore, India
Place of Work: Mangalore Refinery & Petrochemical Ltd ,Phase II, IndiaDuties & Responsibilities: *Planning & Coordination & Supervision of all activates connected with Erection & alignment of Rotary & Static Equipment's*Inspection of equipment layout & equipment's as per drawing* Preparation of Erection scheme for critical & heavy equipment's
-
-
-
Golden Agro-Tech Industries Ltd, Kakinada, India
-
Kakinada Area, India
-
Mechanical Engineer
-
Sep 1991 - Dec 1994
-
Kakinada Area, India
*Basic Engineering-Preparation of individual layouts, approval of vendor drawing *Procurement-Scrutinizing, preparing of comparative statements* Piping layout-Preparing piping layouts & isometric drawing, bill of Quantity, data sheets*Project Erection-Temporary & permanent works, Fabrication of MS&SS storage tanks, Floating tanks, Boilers, Air Handling units, Hydrogen & Air Compressors, Chilling plants, Water Sand Filters, DM plant, Waste Treatment plant, pumps etc*Commissioning & Maintenance
-
-
Education
-
1987 - 1991Padmabhushan Vasantraodada Patil Institute Of Technology
Bachelor's Degree, Mechanical Engineering -
1983 - 1987Col D S Raju Polytechnic
Diploma in mechanical Engineering (LME), Mechanical Engineering -
1973 - 1983Gandhi centanarty School,Kakinada, Andhra Pradesh
SSLC, General Science, Maths
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. Add an industry
Need a custom project? We'll create a solution designed specifically for your project.
References
Community