Bio
Experience
-
QIA Group
-
Gold Coast
-
Report Specialist
-
Aug 2021 - Present
-
Gold Coast
Write and process sinking fund report, capital works report, ACT maintenance plan report and insurance valuation report
-
-
-
365 Services Group
-
Brisbane, Queensland, Australia
-
Junior Estimator
-
Apr 2021 - Aug 2021
-
Brisbane, Queensland, Australia
Attend sites and determine scope of works and quote to supply and installCompile accurate estimates and BOQ’sInvolve in all aspects of construction and maintenance
-
-
-
Neumann Developments
-
Gold Coast, Queensland, Australia
-
Intern
-
Aug 2017 - Aug 2018
-
Gold Coast, Queensland, Australia
1. Visiting and overseeing construction process of a depot on Yandina Coolum Rd on the Coolum Beach every month. Solving disputes with the owner from 288 Yandina Coolum Rd regarding accidental land occupancy. Requiring the builder to construct a qualified driveway connecting to the precinct and update exiting road with a bicycle path according to local council’s requirement. 2. Meeting town planner to discuss material change of use on 12 Bienvenue Dr Currumbin Waters QLD 4223. Requiring merging 12 Bienvenue with 14 Bienvenue to construct 2.5 stories apartment for the elderly which also meets the neighbour character requirement of the local council.3. Meeting the site manager of Mcnab every two-week talking about the progress of Miami Ice apartment on 8 Kratzmann Ave Miami QLD 4220. listening and noting down any changes in terms of construction materials, material costs and difficulties that are faced by construction team. Requiring Telstra to change drawing of internet cable tranches. Allocating parking lots for different types of apartment (one bedroom, two bedrooms and three bedrooms). Adding two new electrical recharge posts for electrical cars and setting the optimal recharging percentage at 50% to maximise the usage of the posts.4. Preliminary assessment on 44 Hide street Ashmore QLD to decide whether the land should be developed or sold. Since there were birds needing to bird relocated and the development was difficult as the maximum site coverage cannot be reached after deducting setbacks, car parking, internal roads, and landscaping. Thus, Selling was a better option.Writing reports: 5. Learning to write town planning report for 31-35 Toolona street , including section 1 executive summary in terms of application sought, building height, residential density, car parking and so on, section 2 site & Surrounds regarding topography, vegetation and surrounding environment. Section 4 assessment in terms of State planning regulatory provision.
-
-
-
All Graduates Interpreting & Translating
-
Melbourne, Victoria, Australia
-
Freelance Interpreter ( English and Mandarin)
-
Nov 2013 - May 2016
-
Melbourne, Victoria, Australia
Responsibilities:1. Legal settiing at Magistrate Court Melbourne2. Medical setting at Royal Melbourne hospital and St Vicent hospital3. conference interpreting at Melbourne
-
-
-
River Nile Learning Centre
-
Melbourne, Victoria, Australia
-
Volunteer Staff
-
Jun 2014 - Nov 2014
-
Melbourne, Victoria, Australia
Responsibilities:1. Tutoring basic English to asylum seeker and refugees2. Assisting staff members preparing learning materials3. Customer service for visitors
-
-
Education
-
2016 - 2018Bond University
Master's degree, quantity surveying -
2013 - 2014RMIT University
Bachelor of Arts (International Studies), International Relations and Affairs -
2011 - 2012RMIT University
Advanced Diploma of Translating, Translating ( English to Mandarin) -
2011 - 2012RMIT University
Advanced Diploma of Interpreting, Interpreting -
2010 - 2012RMIT University
Diploma of Interpreting, interpreting
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Business Consulting and Services”
Need a custom project? We'll create a solution designed specifically for your project.
References
Community