Bio
Credentials
-
AUTOCAD & SOLIDWORKS
-
Experience
-
POLMON VESNFER PRIVATE LIMITED
-
Hyderabad, Telangana, India
-
Deputy Manager
-
Jan 2021 - Present
-
Hyderabad, Telangana, India
Single fluid systems, Process Automation (Reactors, Crystallizers, Utilities)
-
-
-
Aurore pharmaceuticals pvt ltd
-
Hyderabad, Telangana, India
-
Assistant Manager
-
Jun 2020 - Jan 2021
-
Hyderabad, Telangana, India
-
-
-
HETERO LABS LIMITED - India
-
Kazipally
-
Asst. Manager
-
Feb 2020 - Jun 2020
-
Kazipally
Withdrawn service
-
-
-
-
Senior Executive
-
Jul 2017 - Jan 2020
-
-
-
Biological E. Limited
-
Hyderabad, Telangana, India
-
Sr.Executive
-
Jan 2016 - Jul 2017
-
Hyderabad, Telangana, India
Project lead
-
-
-
SARAS ENGINERING ASSOCIATIONS
-
Teva API ; Gajraula
-
Project Engineer
-
Jan 2014 - Dec 2015
-
Teva API ; Gajraula
Working as Project Engineer in Green field projects, Design& Integration of Different drawings from Suppliers, Technical evaluation, Inspection of Equipment's, Manpower handling, Project coordination, Project planning, HVAC maintenance, project status preparation and updation in Microsoft Projects, Preparation of TC/TR's Etc.
-
-
-
-
Planet ceramica pvt.ltd
-
Oct 2010 - Jan 2014
I am very fair about design through AUTO CAD, Mechanical Maintenance works, Equipement selection & Inspection, Fabrication works, erection Activities and all. I am successfully completed 175 TPD Batchplant & Furnace and 35 TPD Batchplant and furnace Including Piping works. project names: Samyu glass pvt ltd, Cogent glass ltd.Responsibilities :JOB PROFILE: Working as Project Engineer cum Designer in PLANET CERAMICA PVT LTD, Hyderabad. Development of Plant 2D layout in Auto cad such as G.A’s, Structural and Piping. Efficiently drafting, detailing, section with BOM, GD & T, Machining Symbols, etc. Preparation of Efficient Project Planning ( Time Schedule, Work plan, Manpower management). Selection of Pumps based on the Pipe routing. Technical Evolution of Quotations. Design & Selection of Mechanical equipment's and purchase. Inspection of Mechanical Equipment's. Erection of Equipment's at site as per design. Work inspection at site as per the drawing. Commissioning of Plant (Mechanical Equipment's). Maintenance of plant 3 months after commissioning
-
-
Education
-
2006 - 2010Annamacharya institute of Techonology and engineering
Bachelor's degree, Mechanical Engineering -
2006 - 2010Annmacharya institute of technology and science
Bachelor of Technology (B.Tech.), Mechanical Engineering
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. Add an industry
Need a custom project? We'll create a solution designed specifically for your project.
References
Community