Megawide Construction Corporation
-
Philippines
-
AVP - Infrastructure
-
Apr 2019 - Present
-
Philippines
-
-
-
BKAsiaPacific
-
Hong Kong
-
Senior Estimator
-
Sep 2015 - Present
-
Hong Kong
-
-
-
-
CHIEF ENGINEER
-
Feb 2019 - Present
-
Philippines
Estimating & Tendering, Commercial & Operation
-
-
-
Vinci Construction Grands Projets
-
Hong Kong
-
Senior Estimator
-
Nov 2011 - Jul 2015
-
Hong Kong
LISTS OF PROJECTS ESTIMATED / AWARDED*:1. Shatin to Central Link Contract 1109 – Sung Wong Toi and To Kwa Wan Stations and Tunnels – comprised of 2 stations (top down) and 2.4km TBM tunnels in Hong Kong2. Shatin to Central Link Contract 1103 – Hin Keng to Diamond Hills Tunnels – comprised of Ventilation building and emergency exit point, 100m cut & cover tunnel, 2,252m drill & blast tunnel, 100m mined tunnel and 1,420m TBM tunnels in Hong Kong*3. Tuen Mun – Chek Lap Kok Link – Northern Connection Subsea Tunnels Section in Hong Kong4. Shatin to Central Link Contract 1128 – South Ventilation Building to Admiralty Station – comprised of Ventilation Building, Emergency Egress Point, Jet Grouting, Underpinning of Existing Buildings, Pile Obstruction Detection and Removals and 2.018km TBM tunnels (2 Slurry and 1 EPB TBMs) in Hong Kong5. Shatin to Central Link Contract 1121 – NSL Cross Harbour Tunnel Immersed Tunnel - comprised of 1400m of Immersed Tube Tunnel; two landfall tunnel (280m at CBTS + 200m Hung Hom) and North Ventilation Building; casting facilities at Shek O basin; associated works and RRIW (on-going Tender Early Contractor Involvement)6. Christian Alliance International School – Owned by Kowloon Tong Church of the Chinese Christian Missionary Alliance, six (6) storey school building with 26,000m2 floor area superstructure, building services and ABWF works.7. Shatin to Central Link Contract 1122 – Admiralty South Overrun Tunnel, 700 meter length Drill & Blast Tunnel8. Kai Tak Development Stage 2 Infrastructure Works – Owned by CEDD, 1,700m long dual lane road and 1,400m landscaped deck with noise barrier (on-going estimate)
-
-
-
Huayou Construction Development Corporation (subsidiary of Qingdao Construction)
-
Ezcriva Drive, Pasig City, Philippines
-
Estimating Manager
-
Aug 2011 - Nov 2011
-
Ezcriva Drive, Pasig City, Philippines
LISTS OF PROJECTS ESTIMATED / AWARDED*:1. M PLACE @ Ortigas Civil / Structural and Part Architectural Works, Owner / Developer – SM Development Corporation (25 Storey, FA = 47,930 sq.m) ~ Brgy. Ugong, Ortigas, Pasig City, Philippines (Php707M)2. Gentri Doctors Medical Centre, Complete Civil / Structural / Architectural / Electro-Mechanical Works (7 Storey, FA = 9,300 sq.m) ~ Gov. Drives, Gen. Trias, Cavite (Php236M)3. Circulo Verde Garden Homes CP-05 Structural and General Architectural Works, Owner / Developer – Ortigas and Company Limited Partnership (61 Units of 3~4 Storey Townhouse Units, Total FA = 9,891 sq.m) ~ Calle Industria, Bagumbayan, Quezon City*4. THE MASTERPICE, Proposed 15-Storey Commercial and Condominium Building, Owner / Developer – Zhong Fa International Development Inc. (15 Storey, FA = 65,655 sq.m) ~ Lot 7-B Central Business Park (PEA), Pasay City
-
-
-
Private Practice - Self Employed
-
Batangas, Philippines
-
Consultant Estimator
-
Aug 2010 - Aug 2011
-
Batangas, Philippines
LISTS OF PROJECTS ESTIMATED / AWARDED*:1. Proposed Four (4) Storey IB Calingasan High School Building – Design and Construction (Tuy Batangas)2. Jericho Farm (3000 capacity hog farm in a 3 hectare farm complete site development, growing houses, waste water treatment facilities, fresh and foul water supply system, support facilities and concrete hollow blocks fencing) in Bagong Pook, Lian, Batangas3. Three Storey Residential and Commercial Building Renovation Works (Calaca, Batangas)4. Design, Estimate and Supervision for the renovation of residential house in Lian, Batangas*
