Bio
Credentials
-
Mine Surveyors Certificate of Competency
-Mar, 1988- Apr, 2026
Experience
-
Caledonia Mining (CMCL)
-
Gwanda, Matabeleland South Province, Zimbabwe
-
Survey Consultant
-
Feb 2023 - Present
-
Gwanda, Matabeleland South Province, Zimbabwe
Gold Mine. Vertical Ore Body
-
-
-
Walk and See More
-
Blouberg Strand, Western Cape
-
Participative Management
-
Apr 2016 - Aug 2023
-
Blouberg Strand, Western Cape
Starting as from 1 April 2016Retirement on the Horizon.Lots of Vitamin C (Sea)
-
-
-
Anglo American
-
Declines, Richard Shaft
-
Shaft Surveyor
-
Sep 2013 - Apr 2016
-
Declines, Richard Shaft
Declines did mechanized mining and Richard shaft does scattered mining.I implemented graphic plans at the Declines Survey department. We are now fully on graphic plans at Richard shaft as well.
-
-
-
Harmony Gold
-
Doornkop Mine , Randfontein
-
HOD Survey
-
Oct 2008 - Jul 2013
-
Doornkop Mine , Randfontein
We mined Kimberly reef on Board and Pillar and South reef as scatter mining. I implemented measuring/ plotting into MRM graphics.I was MRM for just over a year at Doornkop Mine before I left.
-
-
-
Anglogold -before Ashanti (AAC)
-
President Brand Mine, No 4 Shaft, Welkom
-
Section Surveyor
-
Mar 1988 - May 2011
-
President Brand Mine, No 4 Shaft, Welkom
I obtained my MSCC and started as a Section Surveyor, Certificated.
-
-
-
Anglo American
-
Rustenburg Area, South Africa
-
Shaft Surveyor
-
May 2005 - Oct 2008
-
Rustenburg Area, South Africa
Worked at Brakspruit and Bleskop Shafts.Bleskop was Hybrid mining. Brakspruit scattered mining.
-
-
-
Gold Fields Ltd.
-
Westonarea
-
Section Surveyor
-
Aug 2002 - May 2005
-
Westonarea
Worked at Kloof 1Shaft.I was part of team that implemented stope measuring into MRM Graphics.
-
-
-
AngloGold Ashanti
-
Elandsrand Mine, Carletonville
-
Section / Chief Surveyor
-
May 1991 - Jun 2001
-
Elandsrand Mine, Carletonville
I worked on the Shaft Deepening Project for most of my time there. A plug was created near shaft bottom and we deepened the shaft below an existing working shaft and did all the capital and primary development. All the Steady Brackets for the Shaft wires were stripped out. We overcame the challenge using existing Shaft steel work to re-create new Steady Brackets. We did Station Surveys and a Gyro simultaneously and did all the calculations while underground.On completion the plug was removed and the link up between the old and new shafts were perfect. A year after Harmony took over (2000) the Shaft I was retrenched (2001).
-
-
-
AngloGold Ashanti
-
Welkom Area, South Africa
-
Surveyor, Grade Officer, Assistant Section Surveyor.
-
Jan 1975 - Mar 1988
-
Welkom Area, South Africa
I started on 20 Jan 1975 as a Sampler at President Steyn 1 and 1A Vent ShaftSurveyor. President Steyn 1 and 4 ShaftGrade Officer. President Steyn 4 ShaftShaft Sinking Surveyor. President Steyn 4 Shaft LowerAssistant Section Surveyor. President Steyn 2 Shaft
-
-
Education
-
1994 - 1995University of the Witwatersrand
NHD Mine Survey, Mine Survey
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Mining”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community