See How Many Clients You're Missing Each Month

Simply enter your business email & Topline AI Agent will show you.

Bio

Generated by
Topline AI
Hossein Merajian is a seasoned electrical engineer with 20+ years of experience in power systems, commissioning, and control systems design. He has worked on various projects, including desalination plants, refineries, and power plants, and holds a Master of Science degree in Electrical and Electronics Engineering from Amirkabir University of Technology. He has expertise in ETAP software, electrical network analysis, and power system simulation, and has worked in various roles, including Senior Electrical Design Engineer, Electrical Engineer, and Electrical Engineer.

Experience

  • FSTCO.
    • Tehran - Iran
    • Senior Electrical Design Engineer
      • Feb 2010 - Present
      • Tehran - Iran

      Following activities in Concentrate Plant (SISCO,ZISCO projects) and their expansion lines (EPC), KSP concentrate plant in SANGAN provinence (EPC), Sechahoon pelletizing plant in bargh yazd province, kharameh pelletizing plant in shiraz provinc, and also GCP plant (EPC):1- Design and Checking of electrical network study (by ETAP software) in basic and detail design.2- Design and preparing all electrical documents such as Electrical Load List, Single Line Diagrams, Electrical equipment data sheets (power and distribution transformers, MV and LV switchgears, Cable Sizing, Charger and UPS sizing, VFD, and etc.), 3- Study of network in order to preparing relay coordination and setting by ETAP software.4- Checking, verification, and TBE preparation of vendor data/documents.5- Prepare all Requisition/MTO in order to bid and Vendor selection6- VDR and TQ before development of TBE 7- Make engineering calculations in connection with field and office assignments.8- Ensure compliance with safety requirements and standards procedures.9- Comply project design within procedures and client specifications(i.e. Change the load schedule template based DEP requirement for all the company)

  • Kitec
    • Tehran - Iran
    • Electrical Design Engineer
      • 2008 - 2010
      • Tehran - Iran

      Following activities in Expansion of desalting plant of MARUN 2&6, PREHEATER OF AHWAZ 1,2,3,4 Desalting units, PVC 1&2 ARVAND Petrochemical cooling tower system, and CHESHMEH KHOSH Oil field development.1. Cooperate in design and produced these documents: a- Technical Specification and data sheets for Electrical Equipments. b- Earthing, Lightning, and Lighting Calculation and Cable Sizing. c- Electrical load list and Motor List as required at any of those projects.2. Checks that all Electrical material classes are correctly marked and suitability installed for hazardous areas.3. Attending to availability of specification, drawings and assisting the discipline supervisor in the case of design changes or additions, that they become necessary, involving the home office.4. Contributing to the feasibility analysis of the scheduled work and checking on the availability of the necessary material.5. Prepare Material Take off (MTO) for Electrical Equipments according to project requirements.6. Cooperate in preparing sketches, drawings, work orders, and other information for job to beperformed (main & secondary route, connection diagram, and matching of vendor package drawingswith project drawings.

    • Electrical Engineer
      • Mar 2006 - Dec 2007
      • Tehran, Iran

      Project:Study of a Gas Turbine Power Plant and connecting it to 63/20kV substation in 20 kV level.Duties:-Study of connection of power plant to existing substation.-Design review of 20kV Switchgear and connecting it to 63/20kV substation.-Design of all LV Switchgear (Forwarding pump station, lighting, auxiliary).-Power system analytical studies including load flow & short circuit.-Review and approval of power plant grounding system according to IEEE Std 80-2000.-Review of all basic design and specification documents for all electrical equipments.-Sizing of transformers(4 units,11/20kV and 2 units, 20/.4kV), diesel generator(one set,0.4kV).-Review and approval of lightning protection system according to NFC17-102.-Study of generator electrical characteristics.

    • Electrical Engineer
      • Sep 2005 - Feb 2006
      • Tehran - Iran

      Responsibility of following activities in BANDAR ABBAS REFINERY Project:1. Redesign of LV and MV substations.2. Analysis of Electrical Network by PASHA software (in-house software).

    • Electrical Engineer
      • 2004 - 2006
      • Tehran - Iran

      Power system study for AZARBAYEJAN - IRAN network: - Design and simulation of load forecasting, load flow, and transient stability analysis.

Education

  • 2002 - 2005
    Amirkabir University of Technology - Tehran Polytechnic
    Master of Science (M.Sc.), Electrical and Electronics Engineering
  • 1998 - 2003
    Amirkabir University of Technology - Tehran Polytechnic
    Bachelor Degree (B.S.), Electrical and Electronics, Power System

Suggested Services

This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection

Industry Focus. “Oil, Gas, and Mining”

Looking to Create a Custom Project?

Need a custom project? We'll create a solution designed specifically for your project.

Get Started

References

Social Profiles

Community

You need to have a working account to view this content. Click here to join now

Similar Profiles