-
-
-
Leighton Contractors Asia Limited
-
Hong Kong
-
Senior Estimator
-
Sep 2009 - Jul 2010
-
Hong Kong
LISTS OF PROJECTS ESTIMATED / AWARDED*:1. XRL 822 - Tse Uk Tsuen to Shek Yam Tunnels *2. XRL 811A - WKT Approach Tunnel (North)3. XRL 820 - Mei Lai Road to Hoi Ting Road Tunnels4. Cathay Pacific Air Cargo Terminal5. XRL 821 - Shek Yam to Mei Lai Road Tunnels6. XRL 824 – Ngau Tam Mei to Tai Kong Po Tunnels7. Pacific Place Mall Contemporisation – Queensway New Footbridge 8. HY/2009/19 Central – Wan Chai Bypass (North Point Section) – Island Eastern Corridor Link
-
-
-
Leighton International Limited
-
Kuala Lumpur, Malaysia and New Delhi / Chennai, India
-
Senior Estimator
-
Apr 2008 - Jun 2009
-
Kuala Lumpur, Malaysia and New Delhi / Chennai, India
LISTS OF PROJECTS ESTIMATED / AWARDED*:1. Tata Alliance 1st Info Park Complex in Taramani, Chennai, India – Master Planning and Design of 27.25 acres of land includes built-up areas of 376,450 sq.m. of IT, 26,026 sq.m. of retail, 31,603 sq.m. of residential and 31,603 sq.m. of hotel and associated below grade area of 232,376 sq.m. for parking and mechanical.*2. M370 Electrified Double Track Project Between Ipoh ~ Padang Besar – Malaysia3. Development of Container Terminal at Ennore Port, India (EPC)4. Jawaharlal Nehru Port Trust (JNPT) Container Terminal – Budgetary (EPC)5. South and West Basin at Mundra for Main Jetty and Approaches - Budgetary6. 4/6 Laning of MP / Maharastra Border – Dhule Section of NH-3 from Km 168.500 to Km 265.000 in the State of Maharashtra, India under NHDP Phase IIIA on BOT (Toll) Basis – (EPC)7.Six Laning of the Existing Road from Km 364.125 to Km 58.245 (approximately 93.56 Km) on the Kishangarh-Ajmer-Beawar Section on National Highway No.8 in the State of Rajashtan, India by Build, Operate and Transfer (BOT) under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) Basis – Project – (EPC)8. 4/6 Laning of Pimpalgaon – Nashik – Gonde Section of NH-3 from Km 380.000 to Km 40.000 in the State of Maharashtra, India under NHDP Phase IIIA on BOT (Toll) Basis – (EPC)9. Six Laning of Kishangarh-Udaipur Section of NH-79, NH-79A and NH-76 from Km 364.000 of Nh-8 to Km 113.800 of NH-76 (Length – 315.00 Km) in the State of Rajashtan, India to be Executed as BOT (Toll) on DBFO pattern under NHDP – Phase V – (EPC)
-
-
-
International Golden Resources Investment and Development Corporation
-
Ortigas Center, Pasig City, Philippines
-
Chief Engineer
-
Jun 2007 - Apr 2008
-
Ortigas Center, Pasig City, Philippines
LISTS OF ON-GOING PROJECTS:1. Conceptualization, Design, Construction and Project Management of 33-Storey Diamond Tower Residential Condominium – 81 Mariveles St., Brgy Highway Hills, Mandaluyong City, Philippines2. Conceptualization, Design, Construction and Project Management of 93.2 Hectares High, Middle and Low Income Residential Housing in Montalban, Rizal
-
-
-
GMC Construction, Inc.
-
Laguna Technopark, Binan, Laguna, Philippines
-
Project Manager
-
Dec 2006 - Jun 2007
-
Laguna Technopark, Binan, Laguna, Philippines
Mapplehaus Building 118 ProjectMaplehaus project is composed of approximately 6,000 square meters ofmanufacturing building to be utilized by Vitalo Packaging Corporation. This project isa complete package of site development works, civil, structural, architectural,electrical, plumbing & sanitary, fire protection and mechanical works. Sitedevelopment works composed of 15,000 cubic materials of fill materials completewith road, drainage, and sanitary and other auxiliary structuresOver-all in-charge in the project implementation main objective is delivering theproject within the construction time frame and in conformance with the budget andemployers requirements.Project executed on time, complied with employers requirements and within theprojected budget of our company.
