Bio
Experience
-
VTX Energy Partners, LLC
-
West, Texas, United States
-
Construction Foreman
-
May 2023 - Present
-
West, Texas, United States
-
-
-
Chevron USA
-
Eagleford
-
Construction / Maintenance Representative
-
Oct 2020 - Jun 2023
-
Eagleford
-
-
-
Noble Energy
-
Catarina, Texas
-
Senior Construction Foreman
-
Jul 2015 - Oct 2020
-
Catarina, Texas
-
-
-
-
Construction Foreman
-
Oct 2014 - Jul 2015
-
-
-
-
Project Lead
-
Nov 2013 - Oct 2014
-
-
-
PAC CONOCO PHILLIPS
-
Kenedy, Texas
-
Project Lead
-
Oct 2012 - Oct 2013
-
Kenedy, Texas
Project PIpeline Lead
-
-
-
Inspection and Testing Consulting Services Inc
-
Kenedy, Texas
-
Senior Welding Inspector
-
Sep 2012 - Jan 2013
-
Kenedy, Texas
-
-
-
PDI Solutions
-
Texas
-
Certified Welding Inspector
-
Aug 2012 - Sep 2012
-
Texas
Provide weld inspection during fabrication of land based drilling sub bases and mast sections.
-
-
-
-
Chief Inspector
-
May 2011 - Jul 2012
Welding Technology, leader, manager, liaison along with welding inspection (and tracking) RT film interpretation, mechanical and equipment inspection, civil inspection and the development and implementation of QA/QC Programs. Also have experience in performing Fabrication Facilities Surveillance.; Duties Included:Oversee daily welding activity. Verify that all welders have current WPQ's. Verify that all welding is being performed to Client approved Weld Procedure Specifications. Perform inspection of completed welding and ensure all NDE inspections are carried out per Clients Specifications. Verify pipeline routes and that depth of cover are maintained. Monitor drilling activities for bore sections along with pull back of bore sections. Monitor fabrication and testing of Pig Receivers and Launchers.
-
-
-
-
Quality Control Coordinator
-
Nov 2010 - May 2011
Duties included:Responsible for the assurance of the Quality aspects during pipeline construction to complete the Project successfully. Ensure that all activities adhere to approved Contract Documents, Company Procedures, Client Specifications along with applicable Codes and Standards and Contract Documents. Develop and maintain a direct liaison with Client Representatives. Organize and implement a comprehensive system of Audits. Develop and provide training of Project specific Inspection and Test Plans. Prepare and initiate a control system for Testing and Inspection activities. Responsible for field implementation of Project Quality Control Plan and supervision of Quality Control Staff.
-
-
-
-
QC Manager
-
Dec 2008 - Dec 2010
Sakhalin 1 Odoptu First Stage Project Quality Control Manager Pipeline and Chayvo Facilities Tie InsDuties included:Ensure effective implementation of the NDE program, as appropriate, to support day to day management of the welding activities. Responsible for review and approval of construction quality/ welding documents; including subcontractor quality documents. Review of specifications, technical and test requirements for quality input to the Project team. Support management of the NCR work process. Implement the quality surveillance program including follow-up to verify appropriate close-out of identified corrective actions. Fill in due to absence from the site for Quality Manager or Area Quality Leads. Performed Quality Surveillance in Vendor shops of equipment and materials for the Project.
-
-
-
-
Field QA/QC Manager
-
Jul 2008 - Dec 2008
Duties included:Responsible for the administration of the QA/QC program, implementing and supervision of inspection personnel. Responsible for the coordination of inspections, testing, and surveillances. Preparation of all code work documentation and coordination with Authorized Inspectors. Preparing welding procedure specifications, witnessing procedure qualifications and welder qualifications. Preparing daily, weekly and monthly reports. Verifying welding documentation and administration of the electronic Weld tracking program; also responsible for the construction records, PWHT, welding documentation and hydro test records.
-
-
Field QA/QC Manager
-
Jul 2007 - Jul 2008
Duties included:Help develop and implement a strong QA/QC Procedure to ensure that all applicable codes and standards along with any Client Specifications are maintained for the Project. Responsible for meeting with Project team to arrange for all documents that will be needed by QC Department for Project. Responsible for meeting and developing a strong relationship with Client QA/QC. Oversee all daily Inspection Activities. Responsible for maintaining filing system for all Project Documents concerning Quality Control. Responsible for ensuring that all Sub-Contractors activities meet Codes, Standards and Client Guidelines
-
-
QC Manager
-
Feb 2007 - Jul 2007
Duties included: Responsible for making sure all welding activities on project adhere to ASME B31.3 guidelines as well as client specifications. Perform Visual Testing of all completed welds and enter all data into Weld Track. Maintain and insure welder compliance adheres to project and clients specification. Prepare shooter reports for NDE testing and logging results in Weld Track. Perform frequent audits of the Welding Department's rod room to insure all operations are in compliance with S&B's and clients standards.Duties also include performing visual inspection of system packages for pre hydro, hydro's and post for final turnover to
-
-
QC Coordinator
-
Feb 2007 - Jul 2007
Duties included: Responsible for making sure all welding activities on project adhere to ASME B31.3 guidelines as well as client specifications. Perform Visual Testing of all completed welds and enter all data into Weld Track. Maintain and insure welder compliance adheres to project and clients specification. Prepare shooter reports for NDE testing and logging results in Weld Track. Perform frequent audits of the Welding Department's rod room to insure all operations are in compliance with S&B's and clients standards.Duties also include performing visual inspection of system packages for pre hydro, hydro's and post for final turnover to
-
-
QA/QC Construction Coordinator
-
Oct 2005 - Feb 2007
Duties included:*Coordinate and communicate Project Activities to contractor as well as serve as direct liaison between Principal Engineer and contractor as Project progresses or concerns arise.*Responsible for overseeing all Vessel Modifications to insure adherence to all ASME codes along with API 510 and Clients specifications were followed*Responsible for all piping installed and tested per ASME B 31.3, API 570, as well as monitoring contractors record keeping pertaining to welding rod control, x-rays, test packages and turn over books.*Responsible for overseeing all modifications to the existing API Tanks followed the applicable API 653, API 650 Codes.*Responsible for insuring all stationary rotating equipment installed to Clients Specifications.*Last but not least, maintain and monitor that all disciplines were performed safely
-
-
Freeport Field/Shop QC Management
-
Apr 1993 - Oct 2005
-
-
Education
-
1981 - 1983Texas State Technical Institute
Associate of Applied Science, Welding Technology -
1980 - 1983Texas State Technical College
Associate's of Applied Science, Welding Technology -
1977 - 1980Sweeny High School
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Construction”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community