See How Many Clients You're Missing Each Month

Simply enter your business email & Topline AI Agent will show you.

Bio

Generated by
Topline AI
Graham Brennen is a seasoned project engineer with extensive experience in piping, engineering, and construction. He has worked on various high-profile projects, including the Cape Preston Berthing Frames Installation, MWPA Navigation Channel Beacon Top Section Replacement, and the BHP Wharf Remediation Project. Brennen has held senior roles, such as Project Engineer and Civil Supervisor, and has demonstrated expertise in procurement, commissioning, and project management. His skills in Autocad, Factory, and structural engineering are complemented by his proficiency in languages and certifications.

Experience

  • Total AMS - Part of the TAMS Group
    • Based In Fremantle during Design and On Site during Installation
    • Project Engineer
      • Aug 2021 - May 2023
      • Based In Fremantle during Design and On Site during Installation

      Cape Preston Berthing Frames InstallationMWPA Navigation Channel Beacon Top Section ReplacementTAMS Head Office, Rous Head Rd., Fremantle. 400Tonne Wharf Installation

  • SMP Engineering
    • Port Hedland, Western Australia, Australia
    • Senior Project Engineer
      • May 2020 - Aug 2020
      • Port Hedland, Western Australia, Australia

      Short Term Contract signed up for 3 Swings.BHP Port Lab Finucane Island. CPB Project, Coordinating site inspections and Client sign off. Compiling MDR.Nice Project, 4 Swings and finished.

  • SMP Engineering
    • Kwinana Lithium Project
    • Project Engineer
      • Oct 2018 - Oct 2019
      • Kwinana Lithium Project

      Small Bore Piping Isometrics and P&ID Red Line Mark Ups from Line Walking and Site Measurements.In the order of 750 Isometrics produced, on time, as required for Client Walkdowns. A professional no fuss service provide with a smile to a workforce of in excess of 200 Tradespeople.

  • Downer
    • Ichthys Project Darwin
    • Project Engineer
      • Sep 2018 - Oct 2018
      • Ichthys Project Darwin

      Engaged through SMP as a Project Engineer on the Ichthys Gas Project. Ended up completing a long 5 week swing, for the benefit of the Project. I believe, as a small group of 5, we were very effective, in clearing up some very important work in a short period of time, to the satisfaction of the client. Time to move on to the next project. Lithium Plant, Kwinana awaits.

  • Home
    • Perth, Australia
    • SMP Supervisor/Project Engineer.
      • Apr 2018 - Sep 2018
      • Perth, Australia

      Presently on Extending Leave

  • Total AMS - Part of the TAMS Group
    • Fremantle/Port Headland
    • Civil Supervisor
      • Apr 2017 - Apr 2018
      • Fremantle/Port Headland

      Total AMS were awarded the "BHP Wharf Remediation Project" which has now been suspended until next financial year. It was a great 13 months, worked with some very impressive Tradesmen, Supervisors and young Engineers. My involvement included supervising Concrete Strengthening at two locations of the Wharf Sub Structure. Placing a 10mm Microsurfacing over the existing Wharf Berths A & B , approx 10,000m2 with associated Thermoplastic Line Markings. General Supervision of Civil Remediation works associated with the Project.

  • Total AMS
    • Fremantle/Cape Preston
    • Project Engineer
      • Aug 2016 - Mar 2017
      • Fremantle/Cape Preston

      Primary task was relocation of Stop Dolphin. Break out 3m thick mass concrete on 16m Dia Steel Dolphin, remove 3000m3 rock fill, lift shell approx. 600 tonne with Heavy Lift Vessel. Relocate to new location, prepare sub sea foundation, lower into place, refill with 3000m3 rock fill and cast 300mm concrete topping. A variety of other works were completed and the work is still ongoing, subject to Cape Preston programing.

  • Graham Brennen
    • Perth, Australia
    • Long Service Leave
      • Apr 2016 - Aug 2016
      • Perth, Australia

      Will be overseas until end of June.Will be looking for my next experience from 1st July 2016

  • EVTJV
    • Perth
    • Project Engineer
      • Oct 2015 - Apr 2016
      • Perth

      Working on the Wheatstone Project, Condensate & LNG Tank Construction Methodology.Compiling precise Installation Packages for Installation of Platework, Pipework, Ladders & Platforms associated with Large Tank Construction

    • Australia
    • Mining
    • 700 & Above Employee
    • Project Engineer
      • Feb 2015 - Jun 2015

      Piping Project Engineer with SMP Engineering, seconded to Thiess as a Piping Coordinator, QA/QC Inspector. Working at Roy Hill Mine Site, Newman, WA. Working on a 3/1 fifo roster from Perth. Duties include Compiling Workpacks., Engineering support to Construction Crews. Raising FMR's for all Construction Material. Completing all QA/QC requirements including raising TQ’s & SIR’s. ITP & ITR’s sign off. Red Line As Built mark up for Isometrics, P & ID and 3D Model verification.

    • Project Engineer
      • Feb 2014 - Jan 2015

      I was engaged as a Piping Project Engineer with SMP Engineering, seconded to Thiess as a Piping Coordinator, QA/QC Inspector. Project was the Coal Seam QCLNG Upstream Project based in the Surat Basin, Queensland working on a 2/1 fifo roster from Perth.My engagement with Thiess was originally at Ruby Jo Central Processing Plant where I worked as part of the As Built team, from where I moved to Bellevue Central Processing Plant, then on to Poppy Field Compression Station and finally onto Jordan Central Compression Plant, all through to completion.My position at Jordan was Piping As Built Team Leader, responsible for As Built Red Line Mark Up, Post Hydro Punch Listing, ITR sign off, through to Client Walkdown and final Sign Off on over 1000 Piping Isometrics.

    • Senior mechanical plant layout draftsman/checker
      • Aug 2013 - Feb 2014
      • Welchpool

      Designated checker of China generated Shop Drawings for extensive quarry project.600tph Crushing Plant, at Point Wilson, Melbourne. Comprising 3 Crushing Stations,8 Screen Stations, 3 Radial Stackers and over 40 Conveyors.

    • Senior Mechanical Designer/Checker
      • Nov 2011 - Aug 2013
      • Nedlands

      Plant Layout Designer of Flotation Plant for Obuasi Gold Mine, Ghana.Designated checker for Civil, Structural & Mechanical drawings for Obuasi Project.Designated checker for Civil, Structural & Mechanical drawings for Dougald River Project

    • Project Coordinator
      • Oct 1992 - Aug 2011
      • Tasmania

      Project Management.Contract Supervision, liaison with Production, Maintenance & Management to define Design Scope.Material Procurement & Labour Hire.Supervision & Commissioning of Civil, Structural, Mechanical & Piping Installations over a vast array of Capital Work Projects.

Education

  • Hobart Technical College
    Engineering Certificate
  • Hobart Technical College
    Engineering Certificate

Suggested Services

This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection

Industry Focus. “Maritime Transportation”

Looking to Create a Custom Project?

Need a custom project? We'll create a solution designed specifically for your project.

Get Started

References

Social Profiles

Community

You need to have a working account to view this content. Click here to join now

Similar Profiles