Bio
Credentials
-
ETAP 113
ETAP Canada Ltd.Feb, 2019- Apr, 2026
Experience
-
Westport Fuel Systems
-
Vancouver, British Columbia, Canada
-
Electrical & Instrumentation Technologist
-
Nov 2019 - Present
-
Vancouver, British Columbia, Canada
Engine Test and Verification
-
-
-
Ballard Power Systems
-
Burnaby
-
Production Technician
-
Jun 2016 - Feb 2019
-
Burnaby
_ Gaining Canadian experience- Working under pressure in a fast pace manufacturing industry- Adherence to safety regulations- Mentoring junior colleagues
-
-
-
ParsJooyab Consultant
-
Esfahan,IRAN
-
Instrumentation and Control Engineer (contract)
-
Apr 2013 - Mar 2015
-
Esfahan,IRAN
Contract: Design of a new steam utility line from boiler house to the oxygen plant of Mobarakeh Steel ComplexMy responsibility:- Collecting data through frequent site visits- Attending meeting with engineers , control room operators and end-users to clarify and finalize the client requirements- Analyzing the mechanical and instrumentation aspects of the design- Preparing data sheet of a pressure reducing de-superheater 3-port valve (ordered to Samson AG)- Selecting the control system- Preparing P&ID, Instrument List, control narratives and installation diagrams
-
-
-
-
Instrumentation and Control Engineer
-
Jun 2011 - Feb 2014
EPC construction projects : 1) Assaluyeh Gas Refinery, Phases 15-162) Esfahan Oil Refinery3) Mahabad Petrochemical Plant- Part of detailed design team, working both at design office and plant environment- Clarifying client and contractors technical queries (TQ)- Preparing field sketches - Supervising the construction and pre-commissioning work- Supervising instruments calibration- Reviewing vendors' package documents- Coordinating with other engineering disciplines (civil, piping, mechanical, electrical)
-
-
-
Enerchimi Engineering Company
-
Arak Oil refinery
-
Electrical and Instrumentation Engineer
-
Apr 2010 - Jun 2011
-
Arak Oil refinery
Project:-Upgrading & capacity Enhancement of Shazand Arak Refinery(Enhancing the capacity from 160,000 bpd to 240,000 bpd, changing the feed from light to heavy crude).As a member of electrical and instrumentation engineering team , I worked in the construction & pre-commissioning stages of of CDU (Crude Distillation Unit), Instrument air, Naphta, and steam power plant. I was also present in the commissioning of CDU where the main task was undertaken by the refinery personnel.my duties:- Reviewing detailed design- Clarifying client and contractors technical queries (TQ)- Preparing field sketches (AutoCAD)- Supervising the construction and pre-commissioning work- Supervising the installation and test of fibre optic cables - Supervising instruments (P, T, L, F, safety valves, control valves) calibration- Preparing loop check instructions- Reviewing vendors' package documents- Coordinating with other engineering disciplines (civil, piping, mechanical)
-
-
-
ParsJooyab Consultant
-
Esfahan, Iran
-
Electrical and Instrumentation Design Engineer
-
Oct 2004 - Mar 2010
-
Esfahan, Iran
Main Projects:- Zahak water treatment plant, 1000 L/S with a 6x350 KW pump station- Hamadan water treatment plant, 800 L/S- Saman water treatment plant, 850 L/S- Three 6x250 KW pump stations (AS13, PS2, Pichvar), as part of wastewater collection network of Ahwaz (financed by world bank)My duties:- Design, and supervision of installation and commissioning of electrical, instrumentation, control, and communication systems - Developing P&ID- Preparing the E&I drawings (AutoCAD 2004) - PLC programming- Selecting VFDs- Selecting antennas, modems and RTUs for telemetry projects
-
-
-
Informatics Services Corporation
-
ESFAHAN
-
Technical Support Specialist
-
2000 - 2004
-
ESFAHAN
Automation of Banking system in Esfahan province
-
-
-
ASCOTEC Holding GmbH
-
Esfahan Branch
-
Instrumentation Technologist
-
May 1996 - Jun 2000
-
Esfahan Branch
- Reviewing the documents of up to 1000 items (Material Codes) of Instrumentation (P, F, L, Thermocouple, RTD, Actuator, Control Valve, Controller) in the document centre of Mobarakeh Steel Complex (1996: 2,000,000 tons/year)- Surveying the items in the warehouse and verifying data through the nameplates- Specifying similar items, classified in different operational units under different "Material Codes"- Preparing a complete database of instrumentation including data sheets for all items- Specifying 4 alternative vendors (Catalogue and Part Numbers) for each item (Material Code)
-
-
Education
-
2015 - 2016British Columbia Institute of Technology
Motor Control, PLC Programming (I & II), Canadian Electrical Code, AutoCAD 2016 (I&II) -
University of Tehran
Master of Science (M.Sc.), Electrical Engineering -
University of Tehran
Bachelor of Science, Electrical Engineering (Electronics)
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Automotive”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community