See How Many Clients You're Missing Each Month

Simply enter your business email & Topline AI Agent will show you.

Bio

Generated by
Topline AI
Hany Kilany is a seasoned structural engineer with 20+ years of experience in Egypt, providing expertise in construction management, project management, and civil engineering. He holds a Bachelor's degree in Civil Engineering from Cairo University and a Higher Diploma in Construction Management from Cairo University.

Credentials

  • Higher Diploma of construction mgmt 1997
    Cairo University
    May, 1997
    - Apr, 2026

Experience

    • Egypt
    • Architecture and Planning
    • 500 - 600 Employee
    • Resident Engineer
      • Jan 2020 - Present

      1.1. Project: New Giza University (NGU)  Scope of Work: Supervising Civil Works (replacement, waterproofing, backfilling, concrete, slab on grade, cladding and steel skeletons), Architectural Fully Finished, Electromechanical works (MEP), Landscape Infrastructure, Internal roads.1.1.1. NGU- Phase II (From Jul, 2021 till date) Job: Resident Engineer Owner: New Giza for Basic Infrastructure and Educational Service P M: Degla CFM Contractors Construction and Reconstruction Engineering Co.(CRC) El Ofoq (MEP nominated Subcontractor) Energy Contracting Solution (ECS) KONE LLE Project Description:Three buildings with total value (LE 750 M) as following: Building A, Extension of Existing Faculty of Medicine, consists of with total area of 11700 m2 Building includes Anatomy Lab, ICU/ Operation Simulation, 7 Bed ward and clinical skills lab along with educational and office spaces and library.  Building B, Extension of Existing Faculty of Dentistry, consists of with total area of 16780 m2 Building includes simulation labs (130 simulators), Dental clinics (250 Dental Chair) along with educational and office spaces and library. Building C, Utility Building: Including water tank and open back of house areas; with total area approx. 4540 m2 Building D, Faculty of Pharmacology with total area 11900 m2 External Works related to Buildings Courts and Plaza between buildings.1.1.2. NGU- Engineering Building, Infra utilities and Landscape (from Jan 2020 to Jul 2021) Contractors:  Egyptian Union for Construction (El Hazek)  Energy Contracting Solution Dolfina American NGU Self Execution Jedar Project DescriptionSchool of Engineering with BUA7500 m2, 40,000 m2 landscape area (3 play grounds, car parking, pergolas and green areas) and infra utility with total value (LE 220 M)

    • Resident Engineer
      • Nov 2017 - Dec 2019

      • Owner : Babtain Group• Contractor : Rowad Modern Engineering ( RME ) The crew consists of:• 7 seniors engineers (structural, architectural, planning, surveying, mechanical, electrical and QS )• 5 juniors engineers ( 2 structural, architectural, , mechanical, electrical)• DC and secretary.Scope: included Civil (shoring, excavation, replacement, waterproofing, backfilling, concrete, slab on grade, cladding and steel skeletons), Architectural, Electromechanical works (MEP), Landscape Infrastructure, Internal roads, Fence including steel gates and security kiosksBudget: 430,000,000 LEProject Duration: 24 MonthProject Description:Construction of Royal City Open Mall located on 120,000 m2 plot of land within RoyalCity Gated Compound, 26th of July Corridor, EI Sheikh Zayed City, Giza Governorate.The built-up area of the mall is approximately 22,000 square meters on a 120,000 square meters of land. The Mall has a 500-meter long facade facing El Mehwar Road. The landscape and surface parking area is 90,000 square meters.Royal City open Mall consists of a group of buildings ranging between 6, or 8, or 12m

    • Resident Engineer
      • Oct 2016 - Oct 2017

      Organization: Raafat Miller Consulting (rmc) Project : New Giza University (Phase 1 B&C) Owner : New Giza University Contractor : Rowad Modern Engineering ( RME )RMC is the lead consultant of project in association Shaker Group Consultant (SGC) for MEP works and sites international for landscape works.The crew consists of: RE (me), 4 seniors engineers, 4 juniors engineers, surveyor, 2 DCs and secretary for structural, architectural, planning and QS trades. Associated RE, 3 seniors and juniors engineers for MEP works. Associated RE, 1 seniors engineer for landscape works. The part 2 phase 1 of project: consists of smart buildings for faculty of Faculty of Pharmacy and Nursing (11000 m2 ) and Faculty of Business Administration (7500 m2) by cost about (220 million LE) .

