Bujar Anggau is a seasoned offshore professional with extensive experience in pipeline installation, riser installation, and control tower operations. He holds a degree in Art/Art Studies from Malaysia High School and has worked for various companies, including PBJV Group Sdn Bhd, Gas Offshore supply to Barakah Offshore Petroleum, and Leighton Asia, India and Offshore.

Experience

  • PBJV Group Sdn Bhd
    • Malaysia Water
    • Control Tower Operator
      • Oct 2014 - Apr 2015
      • Malaysia Water

      Work on board PLB Kota Laksamana 101.Project: Pipeline-PL-381, 10-inch x 21km Pipeline From Tukau-A to West Lutong-C platform. Riser Installation. Client: PETRONAS Carigali Sdn Bhd.

    • Control Tower Operator
      • Jul 2014 - Sep 2014
      • Malaysia Water

      CTO onboard PLB Kota Laksamana 101.Dalak Pipeline development project for client Petronas Carigali Malaysia.

    • Control Tower Operator
      • May 2014 - Jul 2014
      • Malaysia

      CTO on PLB Kota Laksamana 101,for Riser Guard Installation Projectfor client Petronas Carigali sdn.bhd, Malaysia

    • Control Tower Operator
      • Feb 2014 - Apr 2014
      • Malaysia

      CTO onboard Sapura Kencana 900 for Tie in spool and Riser Installation Project at Kemamam, Terangganu.

    • Hong Kong
    • Construction
    • 700 & Above Employee
    • Control Tower Operator
      • Sep 2013 - Nov 2013

      CTO onboard Leighton Faulkner Barge S513 Balongan MOL Project 12 inch pipeline installation ProjectShore Pulling and riser installation.Client : PT Timas Suplindo (Ultimate Client: PT Pertamina E&P

    • Control Tower Operator
      • Aug 2013 - Sep 2013

      CTO onboard Leighton Elipse for Iraq Crude Oil Export Expansion Project( ICOEEP) Phase -1• SPM and Subsea hose maintenance

    • Control Tower Operator onboard Leighton Mynx Barge
      • Sep 2011 - Jul 2013

      Iraq Crude Oil Export Expansion Project( ICOEEP) Phase -1• Installation of SPM• Cable Lay From BVS-ABOT• Tie-In Spool installation• TER2 & NCR installation• Hydro test pipeline• J-Tube installation

    • Control Tower Operator
      • Jul 2011 - Aug 2011

      CTO onboard AWB Nava Thanee Project: Commissioning and Hook-up

    • Control Tower Operator
      • Dec 2010 - May 2011
      • Mangala Field, India

      CTO onboard Leighton Mynx for Mangala Field Development marine facilities.1.Installation of a 2 no. x 24” dia. X 6.0 km long CWC and thermally insulated and heat traced submarine pipeline2.Installation of a SPM & PLEM System (at approximately 28 m water depth) including drilled and grouted piles, anchor chain tensioning and installation, installation of subsea and floating hoses, and installation of telemetry system3.Installation of a 2 no. x 24” dia. X 0.6 km onshore pipelines from the LFP to the Battery Limit Point (BLP.

  • GSP Holding SA
    • Black Sea, Romania
    • Control Tower Operator
      • Aug 2010 - Oct 2010
      • Black Sea, Romania

      CTO onboard Big Foot 3 for Hook up and Commissioning continue with riser installation.

    • Control Tower Operator
      • Apr 2010 - Jun 2010
      • Black Sea, Romania

      Onboard C-Master Barge, for shore pulling Pipeline.

    • Control Tower Operator
      • Apr 2009 - Jun 2009
      • Matak Island

      CTO onboard Swiber Victorious for underwater Survey, Riser Installation and Spool Tie-In

    • Control Tower Operator
      • Aug 2008 - Feb 2009
      • Persian Gulf, iran

      CTO onboard Abouzar 1200 for Pipeline Installation, Jacket Installation and others Sub-sea Installation.

  • Nippon Steel & Sumikin Engineering Co., Ltd.
    • Gulf Of Thailand, Indonesia and Malaysia.
    • Rigger Foreman
      • May 2002 - Jul 2007
      • Gulf Of Thailand, Indonesia and Malaysia.

      Rigger Foreman onboard DLB Kuroshio 2 for variety Offshore Installation Project.1.Jacket Installation2.Pipe line Installation3.Riser Installation4.PLEM installation 5.Others.

    • Rigger
      • Jul 1995 - Mar 2001
      • Asia

      Rigger onboard DLB Kuroshio 2 and Kuroshio 1 for variety Offshore Installation Project.1.Jacket Installation2.Pipe line Installation3.Riser Installation4.PLEM installation 5.Others.

Education

  • Malaysia High School
    Art/Art Studies, General

Suggested Services

This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection

Industry Focus. “Oil and Gas”

Looking to Create a Custom Project?

Need a custom project? We'll create a solution designed specifically for your project.

Get Started

References

Social Profiles

Community

You need to have a working account to view this content. Click here to join now

Similar Profiles