-
-
-
China State Group of Company
-
Ortigas Center, Pasig City, Philippines
-
Estimating Manager / Commercial Manager / Chief Engineer
-
Jan 2006 - Dec 2006
-
Ortigas Center, Pasig City, Philippines
Directly reporting to the Managing Director of China State Group of Co. and currently holding a position of Chief Engineer for three (3) companies: China State Construction Engineering Corporation (for foreign funded projects), China State (Phils.) Construction Engineering Corporation (for domestic funded project and San Miguel / China State Joint Venture (for below Php 100M projects). Concurrently responsible in the management, supervision and administration of the day-to-day activities of the Commercial/Tendering/Technical/Pre-qualification Department. Oversee the overall preparation of all project bid estimates and finalize all bid proposals of the company. Attends to the negotiation process and clarification meetings and proceedings with prospective Clients, Consultants, Designers and Construction Project Managers.LISTS OF ON-GOING PROJECTS:1. Icon Residences (two towers of 32 storey) – Global City, Fort Bonifacio, Taguig, Metro Manila, Philippines2. Mckinley Corporate Plaza – Mc Kinley Hills, Fort Bonifacio, Taguig City, Metro Manila, Philippines3. Residential Resorts @ Newport City – Newport City, Pasay City, Metro Manila, Philippines4. Construction/Renovation of Lapu-lapu Hall of Justice (World Bank Funded) – Lapu-lapu City, Cebu, Philippines5. Construction/Renovation of Angeles City Hall of Justice (World Bank Funded) – Angeles City, Philippines6. Sunshine Garden Condominium Project – Mandaluyong City, Metro Manila, Philippines 7. Catarman-Calbayog via Lope de Vega Road Improvement Project (JBIC) – Northern & Western Samar Province, Philippines8. Rehab & Improvement of PENRIS Diversion Dam & PBRIS Main Canal & Related Structures & Supply & Installation of Gates for Casecnan Multi-Purpose Irrigation & Power Project (JBIC) – Northern Philippines9. Marikina Bridge & Access Road (IBRD – World Bank Funded) – Marikina City, Philippines10. CP C.5: Quirino Highway (NLEX Junction-North Fairview) (IBRD Funded) – Quezon City
-
-
-
-
Senior Estimator / Quantity Surveyor
-
Dec 2004 - Jan 2006
LISTS OF PROJECTS ESTIMATED / AWARDED*:1. Hyderabad International Airport Limited – Hyderabad, India*2. Three (3) Highways Projects under NHAI – India*
-
-
Estimating Manager / Technical Manager
-
Jan 2003 - Dec 2004
LISTS OF PROJECTS ESTIMATED / AWARDED*:1. Design & Construct MC Mall Project (130,000m2) – Ortigas, Pasig City, Philippines2. SM Mall of Asia (Biggest Mall in Asia with Floor Area of approx 300,000 m2) – Roxas Blvd, Pasay City, Philiippines3. Design & Construct San Miguel Guangdong Plant – Foshan City, PRC* 4. Design & Construct San Miguel Vietnam Plant – Ho Chi Min, Vietnam5. The Sentosa Tower (40 story office & condo bldg) – Ortigas, Pasig City, Philippines.6. Fairways & Bluewaters Condotel – Boracay Island, Philippines*7. Saint Lukes Hospital (Design & Construct Project) – Fort Bonifacio, Metro Manila, Philippines8. Three Irrigation Project JV w/ Sino-Hydro (under National Irrigation Administration)9. Sabo Dam & Fan Apex Improvement Project – CP1 (under DPWH-JBIC)10. Banaoang Pump Irrigation Project (under National Irrigation Administration)11. Rehabilitation of Surigao-Davao Coastal Road, Marihatag-Barobo / Tagbina-Hinatuan Road Section CW-RU-1.4B (under DPWH-IBRD)12. Rehabililitation of Kabankalan-Basay / San Enrique-Vallehermoso Road, Hinobaan-Basay / La Castellana-Kanlaon Section CW-RU-1.6 (under DPWH-IBRD)13. Metro Manila Interchange Construction Project, Phase V, C-5 / Kalayaan Ave. (R-4) Interchange Project (under DPWH-JBIC)14. Metro Manila Urban Transport Integration Project, Pacakge 4: Marcos Highway (Evangelista to Masinag (under DPWH-IBRD)15. Rehabilitation & Improvement of PENRIS Diversion Dam & PBRIS Main Canal & Related Structures & Supply & Installation of Gates for Casecnan Multi Purpose Irrigation & Power Project – Irrigation Component Control No. CMIPPI-U2 (under National Irrigation Administration – JBIC)*16. Contract Package 2, Bohol Road Project (under DPWH-IBRD)*17. Contract Pacakge 3, Marikina Bridge and Access Road (under DPWH-JBIC) – Markina City, Philippines*18. Catarman-Calbayog via Lope de Vega Road, CP-2 (under DPWH-JBIC) – Northern & Western Samar Province, Philippines*
