Bio
Experience
-
Pradhan Associates Pvt. Ltd.
-
Jharsuguda, Odisha, India
-
Project Engineer
-
Oct 2023 - Present
-
Jharsuguda, Odisha, India
Erection & Alignment of Equipment and Structural shed . Daily scheduled & planning job , execution with safety standard Provides technical assistance to Vendor and Review work progress. Manpower management along with following and implementation of company HSE policy on site & zero harm working condition and reducing the unsafe condition, unsafe act and near misses in the plant . Familiar with equipment isometric drawings, alignment along with erection. Supervise (Routine & Non-Routine) work & special work like Height, Hot , Crane & Lifting jobs . Co-ordinating with contractor employees, vendors for progress of project completion. Execute the work as per followed byproper Quality/Engineering standards. Take Responsibility for Safe work practices at site as per followed by all HSE norms.
-
-
-
JKS Engineering
-
Jharsuguda, Odisha, India
-
Assistant Mechanical Engineer
-
Aug 2020 - Sep 2023
-
Jharsuguda, Odisha, India
From 10th August 2020 at JKS engineering :Position as a Site engineer:Budget Scheduling | Project planning | Manpower planning | Site Audit | Supervision | HSE Standards & Norms | Billing | Work permit in SAP | Team Work Following work to be carried out during that periods :-1. Replacement of 3M Colt Ventilator at Rodding shop successfully completed at Smelter plant Vedanta ltd, Jharsuguda 2. Replacement of 12M Colt ventilator at Cast house billet processing plant at Smelter Vedanta ltd 3. Replacement of Exhaust fan dismantling work at Cast house billet processing plant at Smelter vedanta ltd 4. Replacement of 12M colt ventilator Sheet blinding and C purlin strengthing work at Casthouse Billet processing plant at Smelter vedanta ltd 5. Replacement of EOT Crane platform dismantling and erection work at Cast house Ingot, wire rod , billet plant at smelter unit vedanta ltd jharsuguda 6. Replacement of Roof sheeting and Rainwater gutter erection work at Track hopper Railway line CPP 9X1215 MW Captive power plant unit at vedanta ltd 7. Replacement of Thermal insulation & cladding work of Boiler Duct and Steam pipe line on TPP 4X600 MW Thermal power plant unit vedanta ltd
-
-
-
-
Machinery Manufacturing
-
1 - 100 Employee
-
Quality Assurance Engineer
-
Jun 2019 - Apr 2020
QA Engineer at Dynamic for manufacturing of Automotive components :-Process parameters and quality defects :1. Tolerance level 2. Material heating zone 3. Cavity pressure 4. Injection time , speed , rate 5. Product cooling time and overall production time6. Controlling Rejection wastage 7. Handling customer complaints to ensure zero defects 8. Leaking of plastic material from the mold 9. Sink and Gas mark from burning of the material 10. Machine and in process audit hourly for efficient and better quality improvement
-
-
Quality Assurance Engineer
-
Jun 2019 - Sep 2019
QA Engineer position for Manufacturing of Automotive components using plastic injection molding :-Process parameter checked during production :1. Material heating zone 2. Cavity pressure 3. Injection time , speed & rate 4. Overall production time and product cooling timeQuality defects and responsibilites :1. Sink mark, Gas mark from burning of the material 2. Leaking of plastic material material from the mold 3. Ensuring zero defects while OQC (Outward quality control)4. Controlling Rejection wastage 5. Troubleshoot customer complaints
-
TRIDENT FABRICATORS PRIVATE LIMITED
-
Jharsuguda Area, India
-
Assistant Engineer
-
Jun 2016 - Mar 2019
-
Jharsuguda Area, India
JOB DESCRIPTION: Structural steel platform erection and fabrication work Erection of Structures Erection of Machine and conveyor guarding Anode vechile carrying bed modification for efficiency increment Rooftop and Roadside handrailing installation for easy movement Firefighting pipeline installation, Hydrant, valves, flange on Coalyard storage upto a distance of 1 km Drossing seal plate modification in Casting AreaResponsibilities: Reviewing drawing, layout and technical specification for erection and commissioning of the work Developing erection plan and WPS(work permit system) as per project specification Determine labor requirements for dispatching workers to construction sites. Preparation of material estimation and material tracking Inspection of mechanical equipments, structural steels, Pipes & Fittings, Valves etc. Arranging Qualification and certification of welder in co-ordination with QA/QC Dept Checking Civil foundation and pedestal takeover for mechanical erection work Co-ordinate with supervisory personnel, HSE, contractors and design professionals to discuss and resolve matters, such as work procedures, complaints, or construction problems. Manage all communication with supervisors and ensure efficiency of all fabrication process Fabrication, welding and erection of structural, piping and equipments alignments at site Assist with Site manager and prepare reports on regular basis after final inspection Verification and Certification of subcontractor R.A Bill Minutes of meeting(MOM) with sub-contractor, client and sub-agencies Arranging NDT Testing (RT, UT & DPT) inspection Take actions to deal with the results of delays, bad weather, or emergencies at construction site.
-
-
Education
-
2009 - 2013Maharaja Institute of Technology (MIT), Bhubaneswar
Bachelor's degree, Mechanical Engineering -
2008 - 2009Institute of Professional Studies and Research (IPSAR), Cuttack
Bachelor of Science - BS, +2 Science -
2006 - 2007DAV PUBLIC SCHOOL TALCHER
10th, Higher secondary education
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Industrial Machinery Manufacturing”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community