Bio
Experience
-
Sojitz Fuso Philippines Corporation
-
Philippines
-
Field Services Engineer
-
Jan 2023 - Present
-
Philippines
-
-
-
UHS Essentials Health Phils. INC
-
Makati, National Capital Region, Philippines
-
Entrepreneur
-
Aug 2020 - May 2023
-
Makati, National Capital Region, Philippines
-
-
-
-
Technical Service Engineer
-
Apr 2015 - May 2023
-
-
-
Lamitek Systems Inc
-
Lawang Bato Valenzuela City
-
Engineering and Maintenance Staff
-
Sep 2014 - Apr 2015
-
Lawang Bato Valenzuela City
-
-
-
Hausmotors
-
Philippines
-
Aftersales Officer
-
Mar 2014 - Aug 2014
-
Philippines
Aftersales Head
-
-
-
Foton Motors
-
Valenzuela City
-
Inventory Custodian / Process Engineer
-
Jul 2012 - Oct 2013
-
Valenzuela City
Stock management, Sales Supply Allocation, Quality Assurance, Ensure Stock Availability, Multi-Department Coordination, Production Planning and Monitoring, Monthly inventory reporting,Production monitoring ,production planning, product development, process flow development, project engineer, quality assurance, inventory management ,team lead, daily output reporting, Technical evaluation, Technical Writing.
-
-
-
Centro Manufacturing Corporation
-
Novaliches, Caloocan City
-
Service and Warranty Engineer
-
Oct 2011 - Jul 2012
-
Novaliches, Caloocan City
Warranty processor,Customer care service, supervised the repair of back job unit, attending customer complaints and servicing all over the Philippines, Monthly tally report on monthly production output VS defects.
-
-
-
Zest-O Corporation
-
Novaliches Caloocan City
-
Cadet Enginner
-
Jul 2010 - Dec 2010
-
Novaliches Caloocan City
Typically involved with processing of materials; the operations and preventive maintenance of manufacturing plant, Production line upgrade. Maintenance of manufacturing systems. Mild exposure to design and development of manufacturing machines. Machine operations (case packer, bottle washer, filling machine.)
-
-
-
First Gen Corporation
-
Bauang Private Power Plant
-
Internship
-
Jan 2010 - Feb 2010
-
Bauang Private Power Plant
Assigned on preventive maintenance and operation team of 215 MW power plant. Maintenance team (Participate on repairs during engine breakdown while on operations, maintain and refurbish replacement parts such as High pressure line ,plate heat exchangers, multistage screw pumps, re-facing of valve seats and valves, assembly of cylinder heads (12RTA96C engine), assembly of plate heat exchanger, calibration and assembly of fuel pump, overhauling of HFO purifier and separators, cleaning of fuel and oil filters), Operation team ( Hourly monitoring of water ,exhaust gas and oil temperatures, steam and oil pressures, oil levels fuel consumptions, checking of turbo charger oil levels and opening of air and pilot fuel valves before engine start up.
-
-
Education
-
2003 - 2010Don Mariano Marcos Memorial State University
Bachelor of Science (BS), Mechanical Engineering
Suggested Services
This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection
Industry Focus. “Wholesale”
Need a custom project? We'll create a solution designed specifically for your project.
References
Social Profiles
Community