Bio
Credentials
-
Professional Certificate JORC Code Reporting
AusIMMSep, 2023- May, 2026
Experience
-
-
Australia
-
Mining
-
200 - 300 Employee
-
Team Lead Surface - Canada
-
Jan 2024 - Present
-
-
Manager Open pit - Principal Mining Engineer
-
Jan 2022 - Jan 2024
-
-
Australia
-
Mining
-
700 & Above Employee
-
Long Term Planning & Studies Superintendent
-
Feb 2019 - Dec 2021
Mine Operations:• Responsible in the calculation of cutoff grade and reserve aligned with the JORC Code.• Lead of the strategic evaluation to define the Life of Mine (LoM) guideline.• Specialist and lead all mining Permits.• Lead of the pit design, schedule and opex of the LoM: low, medium and high case.• Responsible for the Assumption Book (KPI´s) for the LoM.Mining Projects and Expansions:• Performed technical analysis and trade off infrastructures such as crusher location, dumps, tailing store, stocks and minor mine infrastructure for open pit opening and mine sequencing.• Evaluated multiple mine plan scenarios for production expansions aligned with legal and environmental permits to increase NPV• Lead of the mining chapter in several studies like conceptual, prefeasibility, feasibility and reviewed the engineering studies of the strategic collaborators.• Lead of mining evaluation in M&A projects in America.
-
-
Long Term Planning & Business Development Supervisor
-
Dec 2013 - Jan 2019
-
-
Assistent Superintendent of Planning
-
Mar 2013 - Nov 2013
-
Perú
• Responsible for the topography, short and long term mine planning, staff in charge: 9 people.• Responsible of compliance of mining sequence and activities with the area of geotechnical, hydrogeology, mine operations, drilling and blasting. • Responsible for updating the cutoff grade of the San Pedro and Pampa Verde open pit, 30,000 t/d of ore, phase redesign and estimation of mineral reserves, increase the reserves in 2%.• Implemented long-term procedures and report from the Superintendency of Planning.
-
Xstrata Las Bambas
-
Perú
-
Supervisor Long Term Planning
-
Sep 2011 - Mar 2013
-
Perú
Participation in the opening of the mine by:• Optimized the mining plan of the feasibility study for the prestripping and mining.• Implemented the Operational Readiness for the Mine Operations Management of the main infrastructures.• Developed the first budgets of the Technical Services and Mine Operations Management.
-
-
Master in Economics Minerals
-
Mar 2010 - Jul 2011
-
Chile
Scholarship “Leaders for Mining” awarded by Minera Inés de Collahuasi and Minera Escondida, the only foreigner in the program. Thesis “Creating Value in a Junior Mining”.
-
Aruntani S.A.C.
-
Lima Province, Peru
-
Mining projects coordinator
-
Sep 2008 - Feb 2010
-
Lima Province, Peru
• Interim Head of Aruntani Mine Planning of 35,000 t/d of gold ore.• I carried out the planning of two gold mining projects of 30,000 and 20,000 tons of ore and one copper project of 10,000 tons.
-
-
Planning engineer
-
Aug 2006 - Aug 2008
• Responsible for the mine planning of copper mine of 5,000 t/d.
-
-
Blasting assistant leader - Assistant leader of mining operations
-
Nov 2005 - Aug 2006
• Blasting supervisor, in charge of 20 people. Mine Operations Supervisor, in charge of 50 people
-
-
Engineer training in mining operations
-
Sep 2004 - Jun 2005
• Training in 04 mining units: Ucchuchacua, Shila, Antapite, Orcopampa, underground mines.
-
-
Blasting internship
-
Apr 2004 - Jul 2004
-
Education
-
1997 - 2003Pontificia Universidad Católica del Perú
Mining engineer, Ingeniero de minas -
2010 - 2011Pontificia Universidad Católica de Chile
Master in Mineral Economics, graduate
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Mining”
Looking to Create a Custom Project?Get StartedNeed a custom project? We'll create a solution designed specifically for your project.
References
Community
You need to have a working account to view this content. Click here to join now -