    • Resident Engineer
      • Jun 2016 - Oct 2016
      • Cairo

      • Project Name : The Gate• Owner : Abraj Masr• Project Manager: Hill International• Contractor : Industrial Construction and Engineering Company (SIAC)DEC is the lead consultant of project.The crew consists of:RE (me), ARE, 2 QS Engineers, 4 Project T.O Engineers (Architectural, Structural, Mechanical and Electrical), 8 Site Engineers (Architectural, Structural, Mechanical and Electrical), 2 DCs/secretary.• The Gate is the first of its kind sustainable multi-use complex in Egypt, The main objective behind the cutting edge urban development is raise awareness about sustainable architecture designed to fight global warming and maintain an eco-friendly global environment and to create a sustainable landmark.• The Gate strategically located in Al Nozha Street, in the heart of Heliopolis District, Cairo. The site enjoys strong connections to Cairo Airport and main Cairo Arteries. • The Gate provide 1227 residential apartments having variety of 1 bed room, 2 bed rooms, 3 bed rooms, Duplex, Studio, Sky Villas starting from the 1st floor till the 9th floor and 10216 square meter total area of offices and 10713 square meter total area of clinics and provide also 95440 square meter as commercial & mall area through basement 2 partially, basement 1,Ground and mezzanine. • The concept design was done by Vincent Callebaut Architectures, Paris and the design has been developed and enhanced by Dimensions Engineering Consultants as a lead consultant for the project.

    • Resident Engineer
      • Nov 2014 - May 2016
      • 6th October - Egypt

      Organization: Raafat Miller Consulting (rmc) Project : New Giza University (Phase 1 A,B &C) ) Owner : New Giza University Contractor : Rowad Modern Engineering ( RME )RMC is the lead consultant of project in association Shaker Group Consultant (SGC) for MEP works and sites international for landscape works.The crew consists of: RE (me), 4 seniors engineers, 4 juniors engineers, surveyor, 2 DCs and secretary for structural, architectural, planning and QS trades. Associated RE, 3 seniors and juniors engineers for MEP works. Associated RE, 1 seniors engineer for landscape works. The first phase of project: consists of smart building for faculty of medicine (5200 m2 foot print), Utility building (1000 m2 foot print) and RMU by cost about (175 million LE) . The second phase of project: consists of smart buildings for faculty of Faculty of Pharmacy and Nursing (3200 m2 foot print) and Faculty of Business Administration (2200 m2 foot print) by cost about (220 million LE) .

    • Resident Engineer
      • Apr 2012 - Oct 2014
      • 6th October City

      Palm Hills Golf Extension

  • ECG
    • El Rehab - New Cairo - Egypt
    • Structural Tech Office Manager
      • Nov 2008 - Mar 2012
      • El Rehab - New Cairo - Egypt

      El Rehab 2 Senior Site Structural Technical Office EngineerPalm Hills Structural Tech office Manager

    • Senior Structural Designer
      • Jul 2002 - Oct 2008

      Designing the ministry's project using (Auto Cad – Sap 2000 – Etabs – MS Office – Utility Programs as PC group – C beams …. Etc.)Schools and institutional buildings for all pre university educational stages :Complex Schools type including 48 classrooms 3 stories with area of 2475 m2/story.Secondary Schools type including 26 classrooms – 3stroy with area of 1750m2/story Prep and preliminary Schools type including 28 classroomsSecondary Schools type including 24 classrooms – 4stroy with area of 1000m2/storyMulti-stage Schools type including 9 classrooms• For all types there is adjacent steel structure shed.• All types designed twice :o (Slabs and beams) for earthquake resistant (2B type).o HBS for non-resistant.Administration Buildings :Aljouf-Skaka Education Department. It is a complex building with Area of 3575 m2 building peppered spaces covered with glass c

    • Senior Technical Office
      • Mar 1995 - Jun 2002
      • New Police Academy

      Quantity Surveying ReviewingInterim payment ReviewingReviewing Shop drawingStructural redesign and coordination with other trades

  • General Company for Landreclamation
    • Bustan 3 at km 117 Alexandria-Cairo road
    • Site Engineer
      • Sep 1990 - Aug 1995
      • Bustan 3 at km 117 Alexandria-Cairo road

      The project is a residential compound containing equal areas for buildings four berm levels and Roads with total length of 31 kms.Work description: Creating berm levels and fixing soil with stepped pitching. Constructing Roads. Grading building areas and fix them by silt clay layer. Constructing stepped pitching. Apply 5cm Asphalt layer ( 500,000 m2) Submit Q.S takeoff for all items. Submit interim payments. The project Constructing ( 2 ) Villages including 1000 farmer houses and service building ( 4 residential building 4 stories , 2 mosques , 2 stores , 1 Schools and 2 Administration Buildings and internal base roads) . 4 main open irrigation water channels. 12 small bridges with 8m spans. Asphalt Roads at banks of channels

Education

  • 1985 - 1990
    Cairo University
    Bachelor's degree, Engineering
  • 1985 - 1990
    جامعة القاهرة
    بكالوريوس هندسة مدنية, Civil Engineering

Suggested Services

This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection

Industry Focus. “Architecture and Planning”

Looking to Create a Custom Project?

Need a custom project? We'll create a solution designed specifically for your project.

Get Started

References

Social Profiles

Community

You need to have a working account to view this content. Click here to join now

Similar Profiles