-
-
Chief Estimator
-
Jan 2002 - Jan 2003
LISTS OF PROJECTS ESTIMATED / AWARDED*:1. Metro Iligan Infrastructure Development Project Provincial Road Component (under DPWH-IBRD)2. Sixth Road Project – Bridge Component (ADB Loan no: 1473-PHI/EXIM United Loan), Contract Package CP-1A (under DPWH-ADB)3. Construction of Can-Asujan Dam & Appurtenant Facilities Contract No. SPISPI-C-1 (under NIA – JBIC)4. Construction of Bayongan Dam & Appurtenant Facilities, Contract No.: BHPIP2-C-1 (under NIA – JBIC)5. IBRD-Assisted National Road Improvement & Management Project, NRIMP-1, Loan No.: 7006-PH, Malatag-Malita-Jose Abad Santos Road Project, Jct. Sulop-Malita Road Section, CW-RU-1.5 (under DPWH-IBRD)6. Manila Second Sewerage Project, Community Sanitation Project Contract No.: SP-02 (under MWSS-JBIC)7. Lower Agusan Development Project, Stage 1, Phase II, Agusan River Improvement (East Bank) & Cut-off Channel, Contract package 1 (under DPWH-JBIC)8. Arterial Road Links Development Project, Phase III, Mindoro West Coast Road Improvement Project, Mamburao – Abra de Ilog Road Section, Contract Package 1 (under DPWH-JBIC)9. Arterial Road Links Development Project, Phase III, Mindoro West Coast Road Improvement Project, Sablayan – Sta. Cruz Road Section, Contract Package IV (under DPWH – IBRD)10. Cebu South Reclamation Infrastructure (Stage 1-1) Project MCDP III, Loan No.: PH-P157 (under Local Government Unit – JBIC)11. Asphalt Overlay of Agusandel Norte-Surigao Road, Remedios Trinidad Romualdes – Cabadbaran Road Section, Contract Package No.: PM-2002-1-12 (under DPWH-JBIC)*12. MSSP-2 Construction of Septage Treatment Plant & Rehabilitation / Upgrading of Existing Sewage Treatment Plant at Dagat-Dagatan (under MWSS-JBIC)13. Construction of Puerto Princesa Sanitary Landfill (under Local Government Unit – JBIC)
-
Mancon Berhard / CBDC Joint Venture
-
Makati City, Philippines
-
Cost Engineer
-
Oct 2000 - Jan 2002
-
Makati City, Philippines
-
Monark Constructors Corporation
-
Ortigas Center, Pasig City, Philippines
-
Cost / Quantity Engineer
-
Apr 1999 - Oct 2000
-
Ortigas Center, Pasig City, Philippines
-
Asian Construction and Development Corporation (Asiakonstrukt)
-
Makati City, Philippines
-
Sr. Civil Works Supervisor / Section Manager Civil Estimating Dept
-
Nov 1993 - Apr 1999
-
Makati City, Philippines
-
Fochi Fillipo Spa.
-
Arak, Iran
-
Civil Quantity Surveyor / Civil Engineer
-
Nov 1992 - Nov 1993
-
Arak, Iran
ARAK PETROCHEMICAL COMPLEX PROJECT Assigned in the Civil Technical Coordinator office. Responsible in the preparation of working drawings using the Snamprogetti Petrochem Standard. Estimate bill of materials required in the project. Plan work activities and prepare manpower and equipment utilization Supervise the installation of civil underground utilities, equipment foundation, concrete pavement, and lighting pole and foundation. Supervise the construction of cooling towers and other auxiliary buildings. Evaluate and check subcontract works.
-
Asian Construction and Development Corporation (Asiakonstrukt)
-
Makati City, Philippines
-
Cost Control Engineer / Field Engineer / Estimator
-
Apr 1987 - Nov 1992
-
Makati City, Philippines
-
Private Practice (Self-employed)
-
Batangas, Philippines
-
Civil Engineer - Design & Build
-
Aug 1985 - Apr 1987
-
Batangas, Philippines
-
Atlantic Gulf & Pacific Co. of Manila
-
Batangas Marine & Fabrication Yard, San Roque, Bauan, Batangas, Philippines
-
Structural Draftsman Detailer
-
Apr 1985 - Aug 1985
-
Batangas Marine & Fabrication Yard, San Roque, Bauan, Batangas, Philippines
-
Private Practice (Self-employed)
-
Batangas, Philippines
-
Civil Engineer - Design & Build
-
Apr 1984 - Apr 1985
-
Batangas, Philippines
-
-
Education
-
1979 - 1984University of Santo Tomas
Bachelor of Science in Civil Engineering, Bachelor of Science in Civil Engineering Batch 1984
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Construction”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community