See How Many Clients You're Missing Each Month

Simply enter your business email & Topline AI Agent will show you.

Bio

Generated by
Topline AI

Experience

    • Chief Geologist
      • Sep 2018 - Present
      • Aktobe

  • "Crystal Management" JSC
    • Кызылорда, Кызылординская область, Казахстан
    • Well test supervisor
      • Sep 2017 - May 2018
      • Кызылорда, Кызылординская область, Казахстан

    • Kazakhstan
    • Oil and Gas
    • 1 - 100 Employee
    • Chief geologist
      • Jun 2016 - May 2017

    • Deputy Senior Reservoir Engineer
      • Dec 2015 - Jun 2016

      - Implementation of Technical requirements for projects and reports such as the following:a) Pilot production project during the exploration stage for the wells delineated within C1 reserves category area. b) Appraisal projects for drilling exploration, appraisal and production wellsb) Reserves estimation report

    • Reservoir engineer
      • Feb 2011 - Dec 2015

      - Implementation of Technical requirements (special document where characteristics and conditions of procuring Goods, Work and Services are specified, after which it is attached to the future agreements as an appendix and has a legal validity) for operations required for the following:a) well testing after drilling which in turn includes the operations listed below:- geophysical operations (TCP/wireline perforation, tying of depth/verificatory logging, bridge plug set up for layer isolation (standard/slips explosive packer));- well (dynamic) testing (BU/DD test to identify reservoir characteristics as Pr, Pbh, S (skin factor), formation volume factor, well productivity index, reservoir boundary, etc. Downhole fluid sampling, surface fluid and gas sampling);- stimulation operations by acidising using multicomponent acid and hydrofracturing using propant agent; b) workover:- operations such as substitution of well completion BHA (broken pumps (e.g. sucker rod, etc), reperforation; deep perforation (fracturing via gas explosion);- tubing cleanup from paraffin wax accumulated inside by slickline paraffin cutter/scraper, by hot oiling operations and downhole electric heaters, steaming the X-mas tree, surface oil flowline using steam generators; c) Surface facility installation:- Surface facility procurement for well by well single surface facility installation (such as well head heaters (UN-0.2));Participation in evaluation of all bid (tender) participants to select a winner with the best characterization in terms of equipment availability, experience and other merits; contribution in agreements' examination to check term and conditions of technical part. Finally, participation and control of the work in the field.

Education

  • 2009 - 2010
    Herriot-Watt University
    Master's degree, Petroleum Engineering
  • 2008 - 2009
    Herriot-Watt University
    Academic English Courses
  • 2003 - 2008
    Kazakh National Technical University named by K.I.Satpaev
    Bachelor's degree, Reservoir Engineering

Suggested Services

This profile is unclaimed. These are suggested service rates with 0% commision upon successful connection

Industry Focus. “Oil and Gas”

Looking to Create a Custom Project?

Need a custom project? We'll create a solution designed specifically for your project.

Get Started

References

Social Profiles

Community

You need to have a working account to view this content. Click here to join now

Similar Profiles